| 1 | Clearing juliflora jungle with uprooting including all labour lead lift etc., complete. |
| 2 | Clearing away the debris, old damaged soil pipe remains away from site, including cost of all materials, labour,lead etc., |
| 3 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed withsmall size boulders SS.20B |
| 4 | Supply of Rcc ring 4\"-0\" dia outer to outer and 1\"-0\" depth including cost of rings, transporting charges,lead,lift,etc, complete |
| 5 | Labour charges for erection of RCC rings into the septic tank pit including cost of all materials,labour ,rope ,pullyand props etc ,complete. |
| 6 | Supply and fixing Rcc Circular cover slab 4\"-0\" dia outer to outer 40mm thick including cost of all materials labour lead,lift,etc,complete |
| 7 | Providing plain cement concrete 1:2:4 mix using 20 mm metal for the base of septic tankincluding cost of allmaterials,labour,lead,lift, etc,complete. |
| 8 | Brick work in CM 1:5 using II class bricks of size 9\" x 4 3/8\" x 2 3/4 \" including cost of all material, lead, lift, labour, etc, complete |
| 9 | Plastering with CM 1:3 - 12mm thick for the RCC ring joints,including cost of all materials labour, lead, lift, etc., complete. |
| 10 | Supplying, fixingand laying of 110 mm dia PVC pipe 6 Kg/cm2 of ISI brand for sanitary arrangementsincluding cost of all materials labour lead,lift etc complete. |