Tender For Running Rate Works Contract For Ottapidaram Sub Division Of Urban/Tuticorin Division, tuticorin-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited has published Tender For Running Rate Works Contract For Ottapidaram Sub Division Of Urban/Tuticorin Division. Submission Date for this Tender is 30-07-2025. Prime Mover Tenders in tuticorin Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

50189396
Tender For Running Rate Works Contract For Ottapidaram Sub Division Of Urban/Tuticorin Division
Tender
Indian
Tamil Nadu
Tuticorin
30-07-2025

Tender Documents

Tender Details

Running Rate Works Contract For Ottapidaram Sub Division Of Urban/Tuticorin Division Normal Ground - Excavation of Pole Pit (1.25m x 0.5m x 1.5m) for 8m PSC Pole (200Kg) , Normal Ground - Erection of 8m PSC Pole (200Kg) , Rocky Ground / Medium - Excavation ofPole pit(1.25m x 0.5m x 1.5m) for 8m PSC Pole (200Kg) , Rocky Ground / Medium - Erection of 8m PSC Pole (200Kg) , Hard Rocky Ground - Excavation ofPole pit(1.25m x 0.5m x 1.5m) for 8m PSC Pole (200Kg) , Hard Rocky Ground - Erection of 8m PSC Pole (200Kg) , Normal Ground - Excavation of Pole Pit (1.25m x 0.6m x 1.83m) for 9m PSC Pole , Normal Ground - Erection of 9m PSC Pole , Rocky Ground / Medium - Excavation ofPole pit(1.25m x 0.6m x 1.83m) for 9m PSC Pole , Rocky Ground / Medium - Erection of 9m PSC Pole , Hard Rocky Ground - Excavation ofPole pit(1.25m x 0.6m x 1.83m) for 9m PSC Pole , Hard Rocky Ground - Erection of 9m PSC Pole , Normal Ground - Excavation of Pole Pit (1.25m x 0.6m x 2.19m) for above 9.14 poles Steel Joists 36 length/Rail pole , Normal Ground - Erection ofPit (1.25m x 0.6m x 2.19m) for above 9.14 poles / Steel Joists 36 length/Rail pole , Rocky Ground / Medium - Excavation ofPole pit (1.25m x 0.6m x 2.19m) for above9.14 poles/ Steel Joists 36 length/Rail pole , Rocky Ground / Medium - Erection ofPit (1.25m x 0.6m x 2.19m) for above 9.14 poles Steel Joists 36 length/Rail pole , Hard Rocky Ground - Excavation ofPole pit(1.25m x 0.6m x 2.19m) for above 9.14 poles Steel Joists 36 length/Rail pole , Hard Rocky Ground - Erection of above 9.14 poles Steel Joists 36 length/Rail pole , Normal Ground - Excavation of Pole Pit (1.25m x 0.6m x 2.56m) for Steel Joists 42 length , Normal Ground - Erection of Steel Joists 42 length , Rocky Ground/Medium - Excavation of Pole Pit (1.25m x 0.6m x 2.56m) for Steel Joists 42 length , Rocky Ground/Medium - Erection of Steel Joists 42 length , Hard Rocky ground - Excavation of Pole Pit (1.25m x 0.6m x 2.56m) for Steel Joists 42 length , Hard Rocky ground - Erection of Steel Joists 42 length , Transporting of 42 twin RSJ pole from road side to pole pit , Fabrication of 42 Twin RSJ pole, Materials supplied by Board. , Excavation & Erection of Twin 422 fabricated RSJ pole , Concreting of 42 twin RSJ pole , Loadiing & Unloading of 42 Twin RSJ pole , Transporting of Pole from road side to pole pit - 7.5m, 8m RCC/PSC Pole , Transporting of Pole from road side to pole pit - 9m, 9.14m RCC/PSC Pole , Transporting of Pole from road side to pole pit - 36 RSJ Pole , Transporting of Pole from road side to pole pit - 42 RSJ Pole , Loadiing & Unloading of pole - 7.5m, 8m RCC/PSC Pole , Loadiing & Unloading of pole - 9m, 9.14m RCC/PSC Pole , Loadiing & Unloading of pole - RS Joists, Tubular & Rail Pole above 9.14m , Mass Concreting of Poles as per Board Standards(2 x 2 x 5 ) The material such as sand, jelly, etc have to be supplied by the contractor including cement(cement concrete mix 1:4:8 using40mm hard broken stone including cost of labour charges for placing, transport of sand, jelly, form box and water curing for 14 days etc complete)without coping. , Sleeve