Tender For Fabrication jobs for season 2025-26- 1 Fabrication jobs 2 PIPELINES [M.S./ G.I.] Dismantling up to12 including bends, reducers, flanges etc. 3 PIPELINES [M.S./ G.I.] Erection up to 2 dia. 4 PIPELINES [M.S./ G.I.]- do- above 2 to 12 dia. 5 Dismantling,cleaning, burning & refitting of existing pipe lines of all sizes (for cleaning & modification purposes) 6 M.S Pipe line above 12 dia. Dismantling 7 M.S Pipe line above 12 dia. Fabrication 8 M.S Pipe line above 12 dia. Erection 9 Dismantling of flanges/ Blind for reuse 10 Refitting of old flanges/Blind[reuse] / new 11 Fabrication of flanges/Blind from M. S. Plate 12 Valves Dismantling & fitting up to 6 Size 13 Valves Dismantling & fittingfrom 7 to 12 Size 14 Valves Dismantling & fitting above 12 Size 15 Dismantling & fittingof MS fabricated right angle/ globe valve of size more than 12 size 16 Dismantling & fitting of C.I. pipe &accessories 17 Dismantling& fitting of S.S.Pipe & accessories. 18 Dismantling of MS bend, Tee, nipple, reducer above 12 19 Fabrication of MS bend, tee, nipple, reducer above 12 20 Erection of MS bend, tee, nipple, reducer above 12 21 Dismantling, Fab. & Erection of M.S./S.S. pipe accessories(tee,cone,cross,distance piece, nipple, reducer, bend) 22 Dismantling, Fab. & Erection of M.S. Plate jobs (tanks, gutters, chutes Pipe rolling, Boiler ducting etc.) 23 Dis./fab./erection of internal structure of wet scrubber. 24 Dismantling of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) 25 Fabrication of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) 26 Erection of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) 27 Repairing of old platform dismantling,fab.&erection 28 Dismantling, fab.& Erectionof railing 29 Patch work up to 4 sq. feet. 30 Patch work above 4 sq. ft. Welding work ( Two round ) 31 Fabrication and erection of condensate pit. 32 Dismantling, Fabrication and erection of Molasses conditional with coil and drive system. 33 Strengthening of Quad Bodies. 34 Dismantling, Fabrication and erection of Hopper. 35 Dismantling, erection and commissioning of Pan Condenser 36 Dismantling and erection of Air compressor’s Tank 37 Dismantling, fabrication & erection of Bagacillopipe from bagacillo to vacuum filter 38 Dismantling, fitting & hydraulic testing of S.S. Tubes (Semi-kestnner, juice heaters ) 39 Dismantling, fitting & hydraulic testing of S.S. Tubes (vapour cell & evaporator bodies) 40 Dismantling, fitting & hydraulic testing of S.S /Brass tubes ( pans ) 41 Dismantling, fabrication & erection of Pan and quad down take 42 Dismantling, fab. & erection of Pan and Quad calanderia jacket. 43 Dismantling of up to 4 pump & 15 HP motor. 44 Erection of up to 4 pump & 15 HP motor. 45 Dismantling of 4” to 8” pump & 15 to 40 H.P.Motor 46 Erection of 4” to 8” pump & 15 to 40 H.P.Motor 47 Dismantling of above 8” pump & above 40 H.P.Motor 48 Erection of above 8” pump & above 40 H.P.Motor 49 Dismantling, fabrication, erection of Sulphur furnace complete 50 Dismantling, fabrication, erection of Sulphur furnace melter/ receiver. 51 Dismantling, fabrication & erectionof Shell of Sulphur furnace 52 Dismantling, fabrication & erectionof scrubber of sulphur furnace 53 Dismantling , fabrication & erectionof steam jacket of sulphur furnace 54 Dismantling, fabrication, erection of Sulphur furnace cooler 55 Dismantling, Fabrication & erection of the Scrappers of Dorr clarifier with MS plates 56 Dismantling, Fabrication & erection of the Catcher bottle of Vac. Filter with MS plates 57 Dismantling, Fabrication & erection of the Bottom of Dorr clarifier with MS plates 58 Dismantling, Fabrication & erection of the Mud tank bottom of vac. Filter with MS plates 59 Dismantling, Fabrication & erection of the Conical portion of juice/ water/ mud tank with MS plates 60 Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Pans 61 Dismantling, Fabrication & erection of MS plates of Pan station - Pan tops 62 Dismantling, Fabrication & erection of MS plates of Pan station - Saveall 63 Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Vac. Crystallizer 64 Dismantling, Fabrication & erection of MS plates of Pan station Bottom plates of Syrup & molasses tanks & conditioners 65 Dismantling, Fabrication & erection of MS plates of Pan station Side plates of Syrup & molasses tanks & conditioners 66 Dismantling, Fabrication & erection of MS plates of Pan station Pan shell strengthening work with MS channels/ angles/ MS plate rings 67 Dismantling, Fabrication & erection of MS plates of Pan station Top cone strengthening work with MS channels/ angles/ MS plate rings 68 Dismantling, Fabrication & erection of MS plates of Pan station Strengthening of vapour line by inner side supporting of angles/ pipes 69 Dismantling, fab. & erection of coils of horizontal crystallizers 70 Dismantling of shaft of crystallizers 71 Fabrication of shaft of crystallizers 72 Erectionof shaft of crystallizers 73 Replacement of 3” MS coils (including bends, flange, etc.) of Vertical crystallizers 74 Dismantling, fab. & erection of arms of A- crystallizers 75 Replacement of coils of Dorr & evaporator bodies - Juice coils (Dismantling, Fab. & erection) 76 Replacement of coils of Dorr & evaporator bodies - Ammonia & gas coils (Dismantling, Fab. & erection) 77 Replacement of weak MS plates & cooling coils of Molasses tanks Bottom plates 78 Replacement of