1. Nctps - Mi - Mpm - Unit - Ii - Mills 2A To 2F - Replacement / Rectification Of Severely Warped, Damaged And Worn Out Hot Air Duct At Mill End, Servicing Of Cold Air Gates & Dampers, Bunker And Feeder Gates And Dismantling, Inspection, Cleaning & Asse
Tender Overview
Project Description
1. Nctps - Mi - Mpm - Unit - Ii - Mills 2A To 2F - Replacement / Rectification Of Severely Warped, Damaged And Worn Out Hot Air Duct At Mill End, Servicing Of Cold Air Gates & Dampers, Bunker And Feeder Gates And Dismantling, Inspection, Cleaning & Assembling Of Dynavan Filter Of Seal Air System During Overhaul Of Unit Ii For The Year 2013. 2. Nctps - Mi - Mpm - Unit - Ii - Ventilation System - Overhauling Of Water Circulation System; Pump And Valves Of Air Washer, Cleaning The Accumulated Heavy Deposits Of Fine Dusts In Cooled Air Ducts Of 12Lld Air Washer Ventilation System In Unit Ii During Overhaul - 2013. 3. Nctps - Mi - Bm - Unit - Ii Boiler - Rectification Of Defective Coal Nozzles And Fixing Of Divider Plate Inside The Coal Nozzle During Overhaul 2013-14. 4. Nctps - Mi - Mpm - Ventilation System - Overhauling Of 12Lld Centrifugal Fans In 12Lld Air Washer Ventilation Systems In Unit Ii During O/H Of 2013. 5. Nctps - Mi - Mpm - Unit - Ii - Providing Necessary Scaffolding Arrangements, Cutting & Lowering The Damaged/ Worn Out Coal Pipes, Fixing The New Rolled Coal Pipes/ Released Rectified Coal Pipes And Replacement/ Rectification Of Worn Out Coal Pipes With Locating Holes Of Sleeve Couplings During Oh 2013. 6. Nctps - Mi - Bm - Unit Ii - Boiler - Metal Build Up For Less Eroded Boiler Tubes By Metal Powder Spray During Overhaul 2013-14. 7. Nctps - Mi - Bm - Unit Ii - Renewal Of Damaged And Worn Out Spring Seal Assemblies In Guillotine Gates By New One During Overhaul 2013-14. 8. Nctps - Mi - Ahp - O/H Of Unit - Ii For 2013 - 14 - Renewal Of Damaged Rubber Lining Inside The 350Nb & 300Nb Unit - Ii Ash Water Header & Over Haul Of Awp Suction And Discharge & Nr Valves. 9. Nctps - Mi - Mpm - Unit - Ii - Mills - 2A To 2F - Removal And Refixingofinsulationinexpansionbellow And Hot Air Ducts During Oh 2013. 10. Nctps - Mi - Mpm - Unit - Ii - Corners 1&2 - Overhauling Of Worn Out Fuel Inlet Elbows And Special Bends By Dismantling & Lowering To Boiler Floor; Rectification/ Renewal, Aligning And Assembling The New/ Rectified Fuel Inlet Elbows, Special Bends And Renewal/Rectification Of Line Orifices In Boiler Corners And Normalizing During Unit - Ii Overhauling For The Year 2013. 11. Nctps - Mi - Mpm - Unit - Ii - Corners 3 & 4 - Overhauling Of Worn Out Fuel Inlet Elbows And Special Bends By Dismantling & Lowering To Boiler Floor; Rectification/ Renewal, Aligning And Assembling The New/ Rectified Fuel Inlet Elbows, Special Bends And Renewal/Rectification Of Line Orifices In Boiler Corners And Normalizing During Unit - Ii Overhauling For The Year 2013. 12. Nctps - Mi - Mpm - Unit - Ii - Mills 2A & 2B - Dismantling And Lowering Of Mdvs, Mpos, Mill Outlet Elbows And Classifier Blades, Patch Welding In Worn Out Portion And Dismantling Of Centre Coal Feed Pipe Type I & Ii And Wornout Transfer Chutes, Refixing New/ Rectified Released Transfer Chutes & Centre Coal Feed Pipes Type I & Ii, Rectification/New Of Venturi Assembly & Insulation Cover Plate During Oh 2013. 13. Nctps - Mi - Mpm - Unit - Ii - Mills 2C & 2D - Dismantling And Lowering Of Mdvs, Mpos, Mill Outlet Elbows And Classifier Blades, Patch Welding In Worn Out Portion And Dismantling Of Centre Coal Feed Pipe Type I & Ii And Worn-Out Transfer Chutes, Re-Fixing New/ Rectified Released Transfer Chutes & Centre Coal Feed Pipes Type I & Ii, Rectification/New Of Venturi Assembly & Insulation Cover Plate During Oh 2013. 14. Nctps - Mi - Mpm - Unit - Ii - Mills 2E & 2F - Dismantling And Lowering Of Mdvs, Mpos, Mill Outlet Elbows And Classifier Blades, Patch Welding In Worn Out Portion And Dismantling Of Centre Coal Feed Pipe Type I & Ii And Wornout Transfer Chutes, Refixing New/ Rectified Released Transfer Chutes & Centre Coal Feed Pipes Type I & Ii, Rectification/New Of Venturi Assembly & Insulation Cover Plate During Oh 2013.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed