}

Tender For Maintenance/Fabrication And Repairing Work Of All Equipment’S Of Chp Fuel Oil Pumps, Cleaning & Up-Keeping Of Chp & Fuel Oil Facility Area, Decantation Of Fuel Oil, Attending Lighting Complaints & Electrical Maintenance Of 6.6 Kv/0.4Kv Switch G, Aligarh-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited has published Tender For Maintenance/Fabrication And Repairing Work Of All Equipment’S Of Chp Fuel Oil Pumps, Cleaning & Up-Keeping Of Chp & Fuel Oil Facility Area, Decantation Of Fuel Oil, Attending Lighting Complaints & Electrical Maintenance Of 6.6 Kv/0.4Kv Switch G. Submission Date for this Tender is 23-08-2025. Fabrication Work Tenders in Aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

50266752
Tender For Maintenance/Fabrication And Repairing Work Of All Equipment’S Of Chp Fuel Oil Pumps, Cleaning & Up-Keeping Of Chp & Fuel Oil Facility Area, Decantation Of Fuel Oil, Attending Lighting Complaints & Electrical Maintenance Of 6.6 Kv/0.4Kv Switch G
Tender
Indian
Uttar Pradesh
Aligarh
23-08-2025

Tender Documents

Tender Details

Maintenance/Fabrication and repairing work of all equipment’s of CHP fuel oil pumps, Cleaning & Up-keeping of CHP & Fuel Oil Facility area, Decantation of Fuel Oil, attending lighting complaints & electrical maintenance of 6.6 KV/0.4KV switch gear, motors & other electrical system as per scope of work” at CHP, ‘C’TPS, HTPS, Kasimpur Thermal Power Plant, Kashimpur, Harduaganj, Aligarh, U.P. - MAINTENANCE OF CONVEYORS SYSTEM (in sub part: 1.01 - 1.80) 2 Replacement of different size of conveyor drums. 3 Greasing/overhauling of conveyor drums. 4 Repairing of conveyor drum of any size. 5 Replacement of gear coupling /pin bush coupling between motor and redactor at belt feeder/wagon tippler/electric wagon pusher. 6 Replacement of electric winch trolley wheel shaft of conveyor bearing at conveyor 5A/5B. 7 Replacement of rope shaft of electric winch trolley of conveyor 5A/5B. 8 Replacement of driving steel wire rope by new one at conveyor 5A/5B. 9 Repairing of driving steel rope at conveyor 5A/5B. 10 Fabrication and replacement of raw coal bunker grating. 11 Repairing of raw coal bunker grating. 12 Fabrication and fitting of rubber scrapper on return side of conveyor at coal discharge hopper of conveyor. 13 Fabrication and installation of tension trolley / device at conveyor system/belt feeder system. 14 Replacement/repair of pulley/wheel or any other component of tension trolley device at conveyor system/belt feeders. 15 Replacement of inhaul/outhaul rope by new / old one. 16 Replacement of sheave assembly of inhaul/outhaul system. 17 Repairing/overhauling of sheave assembly of inhaul/outhaul system. 18 Replacement of gear coupling/pin bush coupling of redactor to drum or redactor to motor of any conveyor. 19 Overhauling of wheel support assembly of Russian wagon tippler. 20 Overhauling of R/G box of any conveyor/Russian wagon tippler 21 Replacement of R/G box of any conveyor / Russian wagon tippler 22 Welding of clits at rail line of plate form of Russian wagon tippler. 23 Repairing /overhauling of swinging feeder. 24 Repairing/replacement of scrapper at any conveyor. 25 Repairing/replacement of damper at any conveyor. 26 Re-railing the derailed coal wagon- Empty coal wagon 27 Re-railing the derailed coal wagon- Loaded coal wagon 28 Fabrication and replacement of center plate at TP-1/TP-2. 29 Fabrication and replacement of side plate at hopper of any conveyor. 30 Repairing / Replacement of Horizontal shock absorbers of RWT 31 Repairing of platform of RWT 32 Repairing of wheel foundation Assembly of RWT 33 Overhauling /Replacement of rest wall roller and roller system of RWT. 34 Repairing and strengthening of rest wall 35 Alignment of guide roller 36 Repairing of cradle beam 37 Replacement of suspension of wheel assembly of electric pusher car 38 Repairing/ replacement of wheel assembly of electric pusher car 39 Replacement of ceiling / hook of crane of electric pusher car 40 Replacement of bush of wheel of electric pusher car 41 Repairing of trolley platform of electric pusher car 42 Replacement of kamani of electric pusher car 43 Repairing / replacement of buffer of electric pusher car 44 Reloading of ceiling on pulley 45 Re railing of tension trolley on channel 46 Fabrication and erection of new foundation of redactor of swinging feeder. 