| 1 | Electrical Items : |
| 2 | Earth Wire Clamp with Nut and Bolts for ST Pole SP-55 |
| 3 | Earth Wire Clamp with Nut and Bolts for ST Pole SP-33 |
| 4 | Earth Wire Clamp with Nut and Bolts for ST Pole SP-23 |
| 5 | Earth Wire Clamp with Nut and Bolts for ST Pole SP-21 |
| 6 | Earth Wire Clamp with Nut and Bolts for SP-10 |
| 7 | PP Clamp with Nut and Bolts for ST Pole SP-55 |
| 8 | PP Clamp with Nut and Bolts for ST Pole SP-33 |
| 9 | PP Clamp with Nut and Bolts for ST Pole SP-23 |
| 10 | X-Arm Clamp with Nut and Bolts for ST Pole SP-55 |
| 11 | X-Arm Clamp with Nut and Bolts for ST Pole SP-33 |
| 12 | X-Arm Clamp with Nut and Bolts for ST Pole SP-23 |
| 13 | Bracing Set for ST Pole SP-23 |
| 14 | Bracing Holding Clamp with Nut and Bolts for ST Pole SP-55 Top Side. |
| 15 | Bracing Holding Clamp with Nut and Bolts for ST Pole SP-55 Bottom Side. |
| 16 | Bracing Clamp Top Side with Nut and Bolts for ST Pole SP-33 |
| 17 | Bracing Clamp Bottom Side with Nut and Bolts for ST Pole SP-33 |
| 18 | Bracing Clamp Top Side with Nut and Bolts for ST Pole SP-23 |
| 19 | Bracing Clamp Bottom Side with Nut and Bolts for ST Pole SP-23 |
| 20 | Stay Clamp with Nut and Bolts for ST Pole SP-55 |
| 21 | Stay Clamp with Nut and Bolts for ST Pole SP-33 |
| 22 | Stay Clamp with Nut and Bolts for ST Pole SP-23 |
| 23 | Stay Clamp with Nut and Bolts for ST Pole SP-21 |
| 24 | Stay Clamp with Nut and Bolts for ST Pole SP-10 |
| 25 | LT Clamp with Nut and Bolts for ST Pole SP-55 |
| 26 | LT Clamp with Nut and Bolts for ST Pole SP-33 |
| 27 | LT Clamp with Nut and Bolts for ST Pole SP-23 |
| 28 | LT Clamp with Nut and Bolts for ST Pole SP-21 |
| 29 | LT Clamp with Nut and Bolts for ST Pole SP-10 |
| 30 | Shackle Insulator with Nut & Bolt 100X115mm |
| 31 | Shackle Insulator with Nut & Bolt 75X90mm |
| 32 | Stay Insulator |
| 33 | PG Clamp with Nut and Bolts (Weasel to Weasel) |
| 34 | PG Clamp with Nut and Bolts (Rabbit to Rabbit) |
| 35 | PG Clamp with Nut and Bolts (Dog to Dog) |
| 36 | LT Suspension Clamp with I-Hook for AB Cable |
| 37 | LT Dead End Clamp with I-Hook for AB Cable |
| 38 | LT Insulated Piercing Connector different size |
| 39 | LT Single Phase Distribution Box with Clamp and Nut & Bolt |
| 40 | LT Three Phase Distribution Box with Clamp and Nut & Bolt |
| 41 | Aluminium Crimping Lugs Different Size |
| 42 | Holding Clamp for Distribution Box |
| 43 | Nut &Bolts all size |
| 44 | 11KV Heat Shrinkable Cable Jointing Kit 3x70SQmm (I/D) |
| 45 | 11KV Heat Shrinkable Cable Jointing Kit 3x70SQmm (O/D) |
| 46 | 11KV Heat Shrinkable Cable Jointing Kit 3x120SQmm (I/D) |
| 47 | 11KV Heat Shrinkable Cable Jointing Kit 3x120SQmm (O/D) |
| 48 | GI Pipe Dia 150 mm |
| 49 | SERVICES (LABOUR) |
| 50 | Cartage of ST Pole SP-10 from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 0-20 Km) |
| 51 | Cartage of ST Pole SP-10 from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km) |
| 52 | Cartage of ST Pole SP-21/23 from store centre to construction site with loading, unloading at both points and proper stacking. (Distance 0-20 Km) |
| 53 | Cartage of ST Pole SP-21/23 from store centre to construction site with loading, unloading at both points and proper stacking. (Distance 21-50 Km) |
| 54 | Cartage of ST Pole SP-33 from store centre to construction site with loading, unloading at both points and proper stacking. (Distance 0-20 Km) |
| 55 | Cartage of ST Pole SP-33 from store centre to construction site with loading, unloading at both points and proper stacking. (Distance 21-50 Km) |
| 56 | Cartage of ST Pole SP-55 from store centre to construction site with loading, unloading at both points and proper stacking.(Di stance 0-20 Km) |
| 57 | Cartage of ST Pole SP-55 from store centre to construction site with loading, unloading at both points and proper stacking.(Di stance 21-50 Km) |
| 58 | Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and u nloading at both ends(distance 0-20 Km) |
| 59 | Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and u nloading at both ends(distance 21-50 Km) |
