| 1 | Reconductoring LT line |
| 2 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 poles excluding loading & unloading |
| 3 | Insertion of one LT PSC pole in existing 3ph OH line incl. digging &back filling pit, fitting cross arm, insulator, binding etc. |
| 4 | Fitting one No. Section fuse on LT line with dropping cables, crimpingsockets, connecting with bolt&nut etc |
| 5 | Dismantling and reconnecting Sph service connection from the OH lineincl. lowering down the WP portion. |
| 6 | Dismantling and reconnecting 3ph service connection from the OH lineincl. lowering down the WP portion. |
| 7 | Straightening one Slanted LT pole after unbinding the line and rebindingthe line after work. |
| 8 | Straightening one Slanted LT Cut pole after unbinding the line andrebinding the line after work. |
| 9 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm,digging & back filling pit, drawing earth leads. |
| 10 | Loading HT PSC pole from the stacking place and unloading the same atwork site (transport by vehicle). |
| 11 | Loading HT A type pole from the stacking place and unloading the sameat work site (transport by vehicle). |
| 12 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 13 | Providing Fly stay for LT pole using LT PSC pole incl. digging & backfilling pit. |
| 14 | Dismantling (without damage) one LT PSC/RCC pole after disconnectingstays, strut etc. and stacking the same. |
| 15 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 16 | Additional rate for excavation of one Pit for HT Pole/HT Stay in HardLaterite. |
| 17 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 18 | Additional rate for excavation of one Pit for LT Pole/LT Stay in HardLaterite. |
| 19 | Insertion of one LT PSC pole in existing Sph OH line incl. digging &back filling pit, fitting cross arm, insulator, binding etc. |
| 20 | Loading LT PSC pole from the stacking place and unloading the same atwork site (transport by vehicle). |
| 21 | Providing Stay for LT poles incl. digging & back filling pit.. |
| 22 | Dismantling (without damage) one km LT Sph 2 wire OH line, crossarms, insulators and stacking the conductors in rolls.. |
| 23 | Dismantling (without damage) one km LT 3ph 4 wire OH line, crossarms, insulators and stacking the conductors in rolls.. |
| 24 | Dismantling (without damage) one km LT additional conductor line,cross arms, insulators and stacking the conductors in rolls. |
| 25 | Providing WP support with PSC pole incl. digging & back filling pit. |
| 26 | Renewal of existing damaged/old LT PSC/RCC (Sph line) pole with newPSC pole in place and refitting of all items incl. conveyance (except pole). |
| 27 | Renewal of existing damaged/old LT PSC/RCC (3ph line) pole with newPSC pole in place and refitting of all items incl. conveyance (except pole). |
| 28 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 29 | Renewal of existing damaged/old LT stay with new stay in place andrefitting of all items and conveyance of all materials. |
| 30 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap : 4-35 sqmm |
| 31 | Installation of Insulation piercing connector for main to service line main:50-150 sqmm, Tap : 4-35 sqmm |
| 32 | Providing one Coil Earth using GI earth wire, digging separate pit atstandard distance away from the pole/structure & backfilling. |
| 33 | Installing One No. 4 way Satellite Connector of size Main :16 to 95,Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 34 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm,digging & back filling pit, drawing earth leads. |
| 35 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of allmaterial (as per specification). |
| 36 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messenger through existing poles |
| 37 | Installation of Insulation piercing connector for main to service line main:25-95 sqmm, Tap : 25-95 sqmm |
| 38 | Installing One No. Insulation piercing connector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 39 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 40 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 41 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 42 | Singe Phase Satellite connectors upto 4 service main connections (25-95ABC/2.5-25 sqmm SM wire-2No) |
| 43 | Transporting LT ABC by hired vehicle to a distance up to 5 km andcarring up to 2 drum including loading and un loading using crane |