|
| 1 | Installation of high speed Wi-Fi network |
| 2 | Supply & InstallationNetwork PoE+ Switch 24 port POE+Switch(As per the Tender Specification) |
| 3 | Supply & Installationof Wireless Controller with Lic for 33 Access Points (As per the Tender Specification) |
| 4 | Supply & Installation of WiFi6 Indoor WiFi Access Point |
| 5 | Supply & Installation of 10G SFP+ LR Optics (10 KM) |
| 6 | Supply 12U (500 mm x 500 mm) High Quality (As per the Tender Specification) |
| 7 | Supply & Installation of 1 KVA online UPS with 15 Min Backup |
| 8 | Supply & Installation of Cat 6 Cable ( 305 Mtr ) |
| 9 | Supply & Installation of Cat 6 patch panel 24 port fully loaded |
| 10 | Supply & Installation of CAT6 Patch cable 1mtr |
| 11 | Supply & Installation of CAT6 I/O with SMB Box |
| 12 | Supply & Installation of 6 Core Single Mode Fiber Cable armoured |
| 13 | Supply & Installationof 6 port LIU Fully Loaded with Patch Cord |
| 14 | Supply & Installationof 12 port LIU Fully Loaded with Patch Cord |
| 15 | Supply & Installationof 32mm HDPE Pipe |
| 16 | Supply & Installationof 25mm Conduits |
| 17 | Supply & Installationof 100/50MM PVC Channel for Shaft |
| 18 | Supply & Installationof Bands and Junctions Boxes |
| 19 | Accessories Items like Giti and Paches and other accessories like Cable tie , Drill Bit, Cable Dressing Velcro |
| 20 | Cable Manager for Rack Cable Dressing Best Quality |
| 21 | Laying of Cat 6 Cable |
| 22 | Laying of 6 Core Single Mode Fiber Cable armoured |
| 23 | Laying of 32mm HDPE Pipe with Clamp on wall or through Soil digging hard or Soft Surface etc. |
| 24 | Laying of 25 mm Conduite Pipe/Channel/Flexible |
| 25 | Laying of Channel 100/50MM |
| 26 | Installation of LIU ,Spicing of all Fiber Core , Labling , Marking of Cable and Ports ,etc |
| 27 | Labeling of Ferrule/Lables & Identifiers |
| 28 | Punching of Cables on Jack Panel |
| 29 | Punching of Cables on I/O |
| 30 | Rack Dressing 12U |
| 31 | Configuration required atL3 Core Switches at Computer Centre toMaking Separate VLAN for Building. |
| 32 | Configuration required atFirewallat Computer Centre toMaking any changes to run Internet in Building. |
| 33 | Installation, Testing and commissioning ofEdge Switches |
| 34 | Installation, Testing and commissioning of WIFI System with Controller with Data Analytics reports |