Concreting for poles on the line (All the materials including 20mm jelly, cement with 1:2:4 Ratio ( 0.5m x 0.45mx0.9m ) 0.202 cu.m , Coping of poles with form work (0.6mx0.6mx0.35m) including materials 20mm jelly and cement etc. Ratio 1:2:4 , Earthing of poles with GI Wires 4 or 6 SWG by coil earthing , Pipe earthing including excavation of earth pit and fixing earth pipe 3 m length , Normal ground-Excavation of stay pit (1.00m X 0.5m X 1.5m) , Normal ground - Erection of Stay set , Medium ground-Excavation of stay pit (1.00m X 0.5m X 1.5m) , Medium ground - Erection of Stay set , Hard Rocky ground - Excavation of stay pit (1.00m X 0.5m X 1.5m) , Hard Rocky ground - Erection of Stay set , Concreting of stay (0.3m x 0.3m x 1.5m) including materialsand cement. 1:4:8 Ratio/ 40mm Jelly , Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. , Fixing of Tapping Channel Cross Arm including transport of materialsfrom road side to site , Fixing of Guarding Cross Arm including transport of materialsfrom road side to site , Fixing of V Cross arm/Channel cross arm 3.5 including transport of materialsfrom road side to site , Fixing of V Cross arm/Channel cross arm 4.5 including transport of materialsfrom road side to site , Fixing of V Cross arm/Channel cross arm 5 including transport of materialsfrom road side to site , Fixing of LT 3 Phase cross arm including transport of materialsfrom road side to site , Fixing of LT Single Phase cross arm including transport of materialsfrom road side to site , Fixing of HT/LT TI Fitting including transport of materialsfrom road side to site , Erection of HT side arm with stud , Erection of LT side arm with stud , Fixing of HT Pin Insulators with pin for 11KV, 22KV & 33KV , Fixing of HT Strain Disc with metal parts for 11KV, 22KV & 33KV , Fixing of LT PIN Insulator/Shackles , Fixing of Aluminium knob , Fixing of HT LAS (3 Nos) , Fixing of LT LAS (3 Nos) , Removing Insulators , HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/2.59 ACSR / AAAC 7/2.50 (with LC @ 50%) , HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/2.59 ACSR / AAAC 7/2.50 (with out LC) , HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/3.35 ACSR / AAAC 7/3.15 (with LC @ 50%) , HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/3.35 ACSR / AAAC 7/3.15 (with out LC) , HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/4.09 ACSR (with LC @ 50%) , HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/4.09 ACSR (with out LC) , HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For Dog conductor (with LC @ 50%) , HT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For Dog conductor (with out LC) , LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/2.59 ACSR / AAAC 7/2.50 (with LC @ 30%) , LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/2.59 ACSR / AAAC 7/2.50 (with out LC) , LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/3.35 ACSR / AAAC 7/3.15 (with LC @ 30%) , LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/3.35 ACSR / AAAC 7/3.15 (without LC) , LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/4.09 ACSR (with LC @ 30%) , LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For 7/4.09 ACSR (with out LC) , LT Line stringing, sagging binding of conductor including transporting of materials from road side to site - For PVC cables , HT Line re-sagging - For 7/2.59 ACSR / AAAC 7/2.50 , HT Line re-sagging - For 7/3.35 ACSR / AAAC 7/3.15 , HT Line re-sagging - For 7/4.09 ACSR , HT Line re-sagging - For Dog conductor , LT Line re-sagging - For 7/2.59 ACSR / AAAC 7/2.50 , LT Line re-sagging - For 7/3.35 ACSR / AAAC 7/3.15 , LT Line re-sagging - For 7/4.09 ACSR , Loading of Conductor/Per Drum , Unloading