|
| 1 | Plaster (to wall, floor, ceiling etc) with sand & cement mortarincluding rounding off or cham- fering corners as directed and raking out joints or roughening of concrete surface, including throating, nosing & drip course where necessary (I)15mm thick plasterwith 6:1 cement mortar Page-189, Sl.No.1/I |
| 2 | Neat cement punning 1.5mmthick in wall, dado, window, sills,floor,drain etc.P-192, Sl.No.15 |
| 3 | Scraping of moss, blisters etc.thoroughly from exterior surface of wallsnecessitating the use of scraper, wire brush etc.(Payment against thisitem will be made only when this has been done on the specific directionof the Engineer-in-charge) P-198, Sl.No.B.1 |
| 4 | (b) Priming one coat on timber or plastered surface with synthetic oilbound primer of approved quality including smoothening surfaces by sandpapering etc. Page-200, Sl.No.1/b |
| 5 | (A) Painting with best quality synthetic enamel paint of approved makeand brand including smoothening surface by sand papering etc. includingusing of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white) Page-200, Sl.No.2 |
| 6 | Wood work in door and window frame fitted and fixed in…... Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals).d) sal local P-114, Sl.No.1 |
| 7 | a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. |
| 8 | Supplying best Indian sheet glass panes set in putty and fitted and fixedwith nails and putty complete. (In all floors for internal wall & upto 6m height for external wall) (ii) 4 mm thick P-205, Sl.No.-1 |
| 9 | Glow Sign Board UD & MA, P-14, Sl.No.-4 |
| 10 | Box cutting or filling in Road embankment in all sorts of soil including sperading …...when and where necessary. (a) Depth up to 150 mm. P-237(road), l.No.3.16(a) |
| 11 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm.... (Payment to be made on measurement of finished quantity) p-2 , sl.no- 4/A. |
| 12 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled ... layers when more than one layer is used) completes as per direction.(a) Single brick flat soling (thickness 75 mm.) Page-226, Item.No.1 |
| 13 | Hire and labour charges for shuttering with centreing and necessary staging... of works. (upto roof of ground floor). P-27, Sl.No.12(f) |
| 14 | Nominal Mix (3:1.5:1 Cement concrete with graded stone chips(20 mm.size) excluding shuttering and reinforcement, if any, in ground floor. a) Pakur Variety P-26, Sl.No.10 |
| 15 | GST |
| 16 | Cess |