}

Tender For Development And Construction Of Entry Gate, Exit Gate, Entry Exit Plazas And Krishna Leela Sculptures For Goverdhan Parikrama Marg (Goverdhan Corridor Project) At Poonchari Ka Lotha At District Deeg In The State Of Rajasthan - 1 Earth Work In, Jaipur-Rajasthan

Rajasthan Heritage Protecton And Promotion Authority has published Tender For Development And Construction Of Entry Gate, Exit Gate, Entry Exit Plazas And Krishna Leela Sculptures For Goverdhan Parikrama Marg (Goverdhan Corridor Project) At Poonchari Ka Lotha At District Deeg In The State Of Rajasthan - 1 Earth Work In. Submission Date for this Tender is 24-07-2025. Statue Tenders in Jaipur Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

49972081
Corrigendum : Tender For Development And Construction Of Entry Gate, Exit Gate, Entry Exit Plazas And Krishna Leela Sculptures For Goverdhan Parikrama Marg (Goverdhan Corridor Project) At Poonchari Ka Lotha At District Deeg In The State Of Rajasthan - 1 Earth Work In
Tender
Indian
Rajasthan
Jaipur
24-07-2025

Tender Documents

Tender Details

Tender For Development And Construction Of Entry Gate, Exit Gate, Entry Exit Plazas And Krishna Leela Sculptures For Goverdhan Parikrama Marg (Goverdhan Corridor Project) At Poonchari Ka Lotha At District Deeg In The State Of Rajasthan - 1 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils 2 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal ofexcavated earth, lead upto 50m andlift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil 3 Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including gettingout the excavated soil anddisposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available : Ordinary rock 4 Carriage of material like Earth, Sand, Lime, Morrum manure or sludge for lead up to 5.00 Km 5 Random rubble dry stone Kharanja under floor. 6 Supplying and Filling in plinth with river sand under floors including watering ramming consolidating and dressing complete including cost of sand 7 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stoneaggregate 20mm nominal size). 8 Providing and laying in position Ready mix concrete manufactured in fullyautomatic Batching Plant andtransported to site intransit mixer for having continous agitated mixer, manufactured as per approved mix design of specified grade of RCC work including pumping of R.M.C. from transit mixer to site of laying , exculding the cost of centering, shuttering and reinforcement with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. All works upto floor V floor M20 grade Design Mix by using cementas per codal provision. 9 Add extra for providing richer mixes respectively at all floor levels.Providing M-25 grade concrete by usingcement as per codal provision instead ofM-20 grade design mix. 10 Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:4 ( 1-Cement : 4-Sand). 11 Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings,strap beam, raft , bases of columns etc. 12 Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel propsand removal of formwork for upto floor five level for :Columns, pillars, posts and struts etc. 13 Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel propsand removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates,anchorblocks,sills,chhajjas,lintel,beam, plinth beam etc. 14 Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel propsand removal of formwork for upto floor five level for : Arches, domes, vaults etc. up to 6 Mtr span. 15 Providing ,arranging and erecting 50mm dia M.S. pipe cup lock shuttering arrangement above the ground level upto the height given below. The girding arrangement of cup lock system should have 2.50 meter 3.00 meter long coupling pipes and 0.90mt long lacer pipe (Horizontal bracing pipes)reconnected in both ways so as to make a square grid of size 0.90x0.90 meter in plan. The Horizontal bracing and lacer pipes should have a maximum spacing of 1.50 meter c/c both ways. The bottom of the coupling pipe must rest over a firm support at ground. the shuttering plates of 900mmx600mm size duly braced by angle supports and should rest over 50mmx50mm size wooden logs supported by 75x40x6mm size channels and U-Jacks made of M.S.25mm dia steel bars with adjustable thread and lock arrangement placed at a spacing of 0.60 meter c/c. The whole arrangement should be duly shored from ground by U-Jacks and lacer pipes to prevent any lateral movement during casting of slabs. Additional support as per direction of engineer in charge are also to by provided wherever felt necessary. The work would include transportation of material erecting the whole grid structure, bracing both way, shoring, leveling of shuttering and removal of form work complete as per direction of Engineer in charge for all the floors upto the height of:- Upto 9.14 meter height 16 Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. (Original producers who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) 17 Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in :Cement mortar 1 : 6 (1 cement : 6 coarse sand) 18 Plaster on new surface on wall in cement sand mortar 1:3 including racking of joints etc. complete fine finish :20mm thick 19 6 mm thick cement plaster to ceiling of mix1:3 (1cement : 3-fine sand) 20 Providing and applying white cement based puttyover plastered surface to prepare the surface even and smooth complete.New Plastered Surface (three or more coats) 21 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including all scaffolding: Two or more coats on new work including prepartion of base with primer, putty, lippy etc complete in all respect. 22 Supply of dry manure including loading unloading,transportation & stacking at site. Goat dungmanure. 23 Supply of Chemical Fertilizers at store in bags weighing not less than 50 kg each including loading unloading & transportation. D.A.P 24 Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc. Good soil of earth 25 Supply of insecticides & Pesticides at store in dust/liquid form complete. Methyl Prathion 2%

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 04-07-2025 Correction in BoQ BOQ 24-07-2025

Key Value

Document Fees
INR 5000 /-
EMD
INR 3126000.0 /-
Tender Value
INR 15.63 Crore /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail