Auction Sale Of Steel Girder Of Overall Length 19.66 Metres - 3 Nos., And Consists Of Top Flange Plate, Web Plate, Main Angle, Bearing Stiffener, Intermediate Stiffener, Splice Cover Angle, Splice Cover Plate In Web, Splice Stiffener Packing, Splice Cover Plate Top & Bottom Flange, Bottom Flange Plate, Bottom & Top Flange Plate, Stiffner Packing Plate, Bearing Stiffner Packing Plate, Bearing Plate, Bearing Strip, Bracket Top Angle, Bracket Web, Bracket Joint Plate Packing, Bracket Joint Plate Top, Cross Frame Diagonal, Cross Frame Strut, Top Lateral Bracing, Different Other Gussets, Attached Rivets And Bolts And Nuts Without Bed Plates As Is Where Is Basis - Qty - 01 By Lot. [Condemned, Released] Custodian : Sr. Section Engineer/Bridges/Kollam. Location : Released From Bridge No.104 Dn (Kurumali River) Between Puk-Nyi Station At Km 48/200-300 Lh Side. Kept Beside Gang Rest Room No.5 At Kurumali., Ds 8 No.592203 Dtd.28.08.2024. Note- Delivery To Be Made On Lot Basis. Special Conditions: 1] Cutting Is Permitted For Loadable Sizes, 2] The Purchaser [By Engaging His Own Labourers] Is Permitted To Cut Girder To Enable Loading By Engaging His Own Labourers. 3] Purchaser Has To Take All Precautions Of Protection Of Property On Either Sides And Tracks. 4] Railway Will Not Be Responsible For Any Mishap During The Course Of Delivery., 5) Jurisdiction- The Courts In Chennai Alone Shall Have Exclusive Jurisdiction In The Matters/Disputes Arising Out Of The Contract/ Arbitration/ Conciliation Proceedings And The Place Of Arbitration/ Conciliation, If Any, Shall Be In Chennai Only., 6) Forfeiture Of Bsv Payment Along With Emd.-In Southern Railway Bsv Partly Paid Along With Emd Will Be Forfeited, If Full Payment Is Not Received In Stipulated Time, With Interest If Any Applicable., 7) Part Delivery-Part Delivery Is Not Permitted Against Part Payment On Southern Railway., Nfs/Side Assets : 1] All Holders For Signal Pipes Are Not Included In The Lot. The Holders Or Parts Of Holders Are To Be Cut And Handed Over To Custodian At The Time Of Delivery For Further Action., 2] Crimbs - 20 Nos Approximate., 3] Rails, Channel Sleepers - 1 Lot., 4] So Many Track Materials Are Kept Near By Being P.Way Track Gang Rest Room., 5] Any Other P.Way Attachment Or Material Other Than Description Found During Delivery, The Same Is Treated As Nfs. [Pl No. 98057054, Hsn Code : 720429, Gst : 18 % On Fcm], Item : Girder On Lot Basis. [Image Attached].