| 60 | Cartage of the 16/25 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 0-20 Km) |
| 61 | Cartage of the 16/25 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km) |
| 62 | Cartage of the 63 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 0-20 Km) |
| 63 | Cartage of the 63 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km) |
| 64 | Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 0-20Km) |
| 65 | Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50Km) |
| 66 | Cartage of the 250 KVA transformer from store center to construction site with loading and unloading at both points. (Distance 0-20 Km) |
| 67 | Cartage of the 250 KVA transformer from store center to construction site with loading and unloading at both points. (Distance 21-50 Km) |
| 68 | Carrage of 11 KV PRMC |
| 69 | Head load cartage of SP-10 Pole from road to site(distance 0-1 Km) |
| 70 | Head load cartage of SP-21/23 Pole from road to site(distance 0-1 Km) |
| 71 | Head load cartage of SP-33 Pole from road to site(distance 0-1 Km) |
| 72 | Head load cartage of SP-55 Pole from road to site(distance 0-1 Km) |
| 73 | Head load cartage of small material(distance 0-1 Km) |
| 74 | Head load cartage of 25 KVA transformer from road to site(distance 0-1 Km) |
| 75 | Head load cartage of 63 KVA transformer from road to site(distance 0-1 Km) |
| 76 | Head load cartage of 100 KVA transformer from road to site (distance 0-1 Km) |
| 77 | Head load cartage of 250 KVA transformer from road to site (distance 0-1 Km) |
| 78 | Head load cartage of SP-10 Pole from road to site(distance 1-3 Km) |
| 79 | Head load cartage of SP-21/23 Pole from road to site(distance 1-3 Km) |
| 80 | Head load cartage of SP-33 Pole from road to site(distance 1-3 Km) |
| 81 | Head load cartage of SP-55 Pole from road to site(distance 1-3 Km) |
| 82 | Head load cartage of small material(distance 1-3 Km) |
| 83 | Head load cartage of 25 KVA transformer from road to site(distance 1-3 Km) |
| 84 | Head load cartage of 63 KVA transformer from road to site(distance 1-3 Km) |
| 85 | Manual shifting of 11 KV PRMC |
| 86 | Fabrication of M.S channel/angle iron after cutting in required sizes with drilling of whole upto good finish as per UPCL Norms. |
| 87 | OPENING <(>&<)> MAKING OF JUMPHER OF SECTION POLE |
| 88 | Excavation of earth for pole of pit of size 0.9x0.6x1/6 Mtr of full lenghth of pole for erection of pole in all type of soil including proper dressing of sides and ramming of botom including getting out the excavated soil and disposoal of surplus excavated soil as directed complete work. |
| 89 | Erection of Single Pole SP-10 in proper level and alignmen along with fixing of all accessories like top channel and clamps as per RESSPO. |
| 90 | Erection of Single Pole SP-21 in proper level and alignmen along with fixing of all accessories like top channel and clamps as per RESSPO. |
| 91 | Erection of Single Pole SP-23 in proper level and alignmen along with fixing of all accessories like top channel and clamps as per RESSPO. |
| 92 | Erection of Single Pole SP-33 in proper level and alignmen along with fixing of all accessories like top channel and clamps as per RESSPO. |
| 93 | Erection of Single Pole SP-55 in proper level and alignmen along with fixing of all accessories like top channel and clamps as per RESSPO. |
| 94 | Erection of SP-23 double support pole in proper level and alignment along with fixing of all accessories like top channel,X bracings ,& clamps as per RESPO manual |
| 95 | Erection of SP-33 double support pole in proper level and alignment along with fixing of all accessories like top channel,X bracings, & clamps as per RESPO manual |
| 96 | Erection of SP-55 double support pole in proper level and alignment along with fixing of all accessories like top channel,X bracings ,& clamps as per RESPO manual |
| 97 | Erection of SP-23 four pole support pole in proper level and alignment along with fixing of all accessories like top channel,X bracings,& clamps as per RESPO manual |
| 98 | Erection of SP-33(11KV/33 KV)four pole support pole in proper level and alignment along with fixing of all accessories like top chan nel,X bracings,& clamps as per RESPO manual |
| 99 | Erection of SP-55(11KV/33 KV)four pole support pole in proper level and alignment along with fixing of all accessories like top chan nel,X bracings,& clamps as per RESPO manual |
| 100 | Grouting of pole in size 0.45x4.45x1/9 of the support in CC ration 1:4:8(1 cement:4 graded stone20 mm niminal size: 8 coarse sand) b lock including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, lev elling as per RESPO cnstruction manual |
| 101 | Muffing of poles size 0.45x0.60 cm radius with 1:3:6 (1 cement:3 coarse sand:graded stone 10 mm nominal size) block size 45 cm heigh t from ground level including cost of cement,stone and sand etc. |
| 102 | Excavation of earth for staypit of size 0.6x0.6x1.2Mtr in all type of soil including proper dressing of sides and ramming of botom including getting out the excavated soil and disposoal of surplus excavated soil as directed complete work. |
| 103 | Fixing, Tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in LT line. |
| 104 | Fixing Tightning and nozzaling of stay with pole and stay rod on required tesion for 11KV line. |
| 105 | Grouting of stayin size 0.6x0.6x0.3Mtr in CC ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment & leveling as per RESSPO. |
| 106 | T-off Connection Complete 11 KV line |
| 107 | Guarding of LT/11 KV Line over (Telephone/Road/L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guar ding channel/ angle as per RESSPO manual. |
| 108 | Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrod e with the help of G.I. wire as per construction manual. |
| 109 | Fixing & Installation of LT Fuse set |
| 110 | Fixing of D-Type bracket on LT line |
| 111 | Fixing of triangular type bracket on 11 KV line |
| 112 | Fixing of Bracing Set |
| 113 | Installation of LT Distribution Box 1 Phase for LT AB Cable |
| 114 | Installation of LT Distribution Box 3 Phase for LT AB Cable |
| 115 | Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line. |
| 116 | Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Weasel as phase wire with G.I. ea rth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and profile and sagging chart. |
| 117 | Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Rabbit as phase wire with G.I. ea rth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and profile and sagging chart. |
| 118 | Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Dog as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile andprofile and sagging chart. |
| 119 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire(3 phase 5 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn |
| 120 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire(3 phase 4 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn |
| 121 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire(2 phase 3 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn |
| 122 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire(1 phase 2 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn |
| 123 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Rabbit as phase wire(3 phase 5 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn |
| 124 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Rabbit as phase wire(3 phase 4 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn |
| 125 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Rabbit as phase wire(2 phase 3 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn |
| 126 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Rabbit as phase wire(1 phase 2 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn |
| 127 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Dog as phase wire(3 phase 5 wire) with G.I. earth wire complete with binding and jumpering as per RESSPO Specn |
| 128 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Dog as phase wire(3 phase 4 wire) with G.I. earth wire complete with binding and jumpering as per RESSPO Specn |
| 129 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Dog as phase wire(2 phase 3 wire) with G.I. earth wire complete with binding and jumpering as per RESSPO Specn |
