|
| 1 | Cartage ofPole & material from store centrefrom any other place to the respective site of work through the Kachha Pacca road inclading the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. |
| 2 | 9/11 mtr. STP |
| 3 | 8.5 mtr. PCC Pole |
| 4 | Safe cartage of line material viz. conductor, AB/XLPE cable, Jointing Kit, 11 KV Fuse Set, GI earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 5 | 10/16/25/63 Transformer |
| 6 | Erection of Single support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 7 | Erection of Single support 9/11 ST Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 8 | Erectionof Double Pole support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 9 | Grouting of Double Polesas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 10 | Grouting of Single support PCC Poles as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 11 | Grouting of Single support 9/11 ST Polesas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Erection & Grouting of Stay set as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 13 | Fixing of Earthing rodas per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 14 | Fixing of T-off Channelas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 15 | Fixing of Top Channelas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 16 | Fixing of Dropper Channelas per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 17 | Installation of 10/16/25/63 kv Transformers |
| 18 | Laying & Sagging and Binding ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 19 | Laying, Sagging and Binding ABC 3x50/3x95/3x120 as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 20 | Digging hard and Rocky pits for Pole and Stay as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 21 | Laying of 11 kv XLPE cable 3x185/3x120/3x70 sq.mm XLPE cable as per ISS 1255/1983 of amendment there if by trench less Technology method by deep drilling system. The jop includes the cost of excavation of Earth, laying of cable inside it. The work is to be carried out as per Govt. approved Drg.. |
| 22 | Hosting of 11 kv cable on existing/erected support with provision of MS pipe 150mm dia 3 Mtr. Long suitable of 3x185/3x120/3x70 sq.mm cable fixing of proper support and its clamping, jumpering properly as per RESSPO Norms.(All material will be supplied by the contractor) |
| 23 | Installation of Heat Shrinkable type cable jointing kit O/D end Termination suitable for 11 kv XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version thereof if any. (Jointing kit supplied by Dept.) |
| 24 | Fabrication of Hardware materials |
| 25 | 11 KV Fuse Set Installation |
| 26 | Guarding of Road crossing & Line |
| 27 | Tree chopping |