}

Tender For Supply Of Lab Equipment For Machines Lab, thoothukudi-Tamil Nadu

Government Polytechnic College has published Tender For Supply Of Lab Equipment For Machines Lab. Submission Date for this Tender is 25-07-2025. Laboratory Equipment Tenders in thoothukudi Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

50087102
Tender For Supply Of Lab Equipment For Machines Lab
Tender
Indian
Tamil Nadu
Thoothukudi
25-07-2025

Tender Documents

Tender Details

Tender For supply of Lab Equipment for Machines Lab , Consumables , Plc Trainer Kit Allen Bradley Micro 810 Plc Analog And Digital I/O Module ? Plc Trainer With Allen Bradley Micro810controller (2080Lc1012qwb) 6 Digital Inputs, 2 Analog Inputs And 4 Digital Outputs ? 6 Digital Input Switches ? 2 Analog Inputs With Dc (0-10V) Variable Input ? 4 Digital Relay Outputs With Led Indication ? 4 No Contacts Of The Relays Connected At Outputs Of The Plc And A Buzzer ? 24V Operated, Built-In Power Supply, Additional 5V Power Supply ? Computer Connectivity To Download The Program Using Usb Port With Cable Professional Programming Software - Component Connect Workbench (Ccw) ? Legend Printed In The Pcb ? Closed Wooden Cabinet , Trainer Kit - Interfacing Of Discrete Field Devices With Plc (Push Button, Limit Switch, Reed Switch, 3-Wire Proximity Sensor And Buzzer) Sequence Of Operation: ? Develop Ladder Logic In Plc To Execute The Following Logical Relation Between The Input And Output Field Devices. ? Y = A + B + C + D ? Y = A. B.C. D ? Y = (A+B). (C+D) ? Y = (A.B) + (C.D) Interface Contains: ? Plc Input Interfacing Push Button (A) Limit Switch (B) Reed Switch (C) 3 Wire Inductive Proximity Sensor (D) ? Plc Output Interfacing Buzzer (Y) Closed Wooden Cabinet , Ttrainer Kit – Plc Based Conveyor System With Pre Warning Siren Interface Sequence Of Operation: ? Develop And Execute Ladder Logic In Plc Using An On Delay Timer To Delay The Start Of A Conveyor. ? While Press The Start Button, Activate The Warning Siren For Pre-Set Time. After The Pre-Set Time Delay The Warning Siren Turns Off And The Conveyor Starts Running. ? When Stop Button Is Pressed Turns Off The Conveyor Interface Details – Sloped Conveyor System: Mechanical Setup: ? Sloped Conveyor Integrated With 1 Nos. Shawl Sheet Metal Models For Material Handling Demonstration. Plc Input Interfacing: ? 1 No. Inductive Proximity Sensors To Detect Presence Of Shawls On The Conveyor. ? 1 No. Start Push Buttons – One For Each Conveyor. ? 1 No. Stop Push Buttons – For Individual Conveyor Control. ? 1 No. Fwd/Rev Toggle Switches – To Set Direction Of Conveyor Operation (Forward/Reverse). Plc Output Interfacing: ? 1 No. Siren – To Provide Audible Alarms Upon Detection Events Or Conditions. ? 1 No. Conveyor Belts Driven By Geared Dc Motors – Controlled Through Plc For Start/Stop And Direction. All Components Housed In A Metal Closed Cabinet For Safety Integration , Itrainer Kit – Plc Based Water Level Control System Interface Sequence Of Operation: ? Develop And Execute Ladder Logic In Plc To Fill The Empty Tank With Liquid When The Start Button Is Pressed. ? When Liquid Reaches The High Level, Turn Off The Pump Motor And Turn On The Solenoid Valve To Drain The Liquid From Tank. ? When Liquid Reaches The Low Level, Turn Off The Solenoid Valve And Turn On The Pump Motor For Refilling. ? Interface External Pilot Lamp With Plc To Indicate The Operation Of Pump Motor And Solenoid Valve. Interface Contains: ? Low High Level Sensors As Input To The Plc ? Water Tap As Output From The Plc ? Water Pump Motor Control Using Outputs Of The Plc ? Water Tank With Sump And Overhead Tank Model ? 2 Levels Sensor Switches And 12 V Pump ? 24 V Solenoid Valve To Drain Water, ? Foot Valve Arrangement To Take The Water From The Sump 12 V And 24V Power Supply Provided , Trainer Kit – Plc Based Counting Of Moving Objects On Two Conveyors Interface Sequence Of Operation: ? A Manufacturing Plant Is Arranged With 2 Feeder Conveyors For Transferring The Objects Into The Plant. ? Develop And Execute Ladder Logic Using Math Instruction In Plc To Get The Total Number Of Objects Transferred By 2 Conveyors Into The Plant. ? When The Count Of Total Object Has Reached Pre-Set Count Value, Turn On Buzzer To Give Beep Sound For 1 Second And Turn Off The Conveyors. Interface Details – Sloped Conveyor System: Mechanical Setup: ? Sloped Conveyor Integrated With 2 Nos. Shawl Sheet Metal Models For Material Handling Demonstration. Plc Input Interfacing: ? 