weak MS plates & cooling coils of Molasses tanks Side plates upto height 10mtr 79 Replacement of weak MS plates & cooling coils of Molasses tanks Top cone plates with supports 80 Replacement of weak MS plates & cooling coils of Molasses tanks Cooling coils 81 Dismantling, fabrication, erection of MS pipe coil fitting at various station 82 Fabrication of Drum internal plates of boiler 83 Dismantling, fabrication and erection of expansion joints of boiler 84 Dismantling of Existing transient Heaters 85 Shifting of new transient heater at Site 86 Erection of new/ existing transient heaters 87 Dismantling/ Fab./ Erection of weak portion of partition plates ofjuice heaters 88 Dismantling of spurgar of juice sulphitor for cleaning 89 Fabrication of spurgar of juice sulphitor for cleaning 90 Erection/refitting of spurgar of juice sulphitor for cleaning 91 Dis, fab & erection of stainer of injection pump/spray pump 92 Injection channel jail dismantling, fab. & erection. 93 Repairing of agitator of vaccum filter dismantling, fab. & erection. 94 Fabrication of sweeper trolly 95 Repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape. 96 ETP middle shaft repairing/ replacement 97 Fab of new lime tank with its shaft, stirer etc. at ETP 98 Dismantling, fab & erection of save all ofevaporator bodies 99 Replacement of juice sulphiter top 100 Dismantling of vibro screen 101 Erection of vibro screen 102 Repairing/ replacement of shell of sugar melter 103 Replacement of shaft of sugar melter 104 Replacemnet of arm of sugar melter 105 Stair case ( With chequared plate) - Dismentling 106 Stair case ( With chequared plate) - Fabrication 107 Stair case ( With chequared plate) - Erection 108 Juice heater cover dismantling, fab. & erection 109 Juice heater Refitting with testingby pump. 110 Sight glass fitting in condensate bottle of seed & juice heaters/ any vessel,by welding the sight glass. 111 New planatory gear boxes for B massecuite crystallizer. 112 F.D/ID/SA Fan old impeller is to be removed and new is to be fitted and trial. 113 Straightening of old pipe line of thickness 6-8mm into plain sheet by rolling machine 114 Pan No. 4 mechanical circulator is to be dismantled and parts to be shifted to Workshop. 115 Pan No. 4 mechanical circulagtoris to be dismantled and parts to be shifted to Workshop for machining.After machining the same circulator parts to be fitted and trial. 116 Rori melter is to be fabricated and erected as per drg. 117 Replacement of ID/FD/SA fan & casing. 118 SS condenser repairing by support to be given by rings. 119 Dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. 120 Juice heater header partition plate top & bottom both side - dismantling, fabrication, erection. 121 Oliver filter tray dismantling, fabrication, erection. 122 Centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam. 123 Dismantling, erection of SS tail pipe at pan & quad condenser. 124 Dismantling, fabrication, erection tail pipe support angle channel. 125 Dismantling, fabrication, erectionof complete Pug Mill for continuous machine B- massecuite. 126 Repairing of bottom portion of hot water tank replacement. 127 Dismantling, fabrication, erection of So2 gas coil/pipe at syrup sulphiter. 128 Dismantling of Condensate pit. 129 Dismantling, fabrication and erection of top and shell of Quad body. 130 Dismantling, fabrication and erection of Wt. juice tank. 131 Dismantling, fabrication and erection of Maceration water tank. 132 Dismantling, fabrication and erection of feed water tank. 133 Dismantling, fabrication and erection of wet scrubber. 134 Dismantling, fabrication and erection of boiler furnace. 135 Dismantling, fabrication and erection of any type of reduction gear box/ planetary gear boxwith bed & motor. 136 Dismantling, fabrication and erection of mud & juice kush kush and any type conveyor. 137 Dismantling, fabrication and erection of casing of any type of conveyor. 138 Dismantling, fabrication and erection of mud and juice boxes. 139 Dismantling and erection of double beat valves. 140 Unloading of Iron & steel, pipes. 141 Loading & Unloading of Oxygen cylinder. 142 Shifting, removing and lowering of any type of submersible pump with motor. 143 Dismantling, fabrication & erectionof Save all of any evaporator body. 144 Dismantling, fabrication & erectionof Top cone of any evaporator body. 145 Dismantling, fabrication & erection of bed for any pump/ motor/ fan/ gearbox etc. of any size. 146 Dismantling and shifting of 30 Ton Weigh Bridge near to Cane Weigh Bridge Cabin – 01 No. 147 To extend Span length, leveling and alignment work of Gross and tare cane weigh bridges – 02 Nos. 148 Fabrication, fitting of TUFR plumber blocks and cutting of head Stocks according as per first mill. 149 Sulphur Furnace, WHR tubes dismantling and fitting of both side covers. 150 Crystallizer bottom side patch work. 151 Magma Mixture broke shaft arm repairing. 152 Quad & Pan Condensate box. 153 Quad & Pan condensate bottle. 154 Juice sulphitor drum. 155 Juice sulphitor drive system with stirrer. 156 Vacuum filter baggacillo cyclone. 157 Door Telescopic valve. 158 Pan Vapour line catcher. 159 Syrup sulphitor Jali (inner side). 160 Repair/ replacement/strengthening of the weak portion internal and external on complete clarifier including flash tank, flocculation Chamber etc. up to satisfactory hydraulic testing.