| 130 | Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Dog as phase wire(1 phase 2 wire) with G.I. earth wire complete with binding and jumpering as per RESSPO Specn |
| 131 | LAYING/ERECTION <(>&<)> COMMISSIONING OF LT AB CABLE OF SIZE 3X120+1X95 SQMM |
| 132 | Laying of LTXLPE ABC 3X120+1X95+1X16 Sq. |
| 133 | Laying of LT XLPE ABC 3X95+1X70 Sq.mm |
| 134 | Laying of LTXLPE ABC 3X25+25 Sq.mm |
| 135 | Laying of LT XLPE AB Cable 3x16+25 Sq.mm. |
| 136 | Laying of LT XLPE AB Cable 1x16+25 Sq.mm. |
| 137 | Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120, 150 Sq.mm. (Including all cost of material) |
| 138 | Laying and erection of L.T. PVCsingle lead Cable including crimping of lugs of size 1x240, 400, 630 Sq.mm etc. (Including all costof material) |
| 139 | Laying & Fixing Insulated Cable LT XLPE Alu. Cond. Power cable |
| 140 | Installation of 33/11 KV Metering cubical in the Metering room with groutingand making all connection |
| 141 | Loading, unloading & carriage of LT PRMC from Store to pit site & Installation on the double pole with the help of Nut Bolt & Clamp and making to pass LT cable from T/F to PRMC. |
| 142 | Excavation of earth of size 2.1x2.1x1.2 meter |
| 143 | Cement concreting work in ratio 1:4:8 |
| 144 | Brick work in 1:4 ratio |
| 145 | RR massonary work in 1:6 ratio |
| 146 | RCC Work of 1:2:4 ratio 15 cm thickness |
| 147 | Cement Plaster on side walls in 1:4 ratio |
| 148 | Erection, providing and fixing of wire mesh of size 50x35 mmaround plinth and toe wall duly welded with frame of M.S angle iron 35 x35x6 mm and strip of size 35x6 mm in mid of each side along with wire mesh (width of wire mesh 1.5 meter) with the heightof 0.5 meter above the plinth and 2 meter above the toe wall with 1 No. gateand locking arrangment in the toe wall size including groutin g of 6 Nos. legs in the ratio inblock of size 0.25x0.25x0.45 meter including gravlling of shingle of size 20 to 40 mm and completepainting of wire mesh with aluminium paint with two coat (Including the cost of cement and all material) |
| 149 | ERECTION OF TAILLESS UNIT |
| 150 | Mounting & Fixing of TPMOon double pole structures including making of connections complete work |
| 151 | Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work |
| 152 | Mounting and Fixing of Lightning arrestor set (3 Nos.) on double pole structure including making allconnections by G.I. strip size35x6 mm to earth point complete work (excluding cost of G.I.Strip) |
| 153 | Making of section pole for existing LT/HT/33KV line complete in all respect. |
| 154 | RECONNECTION OF JUMPERS CABLE AND EARTHING |
| 155 | FABRICATION OF MS CHANNEL ANGLE IRON ETC. IN REQUIRED SIZES WITH DIRLLING OF HOLES UPTO GOOD FINISH OF TOP CHANNEL, BRACING AND SPECIAL TYPE BRACKET ETC. ASPER RESPO SCHEDULE AND LOCAL APPROVED DRAWING. |
| 156 | Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthin g electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I.Strip (to be supplied by contractor) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per I S 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. Theearth resistance after earthing should be less than 1 Ohm. |
| 157 | Dismantling of Transformers from double pole/plinth including openingof all connections, circuts & earthing strip etc. (25 KVA) |
| 158 | Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (63 KVA) |
| 159 | Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (100 KVA) |
| 160 | Installation/mounting of new 25 KVA Tranformer on pole structure and fixing of channel/angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 161 | Installation/mounting of new 63 KVA Tranformer on pole structure and fixing of channel/angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 162 | Installation/mounting of new 100 KVA Tranformer on pole structure and fixing of channel/angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 163 | Installation/mounting of new 250 KVA Tranformer on pole structure and fixing of channel/angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 164 | Installation/mounting of new 250 KVA Tranformer on plinth structure and fixing of channel/angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 165 | Fixing of GI pipe. |