of Conductor/Per Drum , For HT - Conversion of Pin point to cut point , For LT - Conversion of Pin point to cut point , For Flat Guarding (2 wires) (Split neutral guarding) , For Flat Guarding (4 wires) , For Cradle Guarding (6 Wires) (Fixing of X arm lacing) , For Fixing of earthing device with Stud , For Double Pole Transformer Structure: This work involves the erection and concreting of poles provision of three earth pits and stays, Lighting arrestors, AB Switch, HG. Fuse Seating channel etc., together with earthing as per TNEB Standards (ie. All the works except erection of Transformer feeder cables with 5 bags cement supplied by contractor) , For Tapping Structure: Erection of Tapping Structure as per Boards standard including stay erection, earthing work with AB Switch fixing work , Fixing of Double Pole AB Switch only , Erection of 11 KV Single pole Structure of DT complete with centre Support , Erection of Centre support with out concreting , Erection / Dismantling of Transformer - Upto 25 KVA Distribution Transformer , Erection / Dismantling of Transformer - Above 25 KVA to 100KVA , Erection / Dismantling of Transformer - Above 100 KVA to 250KVA , Erection / Dismantling of Transformer - 500KVA and above , Erection of Open type unit with feeder cableper feeder , Erection of Open Type unit - For each additional feeder , For DT structure Bus bar arrangement , Transporting of Distribution Transformer / Metering Set up to 15 Kms. , Loading / Unloading of Metering Set , Erection / Dismantling of Metering Set , Loading and Unloading ofDistribution Transformer - Upto 25 KVA Distribution Transformer , Loading and Unloading ofDistribution Transformer - Upto 25KVA to 100KVA , Loading and Unloading ofDistribution Transformer - Upto 100KVA to 250KVA , Loading and Unloading ofDistribution Transformer - Upto 500KVA and above , Plinth work for 500KVA DT , For Painting of transformer structure 2 coats including paint Cost , For Pole colour washing , For Painting of Transformer only , For Numbering of poles , For Numbering of poles with paint , For Metal Poles with HT Guarding cross arm , For Metal Poles with LT cross arms , Manufacturing of clamps - With 50 x 8 mm Flat , Manufacturing of clamps - With 65 x 10 mm Flat , Manufacturing of clamps - HT Tension Clamp , Alteration of Clamp , Welding of corroded Pole with 4 Pieces of steel angle/Channel including concreting of pole with coping (form work) with 1:2:4 Ratio ( 0.5m x 0.45mx0.9m ) 0.202cu.m (Steel piece alone will be supplied by the Board) , Welding Joint for the new RSJ Pole at Work shop per foot runof welding. , Drilling - Less than 25mm holes , Slotted holes , Cutting of Channel , Cutting of Flat , Cutting of Angle , Cutting of RSJ Pole , Cutting of Tubular pole , Cutting of Rail pole cutting , Service Connection Wires temporarily dismantling and re-erection: Single Phase Service connection , Service Connection Wires temporarily dismantling and re-erection: Three Phase Service Connection , Service Connection Wires temporarily dismantling and re-erection: Three Phase Service Connection above 50 HP , Grill seperation from deteriorated poles including transport to section (with concrete) , Grill seperation from deteriorated poles including transport to section (with out concrete) , Dismantling of 7.5m /8m pole with out damage , Dismantling of 9.14m pole/ RSJ with out damage , Dismantling of 7.5m /8m pole withdamage , Dismantling of 9.14m pole/ RSJ withdamage , Dismantling of stay set complete , Replacement of detoriated stay rod , Manufacturing of HG Fuse stool per set including materials , Tree Cutting - For ordinary Tree clearance , Tree Cutting - For Coconut trees , Tree Cutting - For