2 Nos. Inductive Proximity Sensors To Detect Presence Of Shawls On The Conveyor. ? 2 Nos. Start Push Buttons – One For Each Conveyor. ? 2 Nos. Stop Push Buttons – For Individual Conveyor Control. ? 2 Nos. Fwd/Rev Toggle Switches – To Set Direction Of Conveyor Operation (Forward/Reverse). Plc Output Interfacing: ? 2 Nos. Buzzers – To Provide Audible Alarms Upon Detection Events Or Conditions. ? 2 Nos. Conveyor Belts Driven By Geared Dc Motors ? Controlled Through Plc For Start/Stop And Direction. All Components Housed In A Metal Closed Cabinet For Safety Integration. , Trainer Kit – Plc Based Car Parking Control System Interface Sequence Of Operation – Parking Lot Management: Parking Capacity: The Parking Lot Accommodates A Maximum Of 10 Cars. Sensor Interfacing: ? Sensor 1 (Opto Interrupter Or Proximity Sensor) Is Installed At The Entry Gate To Detect Incoming Vehicles. ? Sensor 2 (Opto Interrupter Or Proximity Sensor Is Installed At The Exit Gate To Detect Outgoing Vehicles. Logic Implementation: ? Develop And Execute A Ladder Logic Program In The Plc To: ? Increment The Car Count When Sensor 1 Is Triggered (Entry). ? Decrement The Car Count When Sensor 2 Is Triggered (Exit). Pilot Lamp Indication: ? When The Car Count < 10, Turn On The Available Pilot Lamp. ? When The Car Count = 10, Turn On The Full Pilot Lamp And Disable The Barrier Gate At Entry To Prevent Additional Vehicles From Entering. Interface Details: Plc Input Interfacing: ? 2 Nos. Opto Interrupter Sensors ? 1 No. At Entry Gate ? 1 No. At Exit Gate ? 2 Nos. Limit Switches For Position/Status Detection ? 2 Nos. Pilot Lamps ? 1 No. For Availability Status ? 1 No. For Full Capacity Indication Plc Output Interfacing: ? Barrier Gate Control For Incoming And Outgoing Vehicles Using 2 Nos. Dc Motors Wooden Closed Cabinet For Housing All Plc And Interfacing Components , Trainer Kit – Plc Based Fan Control For Energy Conservation Interface Sequence Of Operation – Meeting Hall Fan Control: ? Objective: Develop And Execute A Ladder Logic Program In Plc To Control The Operation Of Fans In A Meeting Hall Based On Real-Time Person Count. Sensor Interfacing: ? Interface A Suitable Photoelectric Proximity Sensor Or Ir Sensor At The Entry Gate To Detect And Count Individuals Entering The Hall. Output Devices: ? Interface Low Voltage Dc Fans With The Plc For Output Control. ? Assume The Meeting Hall Capacity Is 10 Persons For Logic Reference. Control Logic: ? <50% Occupancy (0–4 Persons): Urn On Fan F1 And Fan F2 ? 70–80%Occupancy (7–8 Persons): Turn On Fan F1, F2, And F3 ? = 90% Occupancy (9 Or More Persons): Turn On Fan F1, F2, F3, And F4 Real-Time Interface: ? System Should Dynamically Update The Fan Outputs Based On Live Person Count. Interface Details Plc Input Interfacing: ? 2 Nos. Photoelectric Proximity Sensors ? 1 No. At Entry Hall 1 No. At Exit Hall Plc Output Interfacing: - 4 Nos. 24V Dc Fans Wooden Closed Cabinet For Housing Components , Rainer Kit – Plc Based Illumination Control System Sequence Of Operation: ? Develop And Execute A Ladder Logic Program For A Multilevel Illumination Control System Using Plc. ? The System Will Read Input From A Potentiometer, And Based On Its Percentage Value, Control The Number Of Lamps Activated As Follows: ? = 25%: Turn On 1 Lamp To Achieve Minimum Illumination. ? = 50%: Turn On 2 Lamps To Achieve Medium Illumination. ? = 75%: Turn On 3 Lamps To Achieve Maximum Illumination. ? The Control Logic Should Ensure Smooth Transitions Between Illumination Levels As The Potentiometer Value Changes. Interface Details: Plc Input Interfacing: ? 1 No. Potentiometer For Percentage-Based Input Reading ? 1 No. Ldr (Light Dependent Resistor) For Illumination Sensing Plc Output Interfacing: ? 4 Nos. 24V Led Light Setup (Controlled Via Plc Output) Real-Time Interface: ? Live Data Acquisition And Control For Immediate System Response Wooden Closed Cabinet For Secure And Organized Housing Of Components. , Conveyor Trainer Kit (Without Plc): Control And Power Circuit For Conveyor Motor Without Plc Sequence Of Operation: Control And Main Circuit For Conveyor Motor With Detection Of Metal Object Stop The Conveyor Motor For 5 Seconds. (Use Proximity Sensor And Timer)

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail