Supply, Installation, Testing, And Commissioning Of Animatronic Item At Shraddhey Shri Atal Bihari Vajapyee Botanical Garden Visapur Dist. Chandrapur. =Supplying, installing, testing & commissioning of The Animatronic T-rex with the main 3D framework skeleton is made up of high-grade steel, as it will be the main strength of the animal to make it stand. Mainly, MS is used considering the strength. Anti rust treatment is done after the skeleton is completed. According to the required movements, adequate number of motors are fitted to the metal framework. The body skeleton is covered with the thick layer of high-density superior quality latex foam in layering process. Texturing and sculpting of skin textures is created. The outermost layer is made up of soft silicon latex material with a mixture of fire retardant compound, that increases the strength of the animal skin for all the weathers. All the motors are fitted within the skeleton bi-directional and synchronous with high threshold levels. Motors used for the different movements are of 80W to 600W with 24V DC supply, which include mouth open/close motor of 150w 24v, eye blink motor of 80w 24v, head left/right motor 150w 24v, neck 600w 24v, head 150w 24v, fore pass 80w 24v, body up/down 600w 24v, tail 150w 24v., 1) Welding modelling - The main 3D framework skeleton is made up of high grade steel, as it will be the main strength of the animal to make it stand. Mainly, MS is used considering the strength. Anti rust treatment is done after the skeleton is completed. According to the required movements, adequate number of motors are fitted to the metal framework. The structure of the artwork is movement type which is mouth open and close. Head left to Right, Body up and Down, Allowing Roaring Sound, Front arms ups and down. Th e entire sequence of the movements of the animals is skillfully programmed by our experienced programmer who also matches the sound in sync with the movements of animals. The final motion program is uploaded to the motion control unit which plays it whenever triggered. The control box multicore wire is provided which is 5 mtr. 2)high density foam (made up of collagen, CaCO3 SiO2), chemichal additives(Silicon, Silk fabric, Contact Adhesive, Oil painting pigment.Height of the Structure 7-8 mtr and Length 18-20 mtr. 3) LED Module: ARIHANTLED® SAMSUNG 3 LENS MODULE POWER :- 1.50W VIEW ANGLE :- 175 View Angle LUMINOUS :- 135 LUMI WORKING CURRENT:- DC 12 v, ARIHANTLED® CONSTANT CURRENT 4 LED MODULE POWER :- 3W VIEW ANGLE :- 175 View Angle LUMINOUS :- 316 LUMI WORKING CURRENT:- DC 12 v , ARIHANTLED® ULTRA GLOW MODULE POWER :-2.3W VIEW ANGLE :- 150 View Angle LUMINOUS :- 290 LUMI WORKING CURRENT:- DC 12 v , ARIESLED® 3 LENS POWER:-1.5W VIEW ANGLE :- 160 View Angle LUMINOUS :- 120 LUMI WORKING CURRENT:- DC 12 v LED LED COLOUR:- R/ G / B / Y. 4) The final painting and finishing is done with a special paints and shades as per the references. 5) Conduit Pipe, Accessories, Wire, MCB, etc: - Electric cable wire: mains of 1 sq.mm, 1.5 sq.mm, v, 2.5 sq.mm, & 4 sq.mm FR copper PVC insulated wire laying should be as per specification no. WG-MA/BW. MCB AC/DC: SP MCB 6A to 32A, C-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-MCB & As per working load requirement. Electric conduit pipe: HMS PVC conduit 25mm dia with necessary accessories as per specification no. WG-MA/CC. 6) Civil Foundation Design: - For art works which are higher than 2 height will be given the details of structure foundation consulting structural designer after the art work is ready. 7) Cost includes one-year comprehensive warranty and maintenance along with manpower. Warranty: On Site Comprehensive warranty of 5 yrs after DLP for the complete system. Note: If the Breakdown period is extended upto 5 days the warranty period will be extended the same number of days. If the breakdown period is extended for more than 5 days penalty of Rs 20,000/- per day will be imposed. Comprehensive Operation & Maintainance for the Period of 2 years post CommisioningProviding comprehensive operation and maintenance of The Animatronic T-rex for 2nd year which is including replacement of cloth if damaged due to Wear and tear with proper painting or required finishing with tinning rain cloth paste art spray colour treatment LED bulb interior lighting etc. Thus, scope shall be fully comprehensive to maintain its life and beauty to keep an it is. Also, operation scope shall be including of required manpower. Providing comprehensive operation and maintenance of The Animatronic T-rex for 3rd year which is including replacement of cloth if damaged due to Wear and tear with proper painting or required finishing with tinning rain cloth paste art spray colour treatment LED bulb interior lighting etc. Thus, scope shall be fully comprehensive to maintain its life and beauty to keep an it is. Also, operation scope shall be including of required manpower.