|
| 1 | Supply Part |
| 2 | 11 kV Disc Insulator complete set including Dead end clamps. Ball cleave eye socket etc. |
| 3 | 11 kV Pin Insulators ( porcelain, 12 kV, 10 kN): 3 No. Per pole structure |
| 4 | 33 kV Discs insulator String sets(comprising 3 No. Discs in each string: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Bend Stapples & straight Stapples etc.) |
| 5 | Cross-Arm {Channel Iron (100x50x5 mm), Length 2400 mm} |
| 6 | Cross-Arm {Channel Iron (100x50x5 mm), Length 2800 mm} |
| 7 | Cross-Arm {Channel Iron (100x50x5 mm), Length 4000 mm} |
| 8 | 33 KV Stay Set complete I/Cc Stay Clamp |
| 9 | 11 KV HT Stay Set Complete I/c Stay Clamp |
| 10 | LT Stay Set complete I/c Stay Clamp |
| 11 | Shackle Insulator and D-Iron |
| 12 | Nuts & Bolts Off sizes (Galvanized coated ) (preferably 16 mm or more ( with flat and spring washer ) |
| 13 | RCC Muff with conc filling |
| 14 | Erection Part |
| 15 | 11 kV Disc Insulator Complete set including Dead end clamps, ball cleave eye socket etc. |
| 16 | 11 kV Pin Insulators ( porcelain, 12 kV, 10 kN): 3 No. Per pole structure |
| 17 | 33 kV Discs insulator String sets(comprising 3 No. Discs in each string: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Bend Stapples & straight Stapples etc.) |
| 18 | Cross-Arm {Channel Iron (100x50x6 mm), Length 2400 mm} |
| 19 | Cross-Arm {Channel Iron (100x50x6 mm), Length 2800 mm} |
| 20 | Cross-Arm {Channel Iron (100x50x6 mm), Length 4000 mm} |
| 21 | 33 kV Stay Set complete I/c Stay Clamp along with stay wire |
| 22 | 11 kV HT Stay Set Complete i/c stay clampalong with stay wire |
| 23 | LT Stay Set complete i/c stay clampalong with stay wire |
| 24 | Shackle Insulator and D-Iron |
| 25 | Nuts & Bolts Off sizes (Galvanized coated ) (preferably 16 mm or more ( with flat and spring washer ) |
| 26 | Erection of S/T pole 11 mtr long for (Double pole Structure ), a) Digging Of Pit, b) fxing of cross arm and A.I. bracing set earthingc)Fixing of Nuts & Boltscomplete in all respect. |
| 27 | Erection of S/T pole 11 mtr long for (Single pole Structure ), a) Digging Of Pit, b) fxing of cross arm and A.I. bracing set earthingc)Fixing of Nuts & Boltscomplete in all respect. |
| 28 | Erection ofS/T Pole 9 mtr longfor (Double pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate complete in all respect. |
| 29 | Erection ofS/T Pole 9 mtr longfor (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate complete in all respect |
| 30 | Erection ofS/T Pole 8 mtr longfor (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, complete in all respect. |
| 31 | Re-sagging of ACSR 6/1/3.35 & 6/1/2.59 mm²) Conductorincluding continous earth, stringing &Sagging andbinding with insulator complete in all respect. |
| 32 | Re saggingofGI Wire Guarding including earthing, as per requirement complete in all respect. |
| 33 | Re-erection of stay sets i/c digging of pit, ramming of pit, tightening & nozzeling of stay wire |
| 34 | Re-erection of tilted S/T Pole 9mtr long |
| 35 | Re-erection of tilted S/T Pole 8mtr long |
| 36 | Manual Carriage of ST Pole along with other line materials with Average Distance from Road to Site of Work |