| 1 | CIVIL WORK:-Earth work in excavation of foundation trenches in ordinary soil except sheetrockandboulders(requiringblasting)includingdressingand leveling the bed upto the required depth and depositing the excavated materials away form the site with all leads and lifts. T & P shoring and shuttering if required etc. complete as directed by engineer- in charge. |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
| 3 | Fillinginfoundationandplinthwithexcavatedmaterialsincludingwaterandrammingas directed by the Engineer-in -charge. |
| 4 | C.C.(1:4:8) using 40mm HG metal of approved quality from approved quarry incl. hoisting, compactingcuring,finishingtheexposedsurfacesmooth,dewatering,shoring,shutteringif necessaryatthetimeoflayingconcretewithcost,conveyance,royalty&taxesofall materials,cost of labour and T&p etc. all complete as per the direction of E.I.C. |
| 5 | Random rubble hard granite Stone Masonry in cement mortar (1:6) in Foundation & Plinth…etc/compl. as per the direction of E.I.C. |
| 6 | R.C.C. work of M - 20 grade with 20 mm and down grade HGCB chips incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing,finishing the exposed surface smooth, dewatering, shoring,shuttering ifnecessary atthe timeoflaying concrete with cost, conveyance, royalty & taxes of all materials, cost of labour and T&p etc. all complete as per the direction of E.I.C.a) Bases of column,footing. |
| 7 | R.C.C. work of M - 20 grade with 20 mm and down grade HGCB chips incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing,finishing the exposed surface smooth, dewatering, shoring,shuttering ifnecessary atthe timeoflaying concrete with cost, conveyance, royalty & taxes of all materials, cost of labour and T&p etc. all complete as per the direction of E.I.C. b) Plinth Band. |
| 8 | R.C.C. work of M - 20 grade with 20 mm and down grade HGCB chips incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing,finishing the exposed surface smooth, dewatering, shoring,shuttering ifnecessary atthe timeoflaying concrete with cost, conveyance, royalty & taxes of all materials, cost of labour and T&p etc. all complete as per the direction of E.I.C. c) Column & Beam |
| 9 | R.C.C. work of M - 20 grade with 20 mm and down grade HGCB chips incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing,finishing the exposed surface smooth, dewatering, shoring,shuttering ifnecessary atthe timeoflaying concrete with cost, conveyance, royalty & taxes of all materials, cost of labour and T&p etc. all complete as per the direction of E.I.C.d) Lintel & Wall band. |
| 10 | R.C.C. work of M - 20 grade with 20 mm and down grade HGCB chips incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing,finishing the exposed surface smooth, dewatering, shoring,shuttering ifnecessary atthe timeoflaying concrete with cost, conveyance, royalty & taxes of all materials, cost of labour and T&p etc. all complete as per the direction of E.I.C.e) Sunshade & chajja. |
| 11 | R.C.C. work of M - 20 grade with 20 mm and down grade HGCB chips incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing,finishing the exposed surface smooth, dewatering, shoring,shuttering ifnecessary atthe timeoflaying concrete with cost, conveyance, royalty & taxes of all materials, cost of labour and T&p etc. all complete as per the direction of E.I.C.f) RCC roof slab. |
| 12 | Supplying and labour for cutting,bending,binding,tying the grills & placing in position of steel reinforcements (SAIL) forRCC works including cost of binding wires of 18-20 gauge as per drawing and specification as per drawing, design and direction of Engineer-in-charge. |
| 13 | Brick work with FlyashBricks in cement mortar (1:6) inhaving crushing strength not less than 75.00 Kg/cm2 immerging the bricks in water not less than six hours with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. a) For foundation & Plinth.. |
| 14 | Brick work with FlyashBricks in cement mortar (1:6) inhaving crushing strength not less than 75.00 Kg/cm2 immerging the bricks in water not less than six hours with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. b) For superstructure. |
| 15 | Supplying, fitting and fixing steel Angle iron door and windowsas per approved design and drawing including all cost of materials and labour etc complete as per direction of Engineer in charge |
| 16 | 16mmthickcementplaster(1:6),finishedsmoothtobrickmasonryworkininsidesurface after cleaning the surface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials, labour and T&P etc complete as per the direction of E.I.C. |
| 17 | 12mm thick cement plaster (1:6) for brick masonry workin outside surface after racking out jointsincl.watering,curingetc.completewithcost,conveyance,royalties&taxesofall materials, labour and T&P etc complete as per the direction of E.I.C. |
| 18 | 20mmthickgradingplaster(1:4),finishedsmoothoverroofslabaftercleaningthesurface incl.watering, curing etc. complete with cost, conveyance, royalties & taxes of all materials,labour and T&P etc complete as per the direction of E.I.C |
| 19 | Fixing Kota tiles in Dados on 12 mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shades of the tiles incl. rubbing and polishing complete incl. cost of tile etc all complete. |
| 20 | Fixing Kota tiles in floor on 25 mm thick cement plaster (1:1) joined with neat cement slurry mixed with pigment to match the shades of the tiles incl. rubbing and polishing complete incl.cost of tile etc all complete. |
| 21 | Wall putty two coat with approved putty(Acrylic wall putty)r on Plaster Surface incl. cost of all material, labour and T&P etc. complete. as per the direction of E.I.C. |
| 22 | Distemperingtwo coats with approved shade over a coat of oil bound primer incl. cost of all material, labour and T&P etc. complete..as per the direction of E.I.C. |
| 23 | Painting two coats with approved paint to doors and windowsover a coat of primer incl. cost of all material,T&P and labour etc complete. ( for Iron work ) as per the direction of E.I.C. |
| 24 | Weather coat painting two coats with approved shade over a coat of oil bound primer incl.cost of all material,T&P and labour etc complete.as per the direction of E.I.C. |
| 25 | B) ELECTRICAL WORKS :-Recessed wiring to light point/Fan point/Exhaust fan point /call bell point with 1.50sqm FR PVC insulated single core multistrand copper conductor withswitch(V.Guard/L7T/Anchor/Havells) etc provisionto be paid as per actual.(a) Group-A |
| 26 | Recessed wiring to light point/Fan point/Exhaust fan point /call bell point with 1.50sqm FR PVC insulated single core multistrand copper conductor withswitch(V.Guard/L7T/Anchor/Havells) etc provisionto be paid as per actual.(b) Group-B |
| 27 | Recessed wiring to light point/Fan point/Exhaust fan point /call bell point with 1.50sqm FR PVC insulated single core multistrand copper conductor withswitch(V.Guard/L7T/Anchor/Havells) etc provisionto be paid as per actual.(c) Group-C |
| 28 | S/Fof5A Switch & Socket |
| 29 | Circuit Submain Wiring in PVC Conduit. (a)2x1.5sq.mm.+1x1.5sq.mm. |
| 30 | Circuit Submain Wiring in PVC Conduit. (b)2x2.5sq.mm.+1x1.5sq.mm. |
| 31 | Circuit Submain Wiring in PVC Conduit.(c)2x4sq.mm.+1x1.5sq.mm. |
| 32 | S/Fof BK Angle Holder |
| 33 | S/Fof48\"\" A.C. Ceiling Fan Angle Holder |
| 34 | S/Fof 9 Watt LED Bulb |
| 35 | S/Fof20 Watt LEDBatten fitting |
| 36 | S/Fof4Way MCB D.B. Single Door |
| 37 | S/Fof B series SP Way MCB |
| 38 | S/Fof 32 Amp DP Main Switch |
| 39 | S/Fof standard Earthing |
| 40 | S/Fof No.8 SWG Copper Wire. |