47 Fabrication and erection of new foundation of motor of swinging feeder or winch trolley. 48 Fabrication & erection of opening of swinging feeder. 49 Alignment of winch trolley Track of Conveyor no. K-5A/5B. 50 Laying of water line of 63 mm dia of shower pipe 51 Fabrication and Erection of L-Band of shower pipe 52 Erection of Isolating Valve 40 mm dia of shower pipe 53 Drilling of holes of 4 mm dia on shower pipe 54 Fabrication and erection of Flange joint of shower pipe 55 Fabrication & Erection of support of shower pipe 56 Repairing of any key way and key of any shaft by welding and machining. 57 Repairing of bore of gear coupling-Motor Side of conveyor K-3A/3B 58 Repairing of bore of gear coupling- Drum side of conveyor K-3A/3B 59 Repairing of bore of gear coupling- Motor side of conveyor K-1,K-2A/2B,K-4A/4B & K- 5A/5B 60 Repairing of bore of gear coupling- Drum Side of conveyor K-1,K-2A/2B,K-4A/4B & K- 5A/5B 61 Repairing of bore of gear coupling- Motor /rotor side of Russian coal crusher 62 Repairing/replacement of fire hydrant valve 63mm. 63 Laying of fire hydrant line up to a length of 10 mtrs. 64 Fabrication and installation of hold back system using gear socket and lock. 65 Repairing of grating of hoppers of Russian wagon tippler with help of rail line pieces. 66 Repairing of grating of hopper of swinging feeder. 67 Repairing beam of Russian Wagon Tippler/swinging feeder. 68 Replacement of beam of Russian Wagon Tippler /Swinging feeder. 69 Repairing / Replacement of valve of different size of conveyor shower system. 70 Repairing of roof of swinging feeder 71 Fabrication of bearing cover of redactor of electric pusher/Rest wall roller system. 72 Greasing of gear coupling between motor to Redactor or Redactor to drum of different conveyor/Belt Feeder /RWT 73 Replacement of counter weight ceiling of Inhaul/ outhaul system. 74 Top-up of oil of RG Box of conveyor/Belt Feeder/RWT/Swinging feeder/ Electric winch trolley. 75 Strengthening of any transfer hopper by providing supports between hopper and conveyor structure along with side plates 76 Strengthening of motor foundation/ RG Box foundation of any conveyor system/ RWT 77 Replacement of any damaged ceiling of tension trolley of any conveyor - 78 Fabrication of motor/ RG Box foundation of any conveyor system/ RWT 79 Replacement of any channel along with its support up to 5 meter of any conveyor system. 80 Fabrication and erection of grating of conveyor 3A/3B 81 Replacement of pinion of swinging feeder/ electric winch trolley 82 General Cleaning (Unit is Running Condition/ under Forced shut-down ) as per scope of work 83 Schedule of Quantities & Rates for COAL CRUSHER (in sub part: 3.01 - 3.45) 84 Removal of old & worn-out hammer set of Russian crusher after opening the crusher body. 85 Fitting of new hammer set after weighing them. 86 Balancing of old &used hammer set by re-moralizing & cutting. 87 Fitting of old & used balanced set of hammer by reversal of direction of complete hammer set. 88 Taking out of damaged rotor assembly. 89 Fabrication of old rear /front side grating from 20/40mm. 90 Replacement of 20mm /40mm thick rear side grating. 91 Replacement of 20mm /40mm thick front side grating. 92 Removal of rear half body of crusher after cutting pieces of the top hopper. 93 Removal of front half body of crusher after cutting pieces of top hopper 94 Refitting of rear half body of crusher & fitting of removed pieces on top hopper. 95 Refitting of front half body of crusher & fitting of removed pieces on top hopper 96 Replacement of crusher beam liner. 97 Fabrication of square plate. 