Tender For Repairing Of Boundary Wall In Five Place Near Flight Lab.; 1 EARTH WORK 2 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 3 All kinds of soil. 4 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. 5 Clearing jungleincludinguprootingof rank vegetation,grass,brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. 6 CEMENT CONCRETE (CAST IN SITU) 7 Providingandlayinginpositioncementconcreteof specified grade excluding the cost of centering and shuttering - All work up to plinth level : 8 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from naturalsources :10gradedstoneaggregate40mm nominal size derived from natural sources) 9 REINFORCED CEMENT CONCRETE 10 Providing and laying in position specified grade of reinforced cement concrete,excludingthecostofcentering,shuttering,finishingand reinforcement - All work up to plinth level : 11 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) 12 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). 13 Centering and shuttering including strutting, propping etc. and removal of form for 14 Foundations,footings,basesof columns,etc.formass concrete 15 Lintels,beams,plinthbeams,girders,bressumersand cantilevers 16 Columns, Pillars, Piers, Abutments, Posts and Struts 17 Steelreinforcement forR.C.C.workincludingstraightening,cutting, bending, placing in position and binding all complete upto plinth level. 18 Thermo-Mechanically Treatedbars of gradeFe-500D or more. 19 Steelreinforcement forR.C.C.workincludingstraightening,cutting, bending, placing in position and binding all complete above plinth level. 20 Thermo-Mechanically Treatedbars of gradeFe-500D or more. 21 MASONRY WORK 22 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. 23 Cement mortar 1:4(1 cement :4 coarse sand) 24 Half Brick masonry with Old Available bricks of class designation 7.5 in superstructure above plinth level up to floor V level in cement mortor 1:4 25 FINISHING 26 12 mm cement plaster of mix: 27 1:6 (1 cement: 6 coarse sand) 28 15 mm cement plaster on rough side of single or half brick wall of mix: 29 1:6(1 cement: 6 coarse sand) 30 6 mm cement plaster of mix: 31 1:3(1 cement :3 fine sand) 32 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 33 New work (Two or more coats applied @ 1.43 Itr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) 34 Dismantling and Demolishing 35 Demolishingbrickworkmanually/bymechanicalmeansincluding stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 36 In cement mortar 37 Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): 38 From brick work in cement mortar 39 Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.