Tender For Regular Maintenance Work And Other Appurtenant Work At Ghat Sewer, Varanasi - Cleaning and Desilting of blocked Sewer line son regular basis of all ghat sewer with connecting branch sewer coming from home,hotel and temple etc along Varanasi Ghats and incoming sewer of SPS sump( All SPS of Rajghat to Jalasen Ghat) including removal of debris/silt, rubbish,etc. manually and safe disposal of the same within Municipal limits. Supply of all material. Labour tool and plants, gas detector, forced air ventilator Barricading , Sign board, Caution tape etc.&Provision of safety equipmentasperguidelineslaidinIS11972 (1987)for proper and safe completion of work directed by Engineer in charge.Rajghat To Jalasen Ghat (In 3 shift ) 2 Cleaning and Desilting of blocked Sewerline son regular basis of all ghat sewer with connecting branch sewer coming from home,hotel and temple etcalong VaranasiGhatsand incoming sewer of SPS sump( All SPS of Jalasen Ghat to Harishchandra Ghat) includingremovalofdebris/silt, rubbish,etc.manuallyandsafedisposalofthe same within Municipal limits. Supply of all material. Labour tool and plants, gas detector, forcedairventilator ,Barricading , Sign board, Caution tape etc.&Provisionofsafety equipmentasperguidelineslaidinIS11972 (1987)forproperandsafecompletionofwork directed by Engineer in charge.Jalasen Ghat to Chauki Ghat & Harishchandra Ghat(In 3 shift ) 3 Supervisor for Supervision of Ghat Sewer and SPS asper direction of engineer in-charge in Day shift 4 Supervisor for Supervision of Ghat Sewer and SPS asper direction of engineer in-charge in Nightshift 5 Hiring Charge of boat for Inspection and supervision of Ghat sewerby Engineer in-charge andAdministration during visit and cartage of material after permission of Engineer In-charge 6 Deduction as penalty after coming negative newsfrom administration, social media and print media after overflow of Ghat sewerand Baba MahashamshanNath Temple and all work related Ghat sewer directed by Engineer in Chargewhose not attend in timely. 7 Dewatering in Baba MahashamshanNath Temple asper direction of Engineerin charge 8 Cleaning of silt/sludge, deposite in the sewer line of followingGhat SPS after Floodwiththehelpofropeandbucket by manuallabourdisposaloftakenout silt/sludge and other garbage at suitable dumpingplacefromtheGhatarea.This work also includes all safety equipment such as Super sucker, Jetting, Gas mask, Air blower, helmet, safety belt, hand gloves and gumbootstopreventanycasualtyduring workingdirectionofEngineerincharge, includingsupplyofalllabourT&Petc. complete 9 R P Ghat 10 Diameter of sewer- 150mm to 300mm 11 Length-1360m 12 Jalasen Ghat 13 Diameter of sewer- 150mm to 300mm 14 Length-650m 15 Trilochan Ghat 16 Diameter of sewer- 150mm to 400mm 17 Length-(4825m + 72m) drain 18 Dismantling of existing plaster. 19 Scraping old white or colour washing. 20 Dismantlingbrickworkorstoneworkinlimeor cementmortarinclucingdisposalalldismantled materials with in distance of 50m. 21 Steel barricading of manhole,Dismantling of surface,Earthworkincuttingorembankmentin ordinary soil excavation to be in the form of regular pits not exceeding 1.0m in depth and earth work in embankment to be 20 cm layers including ramminganddressingincluding1.5mlift includingall labour T&P etc. completeas per directionofE/I(Sl.No.253),Surplusdressing& cleaning, labour for material shifting & disposal of surplus earth, Brick work masonary for raised manhole, both side plaster for raised manhole (outer/inner), M 20 grade concrete to damage portion & providing & fixing of foot rest. 22 0.00-0.30 m 23 0.30-0.60 m 24 Construction of manhole excavation all PCC work (M20)includingfoundationbenching,coping,1st class brick work (1:4,cement coarse sand) supply andfixingfootstep,neatcementfinishingSFRC frame & cover heavy duty, including supply of all materials, labour, T&P etc. 25 A-Type for 1.2m to 1.65m 26 B-Type for 1.66m to 2.3m 27 Providing andapplyingplasterofparisputtyof 2 mm thickness over plastered surface to prepare the surface even and smooth complete 28 Applyingoneprimingcoatandonecoatofdry distemper after first coat 29 Paintingorvarnishingonnewironworkinsmall areas or new wood work withone coatpriming & one coat paint or varnish 30 1st class brick work in 1:4 cement and coarse sand mortarincludingsupplyofallmaterials,labour, T&P etc. required for proper completion of work 31 12mm thick plaster cement and coarse sand (1:4) mortar including all material labour T&P etc. complete 32 Construction of manhole excavation all PCC work (M20)includingfoundationbenching,coping,1st class brick work (1:4,cement coarse sand) supply andfixingfootstep,neatcementfinishingSFRC frame & cover heavy duty, including supply of all materials, labour, T&P etc. 33 110 mm dia PVC pipe 6 kg/cm2 34 160 mm dia PVC pipe 10 kg/cm2 35 160 mm HDPE pipe PE 100 PN- 10 36 Supply&fixingofaluminiumdooroftoliet& bothroom (staff Quarter) 37 Glass work for windows 38 Supply&fixingofwaterproofplydoor(Staf Quarter) 39 Supply and fixing of SFRC heavy duty, 560mm dia manhole cover & frame a per direction of Engineer-in-charge 40 Cement concrete with 20mm gauge approved stone ballast, coarse sand and cement in the proporation of1:2:4includingsupplyofallmaterials,labour, T&Petc.requiredforpropercompletionofthe work. 41 25mm thick 1:2:4 P.C.C. floor with cement, coarse sand nd 20mm gauge stone ballast with base concrete (75 mm thick) 1:4:8 cement, local sand & brick ballast 40mm gauge. 42 Layingof80mmthickCCprerubbermoulded interlocking paver tiles including 30mm thick fine sandbedover(280mmthickcompactedbaseof twolayarofGSB&WMM,paidseperatelyand alsoincludingearthworkinexcavationinproper slope&camberincludingalllabour,T&Petc. required for proper competion of work. 43 Reinstatement of Interlocking tiles 44 Providing and laying stone pattia on ghat with 1:2 cementlocalsandmortar,struckpointing including all cost of labour and materialT&P etc. required for proper completion of work 45 R.C.C work with cement,coarse sand and 20 mm gauge approved stone ballast in proportion of 1:1.5:3 in slabs excluding supply of reinforcement and its bending but including its fixing and binding thesamewith0.50mmthickbindingwire(tobe supplied bythecontractor) includingnecessary centeringandshuttering,supplyofallmaterials, labour, T&P etc. required for proper completion of the work. 46 Overheadcartageofmaterialsatghatfor100m manualy by labour 47 Installation of Pump assembly with necessary column pipe , NRV, valve and all necessary material, fitting, rubber gasket,nut bolts into the sump and in true alignment of SPSand automation panel including all labour ,material etc complete for proper working of pumps 48 Dismantling of Pump assembly with necessary column pipe , NRV, valve and all necessary material, fitting, rubber gasket,nut bolts into the sump and in true alignment of SPSand automation panel including all labour ,material etc complete for proper working of pumps 49 Cleaning of sumps and transporting debris by head load to a lead upto topfrom site 50 Hiring of 30 Hp/45 m Head pump set for sewage pumping station on ghat with all assembly,column pipe, NRV, Valve necessary arrangement needed proper pumping from Sump of SPS to already insatlled dilvery pipe including all material,fitting etc complete for a period of 2month 51 Hiring of automation panel/startar panel for sewage pumping station on ghat with allnecessary electric instrument,fitting required for proper pumping from Sump of SPS to already insatlled delivery pipe including all material, fitting etc complete 52 Fitter ( 1No In 3shift for 60 Days) 53 Electrician (1 No In 3Shift60 Days) 54 sweeper (2 No in 3Shift 60 Days)