INstallation Of 20Hp Or 25Hp Sewage Pump-Set Trolley And Complete Enm Equipment On Hiring Basis At Any Other Required Location In Ac- 29, 30 Or 31 Under Ee(Enm)M-Viii.-Hiring and continuous operation of a 20 HP sewage dewatering pump-set trolley, having a duty Head: 12-15 Mtr, Discharge: 250 - 280 Cubic Mtr / Hr with Pump Nozzle (Suction: 125mm x Delivery: 100mm). The setup must include the installation of necessary accessories such as Non-Return Valves (NRVs), sluice valves, bends, flanges, and an MS suction line properly lowered into the sump-well, conforming to the site depth with approximately 125-150 meters or as per site requirement of MS delivery pipeline or other suitable pipeline is to be laid from the pump delivery point to the nearest receiving manhole. This includes all required consumables such as nuts, bolts, washers, rubber packing, and execution activities like welding and alignment. In case the pipeline crosses a road, road cutting using hammer machines or JCBs shall be carried out as required, followed by proper reinstatement. Barricading with DJB-labeled warning boards shall be placed at all working locations to ensure public safety.The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels (if any), and provide shelter to operating staff. Round-the-clock staffing is to be ensured with deployment of one Semi-Skilled and one Unskilled worker per shift (three shifts per day) for continuous monitoring and operation. The duties of the deployed staff shall include the operation of the pump-sets, general watch and ward, handling of Diesel Engine / DG set, dewatering of sewage along with floating waste (kachra), cleaning of pump impeller, removal of sludge/silt, and maintenance of hourly log-sheets for the operation of pump-sets and DG sets as per the direction of the Engineer-in-Charge.Note: The entire sewage trolley setup shall consist of two 25 HP pump-sets—one running and one standby—to ensure uninterrupted pumping for 24 hours a day. Diesel and/or electricity required for running the pump-sets shall be provided by the department as per site conditions.Period: 90 Days x 3 Shift = 270 Shifts 2 Hiring of 40 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.Period: 90 Days x 3 Shift = 270 ShiftsNote: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. 3 Hiring and continuous operation of a 25 HP sewage dewatering pump-set trolley, having a duty Head: 12-15 Mtr, Discharge: 270 - 300 Cubic Mtr / Hr with Pump Nozzle (Suction: 125mm x Delivery: 100mm). The setup must include the installation of necessary accessories such as Non-Return Valves (NRVs), sluice valves, bends, flanges, and an MS suction line properly lowered into the sump-well, conforming to the site depth with approximately 125-150 meters or as per site requirement of MS delivery pipeline or other suitable pipeline is to be laid from the pump delivery point to the nearest receiving manhole. This includes all required consumables such as nuts, bolts, washers, rubber packing, and execution activities like welding and alignment. In case the pipeline crosses a road, road cutting using hammer machines or JCBs shall be carried out as required, followed by proper reinstatement. Barricading with DJB-labeled warning boards shall be placed at all working locations to ensure public safety.The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels (if any), and provide shelter to operating staff. Round-the-clock staffing is to be ensured with deployment of one Semi-Skilled and one Unskilled worker per shift (three shifts per day) for continuous monitoring and operation. The duties of the deployed staff shall include the operation of the pump-sets, general watch and ward, handling of Diesel Engine / DG set, dewatering of sewage along with floating waste (kachra), cleaning of pump impeller, removal of sludge/silt, and maintenance of hourly log-sheets for the operation of pump-sets and DG sets as per the direction of the Engineer-in-Charge.Note: The entire sewage trolley setup shall consist of two 25 HP pump-sets—one running and one standby—to ensure uninterrupted pumping for 24 hours a day. Diesel and/or electricity required for running the pump-sets shall be provided by the department as per site conditions.Period: 90 Days x 3 Shift = 270 Shifts 4 Hiring of 50 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.Period: 90 Days x 3 Shift = 270 ShiftsNote: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site.