| 1 | Providing New Service connections (Over Head line): Fixing Suitable cutout fuse, Fixing Energy Meter, Providing service line, providing line connections, etc. Over head Service lines should be clipped to the stay wire using proper cable tie. Service wire with stay wire tied at proper height and tight. (The distance between post and consumer meter point is up to 30 Mtrs length/ Above 30 Mtrs length). |
| 2 | Single Phase Connection (Up to 30 Mtrs distance) |
| 3 | Three Phase Connection (Up to 30 Mtrs distance) |
| 4 | Single Phase Connection (Above 30 Mtrs distance) |
| 5 | Three Phase Connection (Above 30 Mtrs distance) |
| 6 | Providing New Service connections (UG Cable ): Fixingand clipping the UG cable to the wall with proper cable clip/tie , Fixing Energy Meter etc. |
| 7 | Single Phase Connection |
| 8 | Three Phase Connection |
| 9 | UG Cable Joining LT 440V lines: Cutting cables, Removing insulations, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour. |
| 10 | LT Cables 3 Phase (95, 120 & 160 Sq mm) |
| 11 | LT Cables3 Phase ( 50 & 70 Sqmm) |
| 12 | LT Cable 3 Phase( 10,16,25 & 35 Sqmm) |
| 13 | LT Single phase Cables of all size |
| 14 | LT End Termination works through break out |
| 15 | Maintenances of Electrical Service connections- |
| 16 | Refurbishment of service connections on the Post/Boxes/Consumer end, etc |
| 17 | Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post within 30 Mtrs length) |
| 18 | Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post above 30 Mtrs length) |
| 19 | Replacing cut out fuse units of all type with new one |
| 20 | Replacing defective Single phase Energy Meter with new one |
| 21 | Replacing defective Three phase Energy Meter with new one |
| 22 | Sealing of Single Phase/ Three phase Energy Meter with proper Polycarbon / suitable seal |
| 23 | Maintenances of Distribution Line |
| 24 | Maintenance / Replacing of Porceline / HRC fuse unit (including base) necessary cutting,drilling,tightening with Bolt and nuts,socket and Cable tying (63 A to 400A) |
| 25 | Renovation of Connection terminals / Maintenance of Street light cables |
| 26 | Installation / Replacement of Street light sets including transportation, connection, etc |
| 27 | Maintenance / Repair / Replacement of street light relay including connections |
| 28 | Shifting of OH line to UG cable Single phase with proper clipping and all connections |
| 29 | Shifting of OH line to UG cable Three phase with proper clipping and all connections |
| 30 | Providing and fixing of new pole mount box including all connections |
| 31 | Replacement of existing pole mount box with new one including all connections |