| 1 | Removal of 7.5 HP non clock motor into STP by using Chain Block, required man power and Conveying of motor into leath using motor vehicle and also unloading the pump required Labour and machinery etc, complete. |
| 2 | Rewinding Charge of 7.5 HP Motor including fixing of below material into the stator body double coated copper wire with parallel series connction and also using wooden stick, high temperature class fibe sheet and tape and deduction of old coil cost required Labour and machinery etc, complete. |
| 3 | Supply and delivery of7.5 HP Motor Mechanical Shield Top including ofconveyance charges etc, complete. |
| 4 | Supply and delivery of7.5 HP Motor Mechanical Shield Bottom including ofconveyance charges etc, complete. |
| 5 | Supply and delivery of 7.5 HP Motor Bearing Bottom including ofconveyance charges etc, complete. |
| 6 | Supply and delivery of 7.5 HP Motor Bearing Top including ofconveyance charges etc, complete. |
| 7 | Repair and Rectification of top bearing holding cup including of lathe charges, sleeve, drilling, threading work, conveyance, all laboure charges etc, complete. |
| 8 | Removal of 7.5HP Body SS Stud Bold using Welding including oflathe charges, sleeve, drilling, threading work, conveyance, all laboure charges etc, complete. |
| 9 | Supply and Delivery of 20×40 Oil with cost of Material etc, complete. |
| 10 | Supply and Delivery of SS Stud Bolt with cost of Material etc, complete. |
| 11 | Supply and delivery of O Rings set- Nitrile Rubberincluding ofconveyance charges etc, complete. |
| 12 | Rotary Alignment for 7.5 HP Motor including of all laboure, lathe charge etc, complete. |
| 13 | Repair and Rectification of Motor shaft including of lathe charges, Welding, drilling, stoning work, conveyance, all laboure charges etc, complete. |
| 14 | 7.5 HP Non clock motor service Charge and Panel service charge including Fixing of Bearing, Refilling 20×40 oil, Fixing of Motor body using Packing Past with required Labour etc,complete. |
| 15 | Supply and delivery of Motor Temperature Sensorincluding ofconveyance charges etc, complete. |
| 16 | Supply and delivery of Motor Oil Pressure Sensorincluding ofconveyance charges etc, complete. |
| 17 | Supply and delivery of7.5 HP Motor Terminal Board setincluding ofconveyance charges etc, complete. |
| 18 | Supply and delivery of2.5 Sqmm Copper Washer legincluding ofconveyance charges etc, complete. |
| 19 | Supply and delivery of7.5 HP Motor Cable Entry Kitincluding ofconveyance charges etc, complete. |
| 20 | Supply and Delivery of Packing Paste with cost of Material etc, complete. |
| 21 | Fixing of 7.5 HP Non clock motor from the Recycle well by using Chain Block, required man power and Conveying of Motor into stp using motor vehicle and also unloading the motor required Labour and machinery etc, complete. |
| 22 | Removing of Feed Pump including Labour Charge and conveyance etc, complete. |
| 23 | Supply and delivery of Stator (Nitrile) for BDA 108 Pump including of all conveyance etc, complete. |
| 24 | Supply and delivery of Rotor (SS 410 HCP) for BDA 108 Pump including of all conveyance etc, complete. |
| 25 | Supply and delivery of Coupling Rod Pin (Tool Steel HCP) for BDA 108 Pump including of all conveyance etc, complete. |
| 26 | Supply and delivery of Coupling Rod Bush (Tool Steel HCP) for BDA 108 Pump including of all conveyance etc, complete. |
| 27 | Supply and delivery of O Ring (Nitrile) for BDA 108 Pump including of all conveyance etc, complete. |
| 28 | Supply and delivery of Boot Seal (Nitrile) for BDA 108 Pump including of all conveyance etc, complete. |
| 29 | Lathe Work and Service Charge including of all conveyance and laboure etc, complete. |
| 30 | Fixing of Feed Pump including Labour Charge equipment etc, complete. |
| 31 | Removal of 30 HP non clock motor into STP by using Chain Block, required man power and Conveying of motor into leath using motor vehicle and also unloading the pump required Labour and machinery etc, complete. |
| 32 | Rewinding Charge of 30 HP Motor including fixing of below material into the stator body double coated copper wire with parallel series connction and also using wooden stick, high temperature class fibe sheet and tape and deduction of old coil cost required Labour and machinery etc, complete. |
| 33 | Supply and delivery of30 HP Motor Mechanical Shield Top including ofconveyance charges etc, complete. |
| 34 | Supply and delivery of30 HP Motor Mechanical Shield Bottom including ofconveyance charges etc, complete. |
| 35 | Supply and delivery of 30 HP Motor Bearing Bottom and Top including ofconveyance charges etc, complete. |
| 36 | Repair and Rectification of 30 HP Top bearing holding cup including of lathe charges, sleeve, drilling, threading work, conveyance, all laboure charges etc, complete. |
| 37 | Removal of 30HP Body SS Stud Bold using Welding including oflathe charges, sleeve, drilling, threading work, conveyance, all laboure charges etc, complete. |
| 38 | Supply and Delivery of SS Stud Bolt with cost of Material etc, complete. |
| 39 | Supply and delivery of 30HP O Rings set- Nitrile Rubberincluding ofconveyance charges etc, complete. |
| 40 | Rotary Alignment for 30 HP Motor including of all laboure, lathe charge etc, complete. |
| 41 | Repair and Rectification of 30HP Motor shaft including of lathe charges, Welding, drilling, stoning work, conveyance, all laboure charges etc, complete. |
| 42 | 30 HP Non clock motor service Charge and Panel service charge including Fixing of Bearing, Refilling 20×40 oil, Fixing of Motor body using Packing Past with required Labour etc,complete. |
| 43 | Supply and delivery of 30HP Motor Terminal Board setincluding ofconveyance charges etc, complete. |
| 44 | Supply and delivery of6 Sqmm Copper Washer legincluding ofconveyance charges etc, complete. |
| 45 | Supply and delivery of30 HP Motor Cable Entry Kitincluding ofconveyance charges etc, complete. |
| 46 | Fixing of 30 HP Non clock motor from the Recycle well by using Chain Block, required man power and Conveying of Motor into stp using motor vehicle and also unloading the motor required Labour and machinery etc, complete. |