| 1 | Construction of new sewer line behind Meghanad Saha Hostel (HB-9) at VNIT, Nagpur (2nd Call). |
| 2 | Cleaning of site including cutting of bushes, small trees, grass, etc, removing ofroots from the soil,dismantling of existing structure if any in jungle area for laying of new sewer line,& removing the scrap material around the site including transportation of scrap/ Furniture / soils /debris from site to any other place on the VNIT campus as directed etc. complete Spec. No. As directed by Engineer-in-charge. |
| 3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means. Bd.A.1 Page One Number 259 |
| 4 | Excavationforfoundationinearth,soilsofalltypes,sand,gravelandsoftmurum,including removing the excavatedmaterial upto a distance of 50 metres beyondthe building areaandstackingand spreadingas directed,dewatering,preparingthebedforthefoundationand necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means. Bd.A.1 Page One Number 259 |
| 5 | Providing and laying concrete pipes of I.S.NP. class of 300mm diameter in proper line, level and slope including necessary collars, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete. Bd.V.41, Page One Number 573 |
| 6 | ProvidingandlayingconcretepipesofI.S.NP.classof225mmdiameterinproperline,levelandslope includingnecessarycollars, laying,fixingwithcollarsincementmortar1:1andrefillingthe trench complete. Bd.V.41, Page One Number 573 |
| 7 | Dismantlingbrick masonry in limeor cement mortar and stackingthematerils as directedwithall leads, lifts etc. As directed by Engineer-in-charge. |
| 8 | Providing and laying Cast in situ/Ready Mix cement concrete M-15 of trap/ granite/quartzite/gneiss metal for coping to plinth or parapet, moulded or chamfered, bed blocks, foundation blocks and such other iterms as per drawing or as directed including steel centering, plywood/ steel formwork compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.) With fine aggregate (Crushed sand VSI Grade) Bd.E. 3/Page One Number 288/I.S. 456 (2000) |
| 9 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. Bd.F.17, Page One Number 306 |
| 10 | Providing fly ash brick masonry with conventional / I.S. type fly ash bricks in C.M. 1:6 in foundation and plinth including bailing out water manually striking joints, racking out joints watering and scaffolding etc. complete. As directed by engineer in charge and BDG 2 and 5 |
| 11 | Providing internal cement plaster 12mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete.Bd.L.2 Page One Number 368 |