| 1 | Cutting heavy under growth and bushes up to 7.5 cm diameter including removal of roots with collection and removal as directed by Engineer-in-charge. |
| 2 | Dismantling old dameged stone lining work in canal & stacking of stone as per direction of engineer in charge. |
| 3 | Dismantling old dameged khanda stone work in canal & stacking of stone as per direction of engineer in charge. |
| 4 | Dismantling old damaged cement concrete including disposal of refuseas per direction ofby Engineer-in-charge. |
| 5 | Earth work in MKR soil for making canal section & key drains for canal liningin all type of strata with all lead & lift including cost of allmaterial, labour, T&P, curiing, mechanical compaction etc required for proper completion of workas per direction of Engineer-in-charge. |
| 6 | Providing and laying cement concrete in 1:4:8 CM (1 Cement : 4 coarse sand : 8 graded stone aggregate 20 - 40 mm nominal size) in base Including all cost of material, labour, T&P, curing etc for proper completion of work. |
| 7 | P/L TMT Steel Reinrocment inincluding cutting, bending placing in position & binding with G.I. wire with its cost. |
| 8 | Providing and fixing centering & shuttering for RCC work including cost of all material, labour, T&P etc required for proper completion of work with it’s removal. |
| 9 | Providing & laying reinforcement cement concrete 1:2:4 with graded metarial of size 20 mm including cost of all material, labour, T&P etc required for proper completion of work. |
| 10 | Prepration of Subgrade. |
| 11 | Laying old flag stone lining upto 50 mm thick in cement mortar excluding pointing but including base cement plaster not less then 50 mm thick below flag stone in 1:3 CM, i/c all labour, material, T&P etc require for proper copletion of work as per dirction of Engineer-in-charge. |
| 12 | P/Laying flag stone lining upto 50 mm thick in cement mortar excluding pointing but including base cement plaster upto 50 mm thick below flagstone in 1:3 CM, i/c cost of all labour, material, T&P, curring etc require for proper copletion of work as per dirction of Engineer-in-charge. |
| 13 | P/L sand including cost of all material, labour, T&P etc required for proper completion of work. |
| 14 | Laying CC 1:2:4 CM (M-15) with graded metarial of size 20 mm include mixing & curing, all type of labour, T&P etc complete in all as per direction of Engineer-in-charge. |
| 15 | Ruled or flush pointing on flag stone lining with 1:03 CMincluding all cost of labour, material, T&P, curring etc required for proper completion of work. |
| 16 | Note- Rate to be quote exclusive of G.S.T. |