Tender For 1. Renovation Of Pum School Building ( 3 Class Room) West Facing At Paingattur Habitation In Paingattur Panchayat, 2. Renovation Of Pum School Building ( 3 Class Room) North Facing At Paingattur Habitation In Paingattur Panchayat,
Tender Overview
Project Description
1. Renovation Of Pum School Building ( 3 Class Room) West Facing At Paingattur Habitation In Paingattur Panchayat, 2. Renovation Of Pum School Building ( 3 Class Room) North Facing At Paingattur Habitation In Paingattur Panchayat, 3. Repair
BOQ
| Sl. No. | Item Description |
| 1 | 1. Renovation of PUM School Building ( 3 Class Room) West Facing at PaingatturHabitationin Paingattur Panchayat. |
| 2 | Dismantaling of Ceiling Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 3 | Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 4 | Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 5 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 6 | Dismantaling of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 7 | Provaiding of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 8 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 9 | Repair todoor including all cost of convenyence,.and all labour charges etccomplete,. |
| 10 | Repair toWindow including all cost of convenyence,.and all labour charges etccomplete,. |
| 11 | Supply and Fixing of New SteelWindow including all cost of convenyence,.and all labour charges etccomplete,. |
| 12 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 13 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 14 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 15 | Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 16 | Provision for White Board |
| 17 | Black BoardPainting |
| 18 | Electrical Work: |
| 19 | LightPoint, Fan Point |
| 20 | Tube light Fitting |
| 21 | Plug Point |
| 22 | Provision for Teacher Cubboard: |
| 23 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 24 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 25 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 26 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 27 | Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 . |
| 28 | Provision for Students Cubboard: |
| 29 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 30 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 31 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 32 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 33 | Provision for Cheppal Rack : |
| 34 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 35 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 36 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 37 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 38 | Provision for Drinking arrangements :- |
| 39 | Dismantling the Existing Damagedcement Plasteringincluding allchages etc for complete |
| 40 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, |
| 41 | Collection and supply of sandand filling in to the basement including cost and |
| 42 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, |
| 43 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 44 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 45 | Providing granolithicfloor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. |
| 46 | Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 47 | Provision for PVC Pipe,Tank and Tap arrangements |
| 48 | Painting ( Picture Painting for School building ) withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta ( BALA Painting) |
| 49 | Provision for Springs |
| 50 | Provision for Name board |
| 51 | 2. Renovation of PUM School Building ( 3 Class Room) NorthFacing at PaingatturHabitationin Paingattur Panchayat. |
| 52 | Dismantaling of Ceiling Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 53 | Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 54 | Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 55 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 56 | Dismantaling of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 57 | Provaiding of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 58 | Repair todoor including all cost of convenyence,.and all labour charges etccomplete,. |
| 59 | Repair toWindow including all cost of convenyence,.and all labour charges etccomplete,. |
| 60 | Dismantaling ofDamaged Pressed TilesIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 61 | Pointing with cement mortar 1:3 to full depth of tilesusingcrudeoil 10% byweight of cementincluding cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm |
| 62 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stoneM.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 63 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 64 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 65 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 66 | Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 67 | Provision for White Board |
| 68 | Black BoardPainting |
| 69 | Electrical Work: |
| 70 | LightPoint, Fan Point |
| 71 | Tube light Fitting |
| 72 | Plug Point |
| 73 | Provision for Teacher Cubboard: |
| 74 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 75 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 76 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 77 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 78 | Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 . |
| 79 | Provision for Students Cubboard: |
| 80 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 81 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 82 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 83 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 84 | Provision for Cheppal Rack : |
| 85 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 86 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 87 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 88 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 89 | Provision for Drinking arrangements :- |
| 90 | Dismantling the Existing Damagedcement Plasteringincluding allchages etc for complete |
| 91 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, |
| 92 | Collection and supply of sandand filling in to the basement including cost and |
| 93 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, |
| 94 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 95 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 96 | Providing granolithicfloor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. |
| 97 | Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 98 | Provision for PVC Pipe,Tank and Tap arrangements |
| 99 | Painting ( Picture Painting for School building ) withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta ( BALA Painting) |
| 100 | Provision for Springs |
| 101 | Provision for Name board |
| 102 | 3. Repair to RCC Building SSA @ PUE SchoolWest Facingat ValiodaiHabitationin Paingattur Panchayat. |
| 103 | Dismantling the Existing Damagedcement Plasteringincluding allchages etc for complete |
| 104 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 105 | Repair todoor including all cost of convenyence,.and all labour charges etccomplete,. |
| 106 | Repair toWindow including all cost of convenyence,.and all labour charges etccomplete,. |
| 107 | Repair toWindow including all cost of convenyence,.and all labour charges etccomplete,. |
| 108 | Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement |
| 109 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 110 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 111 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 112 | Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 113 | Black BoardPainting |
| 114 | Provaiding of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 115 | Painting ( Picture Painting for School building ) withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta ( BALA Painting) |
| 116 | Provision for Springs |
| 117 | Provision for White Board |
| 118 | Provision for Electrofication |
| 119 | Provision for Name board |
| 120 | 4. Renovation of PUM School Building ( 2 Class Room) East Facing at PaingatturHabitationin Paingattur Panchayat. |
| 121 | Dismantaling of Ceiling Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 122 | Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 123 | Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 124 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 125 | Dismantaling of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 126 | Provaiding of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 127 | Repair todoor including all cost of convenyence,.and all labour charges etccomplete,. |
| 128 | Repair toWindow including all cost of convenyence,.and all labour charges etccomplete,. |
