| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc.Depth upto 1.5 m FOR PROTECTION WALL D/S OF TALAB |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stoneaggregate 40mm nominal size).FOR PROTECTION WALL D/S OF TALAB |
| 3 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) FOR PROTECTION WALL D/S OF TALAB |
| 4 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand) FOR PROTECTION WALL D/S OF TALAB |
| 5 | Providing weep holes in brick/ stone masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with following dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing face complete as per drawing, technical specifications and clause 2205 of MoRT&H Specification including all scaffolding, material, labour, machinery etc1 100 mm diaFOR PROTECTION WALL D/S OF TALAB |
| 6 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.FOR DPC OF PROTECTION WALL D/S OF TALAB |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete.FOR DPC OF PROTECTION WALL D/S OF TALAB |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) FOR DPC OF PROTECTION WALL D/S OF TALAB |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: FOR MAIN GATE AND RAILING OF WALL |
| 10 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work PROTECTION WALL D/S OF TALAB |