98 Replacement of square plate 99 Fabrication & replacement of complete crusher body liner. 100 Fabrication of bypass damper. 101 Replacement of bypass damper. 102 Fabrication of crusher by pass grating. 103 Replacement of crusher by pass grating. 104 Fabrication & replacement of any one liner of crusher body. 105 Repairing of moving trolley having 3 no front gratings. 106 Repairing of rear side stationery grating, Frames. 107 Fitting of repaired rotor assembly. 108 Removal of damaged / useable rotor bearing no.3656/22356. 109 Fitting of new /useable rotor bearing no.3656/22356. 110 Removal of coupling of crusher rotor. 111 Removal of coupling of motor rotor. 112 Fitting of coupling of crusher rotor. 113 Fitting of coupling of motor rotor. 114 Removal of rotor of motor. 115 Fitting of rotor of motor. 116 Static balancing of crusher rotor. 117 Shifting of crusher motor stator from crusher house to turbine hall. 118 Shifting of crusher stator from turbine hall to crusher house. 119 Shifting of crusher rotor from crusher house to turbine hall. 120 Shifting of crusher rotor from turbine hall to crusher house. 121 Repairing of crusher half body ( rear /front ) by 25mm/32mm thick ms plate. 122 Greasing of bearings of crusher rotor. 123 Removal of chocking of crusher from coal. 124 Tightening of 22nos foundation bolts of crusher. 125 Hard facing in the working surfaces of coal crusher hammers (69nos) by welding process. 126 Alignment of crusher rotor with motor rotor. 127 Remetalizing of Coal Crusher Hammers (69 Nos.) by welding process 128 Matching of white metal bearing of motor rotor 129 Schedule of Quantities & Rates for RUSSIAN W/T (in sub part: 4.01 - 4.12) 130 Repairing / replacement of vertical shock absorbers. 131 Strengthening of flanges of pipe bracing at non-driving end. 132 Repairing / Overhauling of guide rollers. 133 Strengthening of cradle beam. 134 Strengthening of bottom beams of platform. 135 Rubber lining on Rest walls. 136 Replacement of worn out plate form rails. 137 Fabrication & erection of hopper of belt feeder. 138 Repairing / overhauling of stop rollers of Russian wagon tippler. 139 Checking / tightening & replacement of bolts provide for fixing the spur gear at both the sides of tippler. 140 Alignment of pinion to spur gear & gear box. 141 Repairing/ replacement of pinion shaft/ pinion gear 142 Schedule of Quantities & Rates for Conveyor Belt (in sub part: 5.01 - 5.14) 143 Cutting, splicing, cleaning of both sides of conveyor belt to be jointed together and vulcanizing of joint by Cold process size 1000mm wide conveyor belt. 144 Cutting, splicing, cleaning of both sides of conveyor belt to be jointed together and vulcanizing of joint by Cold process size 1200mm wide belt. 145 Cutting, splicing, cleaning of both sides of conveyor belt to be jointed together and vulcanizing of joint by Cold process size1400mm wide belt. 146 Removal of Old damaged/partly useable and laying of new/reusable belt. 147 Dragging of belt on Conveyor Super-structure. 148 Fastener Jointing on belt. 149 Shifting of Conveyor belt from ‘0’M to + 30M at conveyor 5A/5B. 150 Repairing of torn out belt by stitching with G.I. wire. 151 Repairing the damaged fastener joint by stitching with G.I. wire - Upto half Joint length. 152 Repairing the damaged fastener joint by stitching with G.I. wire - More than half joint length. 153 Refixing of side skirt rubber which comes out from its place(one side) 154 Removal of old/damaged side skirt rubber, fabrication of new side rubber and fixing it on its place. 155 Dismantling and refitting of discharge hoppers of wagon tippler (above belt feeders) for replacement/re-jointing of conveyor belt of belt feeder. 156 Patch work of repairing of small cuts of 10x100Cm size by fixing rubber with cold solution by preparing the surface properly. 157 Schedule of Quantities & Rates for chute maintenance (in sub part: 6.01 - 6.10) 158 Fabrication and replacement of complete mother plate 10/12 mm of any hopper of conveyor system. Size of hopper 850 to 1200 mm width and 4 to 5meter height. 