| 1 | Labour Component |
| 2 | Survey and demarcation over 1 Hacatre(2 DL x 323.00 = 646.00) |
| 3 | Cleaning the plantation areaby cutting bushes,unwantedweeds etc. Over 1 Hactare(6 DL x 323.00 = 1938.00) |
| 4 | Digging planting pits of size 60 cmX 45 cmX 45 cm over 1 ha. for 1600 nos.(61 DL x 323.00 = 19703.00) |
| 5 | Filling up planting pits with weatheredearth over 1600 nos.(18 DL x 323.00 = 5814.00) |
| 6 | Transplanting of pottedseedling including carriage fromroad side stock yard for 1600 Nos.(24 DL x 323.00 = 7752.00) |
| 7 | Causalityreplacement by planting seedling over 1 Hectare @ 10% of total seedling(4 DL x 323.00 = 1292.00) |
| 8 | 1st time weeding- cleaning,mulchingincluding application of organic manure over 1 Hactare(18 DL x 323.00 = 5814.00) |
| 9 | 2nd time weeding- cleaning,mulching including application of organic manure over 1 Hactare(17 DL x 323.00 = 5491.00) |
| 10 | 3rd time weeding- cleaning,mulching(15 DL x 323.00 = 4845.00) |
| 11 | Watch and ward(Protection of plantationby engaging Mazdoors)(48 DL x 323.00 = 15504.00) |
| 12 | Erection of nylon net fencing(7 DL x 323.00 = 2261.00) |
| 13 | Add GST @ 18% on Labour Component |
| 14 | Add Contractor\"s Profit @ 10% on Labour Component |
| 15 | Add GST @ 18% on Contractor\"s Profit |
| 16 | Material Component |
| 17 | Supply of bamboobasket, coir rope etc.(1 LS x 1000.00 = 1000.00) |
| 18 | Staking of planted seedling by using bamboo sticks over 1600 nos.including supply of sticks(1600 Nos x 10.00 = 16000.00) |
| 19 | Supply of bamboo for fencing(50 Nos x 300.00 = 15000.00) |
| 20 | Supply of nylon net for fencing (farming net 3\" x 3\")(14 Kg x 330.00 = 4620.00) |
| 21 | Supply of manure for plantation(1 LS x 2000.00 = 2000.00) |
| 22 | Supply of one year old seedling including carriage (10% extra)(1800 Nos x 25.00 = 45000.00) |
| 23 | Add GST @ 5% on Material Component |
| 24 | Labour Welfare Cess @ 1% |
| 25 | Casual hiring of Boats or Launch (including Fuel) for regular watching and patrolling the planting site for 3 Ranges (150 days X 3 Ranges) = 450 days @ Rs. 5000 per day per boat or launch |
| 26 | Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x75x6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45x45x60 cm below ground levels per approved drawing and clause 801 of specifications for Road &Bridge Work of MoRT&H (5th Revision |
| 27 | Add GST @ 18% on retro- reflective sign board |
| 28 | Labour Welfare Cess @ 1% on retro- reflective sign board |