Mmsm Capital Repairs-Repair And Overhauling Of Various Mill Area Equipment And Repair Of Structural => Limited; 1 510002734 REVISIONING / REPAIR OF HOOK UP/DOWN TROUGHS OF FMT 12.000 EA 3,994.20 47,930.40 2 510002735 REVISIONING OF RAIL TILTING MECHANISM. 8.000 EA 9,858.31 78,866.48 3 510002736 RECTIFICATION OF HORIZONTAL CLAMPING OF FMT 20.000 EA 9,858.31 197,166.20 4 510002737 REVISIONING AND RECTIFICATION OF SPINDLE SUPPORTS. 2.000 EA 11,332.37 22,664.74 5 510002602 TILT ROLLER ASSLY CHANGING 5.000 EA 2,662.79 13,313.95 6 510002778 ALIGNMENT OF BRAKING FLAPS,SEPARATING BAR OF 2 COOLING BEDS 1.000 LS 45,330.69 45,330.69 7 510002703 COOLING BED LEVER CYLINDERS CHANGING. 2.000 EA 9,858.31 19,716.62 8 510002779 REVISIONING OF AXIAL ADJUSTMENT SYSTEM OF LHS STRAIGHTENER. 1.000 LS 19,546.70 19,546.70 9 510002780 DIVIDING BEAM CHANGING. 1.000 EA 23,456.07 23,456.07 10 510002561 CONVEYOR GEARBOX OVERHAULING. 100.000 EA 1,266.57 126,657.00 11 510002781 REPLACEMENT OF RACKS IN THE COOLING BED. 20.000 EA 633.20 12,664.00 12 510002738 PAWL OVERHAULING OF ALL THE STANDS. 27.000 EA 1,899.78 51,294.06 13 510002739 STAND CLAMPING SYSTEM OVERHAULING FOR ALL THE HORIZONTAL STANDS OF RMT & IMT 6.000 SET 3,296.59 19,779.54 14 510002740 CARRIAGE OVERHAULING OF STANDS 20.000 EA 1,899.78 37,995.60 15 510002741 SUPPLY UNITS OVERHAULING. 20.000 EA 1,899.78 37,995.60 16 510002579 TUNNEL VALVES REPLACEMENT / REVISIONING DIA 500 RMT 2.000 EA 11,399.23 22,798.46 17 510002782 OVERHAULING OF ADJUSTABLE GUIDES. 3.000 EA 3,799.72 11,399.16 18 510002783 FOUNDATION BOLTS TIGHTENING OF 500 KN SHEAR 1.000 SET 1,899.78 1,899.78 19 510002784 FOUNDATION BOLTS TIGHTENING OF 800 KN SHEAR 1.000 SET 1,899.78 1,899.78 20 510002786 DIVERTER SWITCH DISMANTLING / REPLACEMENT OF WORN OUT PARTS. 1.000 LS 18,998.73 18,998.73 21 510002788 REPAIR OF TROUGHS AND ALIGNMENT OF BATCHING. 1.000 LS 45,925.43 45,925.43 22 510002742 STAND BUGGY CAR REPAIR. 3.000 SET 14,417.74 43,253.22 23 510002743 TROUGH REPAIR BEFORE STAND-9,15 AND AFTER STAND-8,14 4.000 EA 1,899.78 7,599.12 24 510002745 CONTACT BOX REPAIR INCLUDES BOX PLATE REPAIR. 2.000 EA 1,899.78 3,799.56 25 510002746 CONTACT BOX CUSHIONING SPRING CHANGING 40.000 EA 94.63 3,785.20 26 510002789 DIVIDING SECTION BEARING REVISIONING AND SHAFT ALIGNMENT. 80.000 EA 474.92 37,993.60 27 510002614 REVISIONING OF COOLER VALVES,COOLER TUBES 17.000 EA 2,632.93 44,759.81 FLUSHING AND CLEANING OF THE OUTSIDE OF THE COOLER. 28 510002562 GEARBOX END COVER RECTIFICATION 3.000 EA 4,227.55 12,682.65 29 510002798 PLUMMER BLOCKS OF BRAKING FLAP AND SEPARATING BAR REVISIONING. 30.000 EA 1,982.02 59,460.60 30 510002705 CHAIN LIFTING LEVER PINS REVISIONING. 12.000 EA 5,285.36 63,424.32 31 510002706 BATCHING PUSHER FIXING LEVERS REPAIR. 3.000 EA 3,964.01 11,892.03 32 510002751 BATCHING AFTER STRAIGHTENER ADJUSTABLE GUIDE REPAIR. 1.000 EA 4,758.18 4,758.18 33 510002563 BRAKING FLAP DRIVE GEARBOX CHANGING. 1.000 EA 10,043.58 10,043.58 34 510002793 BRAKING FLAP BUSHES CHANGING. 40.000 EA 462.55 18,502.00 35 510002794 SEPARATING BAR BUSH CHANGING. 20.000 EA 462.55 9,251.00 36 510002607 TILTING ROLLER FRAME BASE REPAIR. 1.000 LS 20,088.47 20,088.47 37 510002608 CHANGING OF BOTTOM ROLL. 1.000 LS 11,851.61 11,851.61 38 510002715 COOLING BED TRANSFERING EQUIPMENT SECTION CHANGING / REPAIR. 2.000 EA 17,777.44 35,554.88 39 510002694 REPLACEMENT OF COOLING GRATE SHAFT. 1.000 SET 59,258.09 59,258.09 40 510002672 STRUCTURAL WORKS:-FABRICATION,STRUCTURAL REPAIR WORKS FOR FLOOR PLATES,APRON PLATES MAINTENANCE,PLATFORMS,WALKWAYS,HAND RAILS,GRILLS ETC.& OTHER MISCLLANIOUS STRUCTURE LADDERS ETC,STRUCTURAL REPAIR OF CVS,SAFETY GRILLS,MAKE UP BLOWER FARME. 