Palmrah trees , Rectification of Leaning Pole - 7.5/8Mts. RCC, PSC Poles , Rectification of Leaning Pole - 9.14mts RCC/RSJ & Tubular pole , Transporting of Materials from Section office/ Store to road side of work spot by Cart , Fixing of Phase Seperator- Two Nos. per Span (4 Wire and 5 Wire) , Fixing of Phase Seperator- Two Nos. per Span (2 Wire ) , Renewal of deteriorated Earth Pipes , Loading / Unloading of line materials , Provision of Danger Boardincluding materials and painting as per Board Norms , Erection of concrete earth tub to DT Earth pipe , Dismantling of detoriated cables of various sizes (95, 120, 185 sq.mm) from DT LT bushing to LT open type clamp anderection of suitable lug at both ends , Distmantling and erection of LT Open Type fuse unit aluminium clamp , Fencing of DT Structure fabrication and erection with Standard specification (with 7 Nos. Cement Pillersof height 6 + wire mesh fenching 2 * 2 square sized andgate) , Provision of DT Name boardincluding Materials , Erection of new 10 earthpipe by replacing the corroded earth pipe and renewal of earthing including burying, looping and binding , Dismantling of stay set complete including stay rod , Dismantling of stay set complete with out stay rod , Dismantling of HT OR LT Conductor (7/2.59 ACSR / AAAC 7/2.50) including transporting the conductors to the nearest road side and stocking in coils. , Dismantling of HT OR LT Conductor (7/3.35 ACSR / AAAC 7/3.15) including transporting the conductors to the nearest road side and stocking in coils. , Dismantling of HT OR LT Conductor (7/4.09 ACSR) including transporting the conductors to the nearest road side and stocking in coils. , Dismantling of HT Conductor (Dog conductor) including transporting the conductors to the nearest road side and stocking in coils. , Dismantling and Re-erection of Conductors - For HT OR LT - (7/2.59 ACSR / AAAC 7/2.50) , Dismantling and Re-erection of Conductors - For HT OR LT - (7/3.35 ACSR / AAAC 7/3.15) , Dismantling and Re-erection of Conductors - For HT OR LT - (7/4.09 ACSR) , Dismantling and Re-erection of Conductors - For HT - (Dog conductor) , Dismantling of Transformer Structure materials complete set and transporting the same from the location to the road side , Dismantling of Tapping Channel Cross Arm including transport of materialsfrom road side to site , Dismantling of Guarding Cross Arm including transport of materialsfrom road side to site , Dismantling of V Cross arm/Channel cross arm 3.5 including transport of materialsfrom road side to site , Dismantling of V Cross arm/Channel cross arm 4.5 including transport of materialsfrom road side to site , Dismantling of V Cross arm/Channel cross arm 5 including transport of materialsfrom road side to site , Dismantling of LT 3 Phase cross arm including transport of materialsfrom road side to site , Dismantling of LT Single Phase cross arm including transport of materialsfrom road side to site , Dismantling of HT/LT TI Fitting including transport of materialsfrom road side to site , Dismantling of HT side arm with stud , Dismantling of LT side arm with stud , Dismantling of HT Pin Insulators with pin for 11KV, 22KV & 33KV , Dismantling of HT Strain Disc with metal parts for 11KV, 22KV & 33KV , Dismantling of LT PIN Insulator/Shackles , Dismantling of Aluminium knob , Dismantling of HT LAS (3 Nos) , Dismantling of LT LAS (3 Nos) , Hiring of JCB per 1 Hour , Hiring of JCB for exceeding 1 hour for every hour , Hiring of Crane per Hour , Hiring of Crane for exceeding 1 hour for every hour , G.S.T. @18% should be Entered by the Bidder

Key Value

Document Fees
Refer document
EMD
INR 10000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail