Tender For Reconstruction Of Vrb At Km 10.905 OF Kamai Minor. - Earth work in excavation of foundation in ordinary soili/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in chargeincluding cost of alllabour T&P etc. required for proper completion of work 2 Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed Byfor proper completion of work Engineer-in-charge 3 Laying of Cement Concretein M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40)including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work 4 Ist class Brick work in 1:4, Cement Coarse Sandmortar inwarpingincluding cost of allmaterial labour T&P etc. complete for proper completion of work 5 Struck Pointing in 1:2 Cement mortorincluding cost of all material, labour, T&P, Curing etc complete for proper completion of work 6 Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work 7 Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work 8 S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work 9 Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work. 10 Making cutting, bending, binding & placing in position ofsteel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work 11 Dismantling of Brick / Stone work in cement masonry work including all labour material and T&P etc and disposalof dismantled material within a distance of 60 m. 12 Providing and fixing of 75 mm Dia P.V.C. Pipeincluding cost of all material, labour, T&P etc for proper completion of work 13 Supplying and fixing of 1000 mm inner Dia NP-3 socket Hume Pipeincluding placing in position with cost of all material, labour, T&P etc for proper completion of work 14 Providing and Fixing of year Plate for proper completion of work 15 Providing and fixing of B.M Plate for proper completion of work 16 Supply and Fixing wheel Guard stone (Size 150mmx150mmx1500mm)for proper completion of work 17 Providing & Filling 20 mm thick expansion joint with bitumen & Sand i/c all cost of material, labour T&P etc. for proper comp. of work. 18 E/w in filling for making diversion, strenthening of banks, making approaches of VRB in ordinary soil in layers i/c cost of all labours T& P with ramming drassing required lead up to 200 meter and lift up to 1.50 meter. The earth from cutting or removing of diversion, to be used in making embankment or to be deposited is spoil bank within 30m distence as per directed by Engineer-in-charge, including cost of all labour and T&P etc. complete 19 Providing and laying of RBM below 80 mm thick paved block as granular base for making approaches of VRB in ordinary soil with ramming drassing required, or as per directed by Engineer-in-charge, including cost of all labour and T&P etc. complete 20 Providing and Laying 80mm thick cement concrete interlocking mechanically comprased paved block over 50 mm thick ordinary sand laid as cusion after preparing hard base of 150 mm thick river bed material including cost of all material, labour and T&P etc. complete required for proper complition of work. 21 Earth work in cutting or removing of diversion in ordinary soil including lead up to 30 meter and lift up to 1.50 meter including cost of all labour and T&P etc. complete 22 Supply and Fixing Sign Boardfor proper completion of work