80.000 TO 10,382.74 830,619.20 41 510002646 REPAIR AND LAYING LOW PRESSURE WATER PIPE LINES UPTO DN 50 300.000 RM 137.17 41,151.00 42 510002648 REAPIR AND LAYING OF LOW PRESSURE PIPE LINES ABOVE DN 65 TO DN100 100.000 RM 263.72 26,372.00 43 510002643 REPAIR AND LAYING OF LOW PRESSURE PIPE LINES/AIR LINES ABOVE DN 100 TO DN 150 200.000 RM 677.61 135,522.00 44 510002645 REPAIR AND LAYING OF LOW PRESSURE LINES BETWEEN DN 250 AND DN 350 AND ABOVE 12.000 TO 15,684.85 188,218.20 00 01 02 03 04 05 06 07 Cond No FOR JOBS 1 TO 31 This scope covers dismantling of the equipments from their foundations/installations, and through cleaning of these foundations/installations from where these equipments were removed. It also covers through overhauling of the dismantled the equipment as per the drawings and directions of the VSP engineer including the cleaning, changing of the spare parts, seals, fittings and pipe connections as may be required. The scope further covers re-installation of the overhauled/new equipment on the foundation, leveling and alignment, all as per the drawing and requirement of the VSP engineer. Rectification of the defects to be one immediately as required all incidental like welding, gas cutting, drilling, lapping and grinding etc. required for completion of the work is in contract scope. FOR JOB 1 Removal and repair of chequered plates, removal of section structure. Removal of trough and the clevis with hydraulic cylinders. Strengthening of the base structure. FOR JOB 2 Removal of arm pins, removal of stopper bolts, changing of brass bushes, replacement of pins, alignment of arms with the parent structure. FOR JOB 3 Isolation of the cylinder, removal of hook, pin and cylinder, overhauling of the pivot. FOR JOB 4 Removal of spindle support, welding worn out portion. FOR JOB 5 Fixing of tilt roller, removal of old roller, revisioning of old roller from the equipment. FOR JOB 7 Job involves replacement cooling bed cylinder lever of the equipment and revisioning of the cylinder. Necessary supporting structures are to fabricated. Special tools and tackles like hydraulic jacks etc. to be arranged. FOR JOB 8 Axial adjustment of RHS involves removal of the bottom bolts. Rectification of the lube pipe. 08 09 10 11 12 13 14 15 16 FOR JOB 9 Locking of the braking device, removal of the frame with troughs, remove the pull rods. Placement of the prepared beam assembly, alignment of frames with troughs. FOR JOB 10 De-coupling, removal of the gear box, replacement of the seals, changing of the bearings with needs replacement, cleaning of the housing, assembly painting of the gear box. FOR JOB 11 Removal of pins, repair of damaged base if required, replacement of racks and adjustment. FOR JOB 12 Removal of hydraulic and water lines, removal of supply unit, removal of pins, removal of springs and shaft and replacement if necessary, reassembling. FOR JOB 13 Removal of stand clamping pins, overhauling of tie rods, replacement of damaged parts, alignment with cassette. FOR JOB 14 Jam removal of the grease points using hydraulic pump. FOR JOB 15 Changing of guide pins, water pipe, springs. FOR JOB 16 i) Removal of the wall and overhauling the bonnet spindle, revisioning/replacement ii) Removal of the wall and overhauling the bonnet spindle O-ring replacement. iii) Necessary arrangements for handling to be made by the FOR JOB 17 Removal of guide, changing the guide lining plates, freeing of pins, roller bearing changing 17 18 19 20 21 22 23 24 25 26 FOR JOB 18 & 19 Making the hydraulic kit ready, tightening of the nuts. FOR JOB 20 Changing of crank liners, changing the switch block, repair of grease lines, gear boxes overhauling, pneumatic cylinder overhauling. FOR JOB 21 i) Changing of the trough if required and alignment of trough and plate welding. ii) Alignment of all the installed troughs in both batching (approximately 60 nos.) in agency scope. FOR JOB 22 Removal of buggy plates, removal of pins of the cylinder, replacement of the cylinder with the new hoses. FOR JOB 23 Removal of existing trough, repair of base frame, repair of trough. FOR JOB 24 Repair of base frame, tube of the contact box, replacement of the contact box wherever required. FOR JOB 25 Removal of damaged spring assembly, changing of spring. FOR JOB 26 Plummer block covers opening, clean the old grease, check for the bearing and tightness of the check nut. Alignment of the shaft with respect to the trough on the top. FOR JOB 27 Overhauling of cooler valves, individual tube flushing,fin cleaning, and damaged pipe lines changing and guide point preparation. FOR JOB 28 Cooling grates gear box end cover plate fixing rectification:- The job involves thorough cleaning of the gear box, removal of the make shift supporting arrangements, preparation of jig for mounting magnetic ,,,, more in document