Tender For Giving Supply to Multipurpose Hall Arjunpur Khairabad, Sitapur,Giving Supply toHydrified Global Private Limited C/O Shubham Rajvanshi S/O Manoj Kumar Rajwanshi, Village Kudouli, Sitapur, Giving Supply toM/S Akshaypatra Uduog Private Limited C/o Mukesh Agarwal, Village Kuchlai, Sidhauli, Sitapur, Load Enhancement of Laiyapur Shantinagar Khairabad, Sitapur & Provide connection M/S Bharat Petrolim Corporation Ltd., C/o Swapnil Suresh Kakde, Sandna, Sitapur under full deposit scheme in the jurisdiction of EE, EDD-II, Sitapur - For Giving Supply to Multipurpose Hall Arjunpur Khairabad, Sitapur.The following works involves. 2 Supply of 11 Kv Cross Arm Clamp for 11 mtr STP 3 Supply of 11 Kv F Clamp for ST Pole 4 Supply of Stay Clamp 5 Supply of Top Channel 6 Supply of GI Pipe 6 Dia 7 Supply of Dropper channel 100x50 mm 8 Supply of Tee-off Channel 9 Carriage of ST Pole From ESC, Sitapur to Dump Site Sitapur 10 Carriage of ACSR Weaseal Conductor From ESC, Sitapur to Dump Site 11 Carriage ofHT XLPE Cable 11 KV 3x70 sqmm From ESC, Sitapur to Dump Site 12 Carriage of other Line Material From ESC, Sitapur to Dump Site 13 Shifting of ST PoleFromDump Site to work site 14 Shifting of ACSR Weaseal Conductor FromDump Site to work site 15 Shifting ofHT XLPE Cable 11 KV 3x70 sqmmFromDump Site to work site 16 Shifting of other Line Material FromDump Site to work site 17 Errection of ST Pole 18 Laying stringing and sagging of ACSR Weasel Conductor 19 Laying of XLPE Cable 11 KV 3x70 sqmm 20 Fabrication of Top, T-off, Dropper Channel etc 21 Fixing of stay 22 earthing of pole 23 Fixing/Making of XLPE Cable Box 11 KV 3x70 sqmm 24 Grouting of stay 25 Grouting of Pole 26 Hosting of GI Pipe 27 For Giving Supply toHydrified Global Private Limited C/O Shubham Rajvanshi S/O Manoj Kumar Rajwanshi, Village Kudouli, Sitapuer.The following works involves. 28 Supply of Stay Clamp 29 Supply of GI Pipe 6 Inch Dia for XLPE Xable 30 Supply of Tee-off Channel 31 Supply of Holding Clamp for round Pole 32 Supply for Holding Clamp forTop/Dropper 33 Supply of Top Channel 34 Supply of Dropper channel 100x50 mm 35 Carriage of ST Pole From ESC, Sitapur to Dump Site Sitapur 36 Carriage of ACSR Weaseal Conductor From ESC, Sitapur to Dump Site 37 Carriage ofHT XLPE Cable 11 KV 3x70 sqmm From ESC, Sitapur to Dump Site 38 Carriage of other Line Material From ESC, Sitapur to Dump Site 39 Shifting of ST PoleFromDump Site to work site 40 Shifting of ACSR Weaseal Conductor FromDump Site to work site 41 Shifting ofHT XLPE Cable 11 KV 3x70 sqmmFromDump Site to work site 42 Shifting of other Line Material FromDump Site to work site 43 Errection of ST Pole 44 Laying stringing and sagging of ACSR Weasel Conductor 45 Laying of XLPE Cable 11 KV 3x70 sqmm 46 Fabrication of Top, T-off, Dropper Channel etc 47 Fixing of stay 48 earthing of pole 49 Fixing/Making of XLPE Cable Box I/D/OD11 KV 3x70 sqmm 50 Grouting of stay 51 Grouting of Pole 52 Well Type Earhting 53 Hosting of GI Pipe 54 For Giving Supply toM/S Akshaypatra Uduog Private Limited C/o Mukesh Agarwal, Village Kuchlai, Sidhauli, Sitapur.The following works involves. 55 Supply of Dropper channel 100x50 mm 56 Supply of PG Clamp for Earthwire 57 Supply of 11 KV F Clamp For PCC Pole 58 Supply of 11 KV F Clamp For ST Pole 59 Supply for Holding Clamp forPCC Pole 60 Supply of Holding Clamp for Top/Droper 61 Supply of Tee-off Channel 62 Suppy of Holding clamp for Round Pole 63 Supply of Stay Clamp 64 Supply of Gim Pipe 6 Dia for XLPE Cable 65 Supply for stay Clamp for 11 mtr STP 66 Supply of Top Channel 67 Carriage of ST Pole From ESC, Sitapur to Dump Site Sitapur 68 Carriage of PCC Pole From ESC, Sitapur to Dump Site 69 Carriage of ACSR Weaseal Conductor From ESC, Sitapur to Dump Site 70 Carriage ofHT XLPE Cable 11 KV 3x70 sqmm From ESC, Sitapur to Dump Site 71 Carriage of other Line Material From ESC, Sitapur to Dump Site 72 Shifting of ST Pole FromDump Site to work site 73 Shifting of PCC Pole FromDump Site to work site 74 Shifting of ACSR Weaseal Conductor FromDump Site to work site 75 Shifting ofHT XLPE Cable 11 KV 3x70 sqmm FromDump Site to work site 76 Shifting of other Line Material FromDump Site to work site 77 Errection of ST Pole 78 Laying stringing and sagging of ACSR Weasel Conductor 79 Laying of XLPE Cable 11 KV 3x70 sqmm 80 Fabrication of Top, T-off, Dropper Channel etc 81 Fixing of stay 82 earthing of pole 83 Fixing/Making of XLPE Cable Box I/D/OD11 KV 3x70 sqmm 84 Erection of PCC Pole 85 Grouting of Stay 86 Grouting of PCC/ST Pole 87 Hosting of GI Pipe 88 Well Type Earhting 89 ForLoad Enhancement of Laiyapur Shantinagar Khairabad, Sitapur.The following works involves. 90 Supply of Holding Clamp for PCC Pole 91 Supply of Holding Clamp for round Pole 92 Supply of Holding Clamp for Top/Droper 93 Supply of LT Clamp for 8.5 mtr Pole 94 Supply of I Hook with Clamp 95 Supply of Stay Clamp 96 Suppy of F Clamp for PCC Pole 97 Carriage of PCC Pole From ESC, Sitapur to Dump Site 98 Carriaeg of ST pole From ESC, Sitapur to Dump Site 99 Carriaeg of ACSR Weseal Conductor From ESC, Sitaprur to Dump Site 100 Carriaeg ofAB Cable LT 3x120+1x95+1x16 sqmm From ESC, Sitapur to Dump Site 101 Carriaeg of 250 KV T/F From ESC Sitapur to Dump Site 102 Carriaeg of other Line material From ESC, Sitapur to Dump Site 103 Shifting of PCC Pole FromDump Site to work site 104 Shifting of ST pole FromDump Site to work site 105 Shifting of ACSR Weseal Conductor FromDump Site to work site 106 Shifting ofAB Cable LT 3x120+1x95+1x16 sqmm FromDump Site to work site 107 Shifting of 250 KV T/F FromDump Site to work site 108 Shifting of other Line Material FromDump Site to work site 109 Erection of Single PCC Pole 110 Erection of Double PCC Pole 111 Erection of ST Pole 112 Laying stringing and sagging of ACSR Weasel Conductor 113 Laying of AB Cable LT 3x120+1x95+1x16 sqmm 114 Fabrication of Top, T-off, Dropper Channel etc 115 Mounting of 250 KVA T/F on Plinth and energisation 116 Fixing of stay 117 Earthing of Pole 118 Grouting of stay 119 Grouting of Pole 120 Guarding of Pole 121 Safe Carriaeg of 63 KVA T/F From Work Site to ESC Sitapur/JE Store 122 For Provide connection M/S Bharat Petrolim Corporation Ltd., C/o Swapnil Suresh Kakde, Sandna, Sitapur.The following works involves. 123 Supply of Stay Clamp 124 Supply of Top Channel 125 Supply of Dropper channel 100x50 mm 126 Supply of T-off channel 127 Supply ofF Clamp 128 Supply of Clamp for Top/Dropper Channel 129 Supply of Suspenstion Clamp 130 Supply of LT Clamp 131 Supply of Dead End Clamp 132 Carriage of PCC Pole From ESC, Sitapur to Dump Site 133 Carriaeg of ST pole From ESC, Sitapur to Dump Site 134 Carriage of 25 KVA T/F From ESC, Sitapur to Dump Site 135 Carriaeg of ACSR Weseal Conductor From ESC, Sitaprur to Dump Site 136 Carriage of AB 3x50 sqmm From ESC, Sitapur to Dump Site 137 Carriaeg of other Line material From ESC, Sitapur to Dump Site 138 Shifitng of PCC Pole FromDump Site to work site 139 Shifitng of ST pole FromDump Site to work site 140 Shifitng of 25 KVA T/F FromDump Site to work site 141 Shifitng of ACSR Weseal Conductor FromDump Site to work site 142 Shifitng of AB 3x50 sqmm FromDump Site to work site 143 Shifitng of other Line material FromDump Site to work site 144 Erection of Single PCC Pole 145 Erection of Double PCC Pole 146 Erection of ST pole 147 Laying stringing and sagging of ACSR Weasel Conductor 148 Laying of AB Cable LT 3x50 sqmm 149 Mounting of 25 KVA T/F on Double Pole 150 Fabrication of Top, T-off, Dropper Channel etc 151 Fixing of stay 152 Earthing of Pole 153 Pipe Earthing 154 Grouting of stay 155 Grouting of Pole