| 166 | Installation of L.T.Distribution Box |
| 167 | Digging of trench of size 0.60x0.15x0.9 mtr. and laying of undergroundLT cable with makingof brick housing and filling of sandincluding filling of earth with ramming. & repairing of road includingcost of cement sand and stone blast |
| 168 | Layingof LT CableinHalf circleHume pipe of Dia 150 mm including cost of hume pipe in depth 0.9 meter |
| 169 | Digging of trench of size 0.60x0.15x1.5 mtr. and laying of underground11 KV XLPE cable with makingof brick housing and fillingof sand including filling of earth with ramming. & repairing of road includingcost of cement sand and stone blast |
| 170 | Layingof 11 KVCableinHalf circleHume pipe of Dia 150 mm including cost of hume pipe in depth 1.5 meter |
| 171 | LAYING OF 11 KV CABLE POLE TO POLE AT AIR |
| 172 | Jointing and fixing of cable jointing kit indoor/outdoor 11 KV XLPEheat shrinkable cable boxes |
| 173 | Providing and fixing of Danger Board and number plate complete by providing clamps of M.S. Flat 50x6 mm and Nuts & Bolts, danger Boa rds of M.S. Sheet 2 mm Thick 11\"\"x7\"\" size (Including cost of all material) |
| 174 | DISCONNECTION AND RECONNECTION OF CONSUMER CONNECTION |
| 175 | Dismantling & reinstallation of street linght with complete fittings |
| 176 | Dismantling of guarding in 11 KV Line |
| 177 | JUMPERING OF D/P TPMO, FUSE SET AND T/F |
| 178 | Dismantling of existing HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store (ACSR Weasel) |
| 179 | Dismantling of existing HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Rabbit) |
| 180 | Dismantling of existing HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Dog) |
| 181 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Weasel) |
| 182 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Rabbit) |
| 183 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Weasel) |
| 184 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Rabbit) |
| 185 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Weasel) |
| 186 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Rabbit) |
| 187 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Dog) |
| 188 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Weasel) |
| 189 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Rabbit) |
| 190 | Dismantling of existing LT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Dog) |
| 191 | Dismantling of LT XLPE Cable 1CX16+25 |
| 192 | Dismantaling of LT XLPE AB CABLE 3X25+25 Sq.mm |
| 193 | Dismantling of Aerial Bunch Cable of all Sizes |
| 194 | Dismantaling of LT XLPE AB CABLE 3X95+1X70 Sq.mm |
| 195 | Dismantling of existing LT/HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street lightconnections etc. including rolling of conductor and cartage back from site to JE store(SP-10 Single Pole) |
| 196 | Dismantling of existing LT/HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street lightconnections etc. including rolling of conductor and cartage back from site to JE store(SP-21/SP-23 Single Pole) |
| 197 | Dismantling of existing LT/HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street lightconnections etc. including rolling of conductor and cartage back from site to JE store(Sp-33 Single Pole) |
| 198 | Dismantling of existing LT/HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street lightconnections etc. including rolling of conductor and cartage back from site to JE store(SP-23 Double Pole) |
| 199 | Dismantling of existing LT/HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street lightconnections etc. including rolling of conductor and cartage back from site to JE store(Sp-33 Double Pole) |
| 200 | Back head load cartage of small line material 0-1Km. |
| 201 | BACK HEAD LOAD CARTAGE OF SMALL LINE MATERIAL 1-3 KM |
| 202 | BACK CARTAGE OF PETTY MATERIAL,0-20 KM |
| 203 | BACK CARTAGE OF PETTY MATERIAL,51-70 KM |