| 129 | Dismantaling ofDamaged Pressed TilesIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 130 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stoneM.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 131 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 132 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 133 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 134 | Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 135 | Provision for White Board |
| 136 | Black BoardPainting |
| 137 | Electrical Work: |
| 138 | LightPoint,Fan Point |
| 139 | Tube light Fitting |
| 140 | Plug Point |
| 141 | Provision for Teacher Cubboard: |
| 142 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 143 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 144 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 145 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 146 | Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 . |
| 147 | Provision for Students Cubboard: |
| 148 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 149 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 150 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 151 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 152 | Provision for Cheppal Rack : |
| 153 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 154 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 155 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 156 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 157 | Provision for Drinking arrangements :- |
| 158 | Dismantling the Existing Damagedcement Plasteringincluding allchages etc for complete |
| 159 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, |
| 160 | Collection and supply of sandand filling in to the basement including cost and |
| 161 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, |
| 162 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 163 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 164 | Providing granolithicfloor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. |
| 165 | Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 166 | Provision for PVC Pipe,Tank and Tap arrangements |
| 167 | Painting ( Picture Painting for School building ) withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta ( BALA Painting) |
| 168 | Provision for Springs |
| 169 | Provision for Name board |
| 170 | 5. Renovation of PUM School Building ( 2 Class Room) NorthFacing at PaingatturHabitationin Paingattur Panchayat. |
| 171 | Dismantaling of Ceiling Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 172 | Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 173 | Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 174 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 175 | Dismantaling of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 176 | Provaiding of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 177 | Repair todoor including all cost of convenyence,.and all labour charges etccomplete,. |
| 178 | Repair toWindow including all cost of convenyence,.and all labour charges etccomplete,. |
| 179 | Dismantaling ofDamaged Pressed TilesIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 180 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stoneM.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 181 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 182 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 183 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 184 | Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 185 | Provision for White Board |
| 186 | Black BoardPainting |
| 187 | Electrical Work: |
| 188 | LightPoint,Fan Point |
| 189 | Tube light Fitting |
| 190 | Plug Point |
| 191 | Provision for Teacher Cubboard: |
| 192 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 193 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 194 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 195 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 196 | Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 . |
| 197 | Provision for Students Cubboard: |
| 198 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 199 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 200 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 201 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 202 | Provision for Cheppal Rack : |
| 203 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 204 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 205 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 206 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 207 | Provision for Drinking arrangements :- |
| 208 | Dismantling the Existing Damagedcement Plasteringincluding allchages etc for complete |
| 209 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, |
| 210 | Collection and supply of sandand filling in to the basement including cost and |
| 211 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, |
| 212 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 213 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 214 | Providing granolithicfloor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. |
| 215 | Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 216 | Provision for PVC Pipe,Tank and Tap arrangements |
| 217 | Painting ( Picture Painting for School building ) withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta ( BALA Painting) |
| 218 | Provision forSprings |
| 219 | Provision for Name board |
| 220 | 6.Renovation of PUM School Toilet Building ( 2 Class Room) NorthFacing at PaingatturHabitationin Paingattur Panchayat. |
| 221 | Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,… |
| 222 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 223 | Repair to Steel Door including allcost and Convenyence |
| 224 | Provision forWater SupplyArrangement |
| 225 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 226 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 227 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 228 | Painting two coats over Old iron works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 229 | SUB ESTIMATE -SEPTIC TANK |
| 230 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete |
| 231 | Supplying and filling in foundation and basement with filling sand including water consolidating etc., |
| 232 | PCC 1:4:8 using 40mm HBGs jelly for foundation concrete |
| 233 | Brick work in cement mortar 1:5 using country bricks of size 83/4\"x41/4\"x23/4\" etc., complete |
| 234 | Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 235 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 236 | Supplying and fabricating and placing in position MS or RTS reinforcement works |
| 237 | Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly |
| 238 | Supply and Fixing of Soakpit pit arrangements for cover slab and Rcc rings etc |
| 239 | 7.Renovation of PUM School Toilet BuildingNorthFacing -2 at PaingatturHabitationin Paingattur Panchayat. |
| 240 | Dismantling the Existing DamagedcementFlooringincluding allchages etc for complete |
| 241 | Dismantling the Existing DamagedWall Plasteringincluding allchages etc for complete |
| 242 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 243 | Plastering with cm 1:5mix 12mm thick including cost,conveyance and all other labour charges etc |
| 244 | Provaiding of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 245 | Provision for Steel Door including all Charges |
| 246 | Provision for Water Supply extension |
| 247 | Provision forHDPETank 500Lit |
| 248 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 249 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 250 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 251 | Painting two coats over Old iron works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 252 | Provision forEWC |
| 253 | Provision for Septic tank cleaning |
| 254 | Provision for Name board |
| 255 | 8.Renovation of PUE School Toilet (SSA) BuildingWest Facing at ValivodaiHabitationin Paingattur Panchayat. |
| 256 | Dismantling the Existing DamagedWall Plasteringincluding allchages etc for complete |
| 257 | Plastering with cm 1:5mix 12mm thick including cost,conveyance and all other labour charges etc |
| 258 | Provision for Steel Door including all Charges |
| 259 | Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in including cost and conveyance of all materials to site and all labour charges etc complete |
| 260 | Paving the Floor with scratch proof Antiskit tiles of size 20*20mm including |
| 261 | Provision for Water Supply extension |
| 262 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 263 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 264 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 265 | Painting two coats over Old iron works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 266 | Provision for Septic tank cleaning |
| 267 | Provision for Name board |
| 268 | GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender