Name of Work:Construction of Additional Class Room At Dinakushnapur PS Baunsabania Oupada In Balasore District
Sl. No.
Item Description
1
R,C.C works of M-20 grade with 20mm & down grade HG CB chips incl. cost of bore holes but excl. cost of M.S. rod/Tor steel & Labour chargees for cutting & binding of steel etc. complete
2
Sand filling in foundation & plinth well watered & rammed etc. Complete
3
R,C.C works of M-20 grade with 20mm & down grade HG CB chips incl. hoisting laying etc. Complete
4
Rigid smooth centering & shuttering for C.C works incl. false work dismantiling them after casting incl. cost of all materials etc completeFoundation
5
Lintel
6
Columns and Beams
7
Chajja & Roof slab
8
Brick work with fly Ash bricks 25cm X 12cm X 8cm size having crussing strength not less then 75 kg/ cm2 with dimentional tolerance +-8% in C.M (1:6) in fdn & plinth etc. completeFoundation
9
Superstructure
10
20mm thick C.P. in CM (1:4) provided as grading plater over top of roof slab etc.Complete
11
Supplying , fitting , fixing & placing uncoatingHYSD bar reinforcement incl. all cost of materials & complete.
12
16mm thick C.P. in CM(1:6) on brick wall surface etc.complete
13
12mm thick Cement plaster (1:6) for brickwork including curing etc. complete.
14
6mm thick C.P. in CM (1:4) to R.C.C surface finished smooth incl.closed deep chiping & slury treatment etc. complete
15
Fixing tiles in floors, traders or steps & landing on 25mm thick bed of C.M (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles incl. rubbing & polishing
16
Supplying fitting fixing of GI shutter & Grill for windows incl. all cost labour, materials, GST etc. complete.
17
Labour for priming one coat with any approved primer but excluding cost of primer.
18
Wall painting two coats with plastic emulsion paint of approved shade on new work to give an even shade excl. cost of paint
19
Wall painting two coats with exterior weather paint of approved shade on new work to give a even shade excl. cost of paint.
20
Labour for painting 2 coats with any approved wood sign paint over a coat of priming but excludig cost of paint & primeretc. Complete
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.