| 1 | REPAIR WORK OFHANDIYA BRANCH CANAL AT RD 24240 M. IN DISTT. HARDA |
| 2 | Excavation in all kind of soft /loose /hard/dense soils, moorum & moorum mixed with boulders and mud including dressing, placing the excavated soil neatly in specified dump area or disposing off the same as directed, including cost of site clearance, all materials, machinery, labour and dressing etc. Complete. as per Specifications design, drawing and as directed by engineer in charge . |
| 3 | Excavation in different types of soil in canal bed and sides slopes for lining, sleepers, steps, coping and under drainage arrangement including dressing to the profile and disposal of excavated materials etc., complete. In all kind of soft / loose / hard /dense soils, moorum & moorum mixed with boulders and mud.as per Specifications design, drawing and as directed by engineer in charge . |
| 4 | Compaction of earthworkCompaction of earthwork at optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/vibratory compactors etc. (excluding watering).as per Specifications design, drawing and as directed by engineer in charge . |
| 5 | Watering earthwork for compaction at optimum moisture content. as per Specifications design, drawing and as directed by engineer in charge . |
| 6 | Providing and placing approved cohesive nonswelling soils, below lining in canal bed and side slopes including serration in soil, breaking of clods, laying in layers of 15 cm thickness, cutting and finishing in required bed grade & side slopes including dressing, watering, compaction (at optimum moisture content to obtain dry density not below 90%) etc., complete. as per Specifications design, drawing and as directed by engineer in charge . |
| 7 | Providing and fixing in position LDPE film of 150 micron (0.15 mm) IS mark of Grade 231 for bed and sides of canal including cost of all materials, labour, laying, joining as per specifications etc., complete. as per Specifications design, drawing and as directed by engineer in charge . |
| 8 | Providing and placing in position cement concrete with graded aggregate in canals, including cost of all material, vibration, finishing, curing for 28 days, cleaning etc., complete.as per Specifications design, drawing and as directed by engineer in charge . M 15, 20 mm graded aggregate |
| 9 | Removing and hauling all kinds of soil/ soft rock including boulders up to 0.6 m. diameter slipped due to natural / geological causes and disposing off the same in specified dump area or as directed, including cost of all materials, machinery, labour, forming steps / ramp ways and all other ancillary operation etc., complete.as per Specifications design, drawing and as directed by engineer in charge . |
| 10 | Construction of Dowels (Dowla)Construction of Dowels, 30 cm wide on top and 30 cm in height (1.5:1 side slopes) on the canal banks including excavation, dressing etc., complete.as per Specifications design, drawing and as directed by engineer in charge . |
| 11 | Dismantling lime concrete or cement concrete in foundations or under floors,haunches or arches or terrace and also dismantling brick masonry including arches in lime or cement mortar. as per Specifications design, drawing and as directed by engineer in charge . |