}

Estimate Of Swasan At Kamardaha Shashan Chulli Under Orphuli Gp Within Bagnan-Ii Panchyat Samity, bagnan-West Bengal

Zilla Parishad has published Estimate Of Swasan At Kamardaha Shashan Chulli Under Orphuli Gp Within Bagnan-Ii Panchyat Samity. Submission Date for this Tender is 22-07-2025. Cremetorium Tenders in bagnan West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

50162500
Estimate Of Swasan At Kamardaha Shashan Chulli Under Orphuli Gp Within Bagnan-Ii Panchyat Samity
Tender
Indian
West Bengal
Bagnan
22-07-2025

Tender Documents

Tender Details

Estimate of Swasan at Kamardaha Shashan Chulli under Orphuli GP within Bagnan-II Panchyat Samity -1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary P:01; It:02 (a) Depth of excavation not exceeding 1,500 mm. Total = 2 Filling in foundation or plinth by filling sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished qua Total = 3 Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. Total = 4 Cement concrete with graded jhama khoa(30 mm.size) excluding shuttering. In ground floor and foundation. (a) 6:3:1 proportion. P:23; It:1 For Foundation bottom Total = 5 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) P:01; It:03 (a) With earth obtained from excavation of foundation. 1/5th of excaveted earth 6 Brick work with 1st class bricks in cement mortar (4:1) (a) In Foundation & Plinth, ground floor Total = 7 125 mm thick brick work with (1:4) sand cement morter incl.scafolding, curing etc all complete with 1st class brick Total = 8 Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs beams columns lintels curved or straight including fi P:42; It:36 A) 25 mm to 30 mm thick wooden shuttering Total = Total = 9 Ordinary Cement Concrete M20 (mix 1:1.5:3) with graded stone chips (20 mm.down) excluding shuttering and reinforcement, if any, in ground floor. as per IS 456- 2000 a) Pakur / Chandil Variety Total = Total = 10 Reinforcement(for reinforced cement concrete work) in all sorts of structures incl. distribution bars, stirrups, binders etc of rods incl. supply initial straightening and removal of loose rust (if necessary) cutting to requisite length, hook and bendin P:40; It:44 @ 1.1 % of total R.C.C. 1 22.045 0.011 7.85 11 M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets as per design, direction of Engineer-in- II) For srtuctural member of specified section weighing not less than 22.50 KG./m Total = 12 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course where necessary (ground floor) a) 20mm thick Inside wall Plaster (4:1) Total= Total= 13 Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. Total= 14 Artificial stone in floor, dado, staircase etc. with cement concrete (4:2:1) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (2:1) including smooth finishing and rou P:48; It: 06(ii) ii) 25 mm thick Mancha 1 5.00 5.00 15 Applying Exterior grade Acrylic primer ofapproved quality and brand on plastered or cencrete surface old or new surface toreceive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturers specification and as per direction of the EIC.approved quality and brand on plastered or cencrete surface old or new surface toreceive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturers specification and as per direction of the EIC. P:196; It: 08 Gr floor Total = 1st Floor Total= 16 Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturers specification. (iii) Two coats. P:197; It: 15 Gr floor Total = 1st Floor Total= 17 Supply,fitting and fixing of Name Palate … etc

Key Value

Document Fees
Refer document
EMD
INR 10462.0 /-
Tender Value
INR 5.23 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents-1 0 KB
Click here to download tender document Tender Documents-1 0 KB
Click here to download tender document Tender Documents-1 0 KB
Click here to download tender document Tender Documents-1 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail