Tender For Repair / Maintenance Of Gi Charopy, Plyboard, Newar, Recanning Etc Of Various Furniture At Af Station Under Ge (Af) Jamnagar No.2-Material & Labour for removing of unserviceable Charpoy GI Pipe nylon newar to charpoy GI pipe with Plywood top, tightening of all loose components of complete charpoy such as check nuts, elbows, long rails, short rails, legs, etc and supply and fixing 12mm thick Plywood, 7 Ply, commercial type, BWR, exterior grade (water proof), ISI marked, of size 1980 mm x 920 mm in single piece fixed on top of Charpoy GI pipe with & including supplying and fixing two Nos stiffeners made out of mild steel flat iron 35mmx5mm, 880mm long between long rails parallel to short rails with equal spacing and power welding duly painted with two coats of synthetic enamel paint over a coat of red oxide zinc chromate primer, plywood top fixed with and including mild steel galvanized iron nuts & bolts of size 70mm long x 6mm dia (Nos of bolts to be provided - 12 Nos) with GI washers of suitable size (Heavy weight) in sufficient numbers on top of bolts to maintain the plywood top in true leveled position and one GI washer on underside of each bolt for proper tightening of bolt, embossing word MES” with height of letters 10cm on four corners of the plywood top with thick black synthetic enamel paint, complete all as specified, shown on drawings and as directed. Notes :- (i) The above mentioned size of plywood is firm and no tolerance in size, thickness etc shall be accepted. (ii) Plywood shall be provided in single piece in each Charpoy. (iii) Electric arc welding shall be used to fix stiffeners. (iv) Welding rod shall be ISI marked. (v)Purchase voucher of plywood shall be obtained by the contractor from authorised dealer/manufacturer and shall be submitted to Engineer-in-Charge.Drg No;-FD-220 2 Material & Labour for removing of unserviceable long rail of Charpoy GI pipe and supply and fixing new long rail made out of GI tubing 32 mm bore, medium grade, ISI Marked, 1980mm long, dulycontinuous welded properly at both ends as per best trade practice and also duly painted with aluminium paint on welded portion, complete all as specified, shown on drawings and as directed. Notes :- (i) Welding of new rail shall be as per best trade practice with continuous welding and as approved by GE. (ii) Unit for measurement of this item is ‘Each’Job which shall comprise of removing of one old long rail and supply and fixing of one new long rail in lieu.(iii) Electric are welding shall be used. (iv) Welding rod shall be ISI marked. Drg NO- FD-220 3 Dismantling carefully unserviceable short rail of Charpoy GI pipe and replacement by short rail made out from old long rail GI pipe retrieved under serial item No. 1.01 here-in-before, dulycontinuous welded properly at both ends as per best trade practice and also duly painted with aluminium paint on welded portion, complete all as specified, shown on drawings and as directed. Notes :- (i) Welding of rail shall be as per best trade practice with continuous welding and as approved by GE. (ii) Unit for measurement of this item is ‘Each’ which shall comprise of removing of one old short rail and fixing of one short rail in lieu made out of old long rail. (iii) The rate quoted for this item shall include for making of short rail by cutting from old long rail in appropriate size. (iv) Electric arc welding shall be used. (v) Welding rod shall be ISI marked. Drg NO. FD-220 4 Dismantling carefully uncerviceable leg of Charpoy GI pipe and replacement by leg made out of from old short rail GI pipe retreived under serial item No.1.02 here-in-beore duly continious welded property at one end as per best trade practice and also duly painted with aluminium paint on welded portion with & including supply & fixing mild steel 5mm thick & 35mm dia plate to the bottom leg duly continous welded as per best trade practice and also duly painted with two coats of aluminim paint complete all as specified shown or drawing and as directed. Notes : - (i) Welding of leg shell be as per best trade practice with contionous welding and as approved by GE (ii) Unit for measurement of this item in each job which shell comprise of removig of one old leg and fixing of one leg in lieu made out of shore rail (iii) The rate quoted for this item shell include for making of leg by cutting from old short rail approprite size (iv) Electric arc welding shell be used (v) welding rod shell be ISI marked. Drg NO.FD-220 5 Supply & fixing in position GI 3 way elbow 32mm bore, medium grade (‘B’ Class), ISI marked in Charpoy GI pipe including dismantling & taking out carefully old unserviceable GI 3 way elbow 32mm bore complete all as specified, shown on drawings and as directed. Drg NO.FD-220 6 Supply & fixing in position GI check nut 6mm thick 32mm bore, medium grade (‘B’ Class), ISI marked in Charpoy GI pipe including dismantling & taking out carefully old unserviceable GI check nut complete all as specified, shown on drawings and as directed. Drg No. FD-220 7 Material & labour for electric welding of long rails, short rails, legs of 32mm bore GI tubing by continuous welding around the broken joint duly painted with aluminium paint on welded portion complete all as specified & as directed. Notes :-(i) Unit for measurement of this item is ‘Each’ which shall comprise of welding of each broken joint all as specified above.(ii) Welding rods shall be ISI marked (iii) This item shall not be paid for serial item No.1.00 to 1.06 here-in-before. DRg NO.FD-220 8 Removing old and unserviceable parts / components of “ Chair Verandah with PVC seatand S&F new parts / components of same size, existing pattern and with appropriate weldingandpainting to match with existing complete all as shown on drawing & as directed by Engineer-in-charge.(Drg No FD/MAP/15/06) 9 Removing of U/S PVC seat of chair verandha and S & F with new of seat ofchair verandha as per drg. All as specified and as directed by Engr-in-charge. 10 Removing of U/S PVC seat of chair verandha and S & F with new of Back ofchair verandha as per drg. All as specified and as directed by Engr-in-charge. 11 Rejoining the joints of MS tube with spot weldingin any length where required as per drg.All as specified and as directed by Engr-in-charge. 12 Renoving of underviceable Rubber shoe chair Verandhah S&F with new Rubber shoesas per existing size on drg.All as specified and as directed by Engr-in-charge. 13 Repairs to Recliner by replacing of unsv seat / back cushion foam with tapestry cloth/rexin/leatherite and other aceesories what so ever requiredas per existing pattern/structure and sample approved by Engr - in - Charge. (Drg No. Stellar, Godrej, Durian). 14 M&L for replacement of old u/s seat/back cushions, S&F new foam cushion of size 21x20x100mm thick, 32 density (Make: Sleepwell/kurlon) duly covered with tapestry cloth of approved quality/colou/texture (Cost of tapestry Superior quality of foam & cover tepesty cloth approved by GE not less than 340/- per running metre) (Drg No FD-281) 15 M&L for replacement of old u/s tapestry cloth of seat/back cushion, S&F new tapestry cloth of approved quality/colou/texture (Cost of tapestry shall not be less than Rs.340/- per metre) all as specified and directed.