159 Fabrication and replacement of complete liner plate 8/10 mm of any hopper of conveyor system. Size of hopper 850 to 1200 mm width and 4 to 5 meter height. 160 Fabrication and replacement of complete single plate 10/12 mm of hopper of any transfer point. Size of hopper 850 to 1200 mm width and 4 to 5 meter height 161 Repairing of any hopper by patch work with following size MS plate Up to 300x300 mm. 162 Repairing of any hopper by patch work with following size MS plate Up to 400x400 mm. 163 Repairing of any hopper by patch work with following size MS plate Up to 600x600 mm. 164 Repairing of any hopper by patch work with following size MS plate Up to 850x400 mm. 165 Repairing of any hopper by patch work with following size MS plate Up to 850x600 mm 166 Fabrication and replacement of supporting structure of any conveyor. 167 Strengthening of overhead conveyors by use of plates, angles, channels and joints. 168 Schedule of Quantities & Rates for Repairing and greasing of conveyors rollers & drums (in sub part: 7.01 - 7.25) 169 Servicing of Steel rollers of 1200 mm conveyor 170 Servicing of Steel rollers of 1400 mm conveyor 171 Servicing of Steel rollers of 1000 mm conveyor 172 Servicing of Rubberized roller 1200 mm conveyor 173 Servicing of Rubberized roller 1400 mm conveyor 174 Servicing of Rubberized roller 1000 mm conveyor 175 Servicing of Return roller 1200 mm conveyor 176 Servicing of Return roller 1400 mm conveyor 177 Servicing of Return roller 1000 mm conveyor 178 Greasing/Servicing of Bearing of drive drum of 1400 mm conveyor 179 Greasing/Servicing of Bearing of drive drum of 1200 mm conveyor 180 Greasing/Servicing of Bearing of drive drum of 1000 mm conveyor 181 Greasing/Servicing of Bearing of driven drum of 1400 mm conveyor 182 Greasing/Servicing of Bearing of driven drum of 1200 mm conveyor 183 Greasing/Servicing of Bearing of driven drum of 1000 mm conveyor 184 Greasing/Servicing of Bearing of snub drum of 1400 mm conveyor 185 Greasing/Servicing of Bearing of snub drum of 1200 mm conveyor 186 Greasing/Servicing of Bearing of snub drum of 1000 mm conveyor 187 Greasing/Servicing of Bearing of counterweight pulley of 1400 mm conveyor. 188 Greasing/Servicing of Bearing of counterweight pulley of 1200 mm conveyor. 189 Greasing/Servicing of Bearing of counterweight pulley of 1000 mm conveyor. 190 Servicing/Greasing of guide rollers of Winch trolley of conveyor K-5A&5B. 191 Repairing idler frame of any conveyor. 192 Decantation of LDO/LSHS from BTPN rakes by making connection for unloading and making disconnection after unloading. 193 Decantation of LDO/LSHS from Road Tankers by making connection for unloading and making disconnection after unloading. 194 Schedule of Quantities & Rates for Repairing &maint. of FO/LDO/LSHS system (in sub part: 8.01 - 8.12) 195 Cleaning of FO/LDO/LSHS storage tanks of 1000 KL capacity 196 Cleaning of FO/LDO/LSHS storage tanks of 500 KL capacity. 197 Cleaning of settling tanks of 100 KL Capacity 198 Cleaning of underground pits. 199 Overhauling of Rotary Pump- Capacity 200Kl/hr. Motor capacity 55 KW. 200 Overhauling of Russian Pump- Capacity 150 Kl/hr. Motor capacity 50 KW. 201 Overhauling of Gear Pump- Capacity 75 Kl/hr. Motor capacity 37 KW. 202 Complete overhauling of secondary oil pumps-Drainage Pump- Capacity 5KW. 203 Complete overhauling of secondary oil pumps-Channel Pump Capacity up to 5 KW. / de-watering pump Capacity up to 15 KW. 204 Cleaning of all oil Filters of Rotary/Russian Pump 205 Cleaning of all oil Filters of Gear Pump 206 Repairing of Steam/oil Valves of Different Sizes 207 Attending lighting complaints and assistance in electrical Maintenance of 6.6 KV/ 0.4KV switch gear and motors in shift as per scope of work. Time of Shift [20:00 Hrs to 06:00 Hrs. (02 Hrs Rest)]

Key Value

Document Fees
INR 3540 /-
EMD
INR 65400.0 /-
Tender Value
INR 32.69 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail