| 1 | Mill House |
| 2 | Cutting of Cheveran Grooveson Mill Rollers |
| 3 | Cutting of pine apple grooves on Mill Rollers. |
| 4 | Replacement of weak/worn out Runners of cane carrier ,S.RC & IRC and cane unloader power supply angle |
| 5 | Welding of oval hole / enlarged holes of attachments of block type chain links and redrilling as per template/profile |
| 6 | Replacement of weak/ worn out attachment of block type chain links along with drilling as per template/profile and welding |
| 7 | Replacement of worn-out tail end boot of SRC& IRC |
| 8 | Fabrication and fitting of new juice rings for mill roller as per sample |
| 9 | Dismantling of worn out portion of square bar of long travel and cross travel there after grinding of base plate and fitting , leveling and alignment of new square bar of cane unloader |
| 10 | Welding on Wearout Mill and GRPF crown pinion teeth there after grinding of Teeth to make it as per profile |
| 11 | Dismantling ,Fabrication & erectionof weak/worn outMill Juice/ waterimbibitionsbox of compound imbibition system |
| 12 | Fabrication. & erection. of Mill rollerfeed & discharge bearing cover from 10 mm/ 8mm plate. |
| 13 | Fabrication & Erection of runner supporting box below runner at IRC, SRC & cane carrier, MBC and RBCand Bagasse elevator. |
| 14 | Replacement of worn out deflector plate and top plate of cane chopper/ cane leveler /Fibrizer by M.S. plate/ ss lining plates along with strengthening. |
| 15 | Dismantling ,fabrication & erection of worn out/ weak cane carrier chain side angle. |
| 16 | Dismantling ,fabrication & erection of return cane carrier chain supporting runner/chain guide. |
| 17 | Dismantling,Fabrication & Erection of worn out MS Plate of truck Tripler, SRC, IRC & cane carrier side plate. |
| 18 | Sprocket teeth repairing and strengthening with extra support of IRC/SRC/Elevator/MBC/RBC |
| 19 | Repair & hard facing of Auxiliary cane carrier Kicker /Pusher |
| 20 | Welding & Hard facing on wear out under feed roller teeth, Shell of roller and enlarging the length of roller as per standerd |
| 21 | Replacement of worn-out JuicePlate of screw conveyorat mill |
| 22 | Repair and hard facing on cane leveller/ chopper hubs |
| 23 | Lever bracket of underfeed roller scraper to be changed & to be fitted on as directed |
| 24 | Replacement and hard facing of worn out partition plate of anvil plate with 25 mm plate |
| 25 | Hot forging of enlarged / oval holes of cane carrier links to make them as per pre exhisting |
| 26 | Fabrication of 10” size Non return valve from M.S. Plate with fitting & leak proof trial. |
| 27 | Fabrication & erection of Rotary filter MS conical juice tank. |
| 28 | Repair of cane carrier slates such as worn-out side wear plates holes& other to be done |
| 29 | Fabrication & hard facing of under feed roller scrapper as per instructions to be done. |
| 30 | Welding on wear out teeth of cane carrier, S.R.C. & I.R.C. sprockets to bedone & teeth to be made as per profile |
| 31 | MS Ring to be fitted on worn-out both side of bagasse pusher at fibrizer& hard facing to be done on Square bars fitted |
| 32 | Welding of GRPF Scrapper teethto make them as per profile after hard facing and grinding |
| 33 | Repair & hard facing of cane UnloadedGrab Finger |
| 34 | Underfeed Roller pinion hard facing/welding |
| 35 | Repairing of MS Guard/ cover mill rollers crown pinion |
| 36 | Dismantling & fabrication of bagacillo screenas per instruction. |
| 37 | Dismantling of sprokets of SRC/IRC/Elevator etc. on drive/trail end shaft and fitting the same with successful trail |
| 38 | Rotary screen wornout support box replacement & accordingly strenthening its platform with successful trail |
| 39 | SS plates lining on the truff of IRC/ SRC and Mills\" Head Stock/GRPF Pressure Chute/Nose Plates/etc. |
| 40 | Fabrication & fitting of new fish plates of the GRPF pressure chute and also fitting/profile building of the bottom & top new/old scrappers of the same along with patching/linner of 5mm thick ss plate as per sample |
| 41 | Build up of oval/enlarged pin holes of links of block type chain and drilling of holes as per pitch or suitable to our pin |
| 42 | Patching/ repairing of weak/wornout portion of Cane Unloader No.2 cabinby new/old MS plate size 6mm plate along with proper strengthening |
| 43 | Fabrication & Erection of New SRC/IRC Racks as existing design |
| 44 | Repairing of old SRC/IRC racks |
| 45 | Repairing & hard facing of Fibrizer Hammers Shanks |
| 46 | Boiler House |
| 47 | Dismantling of C.I. feeding chute of 20 Ton Boiler & fitting of CI mouth-piece/ chute complete work |
| 48 | Dismantling fabrication & fitting of complete new casing of ID Fan with cone for Boiler (A) 20 ton boiler (B) 30 ton boiler |
| 49 | Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 40 ton boiler |
| 50 | Fabrication & erection of weak portion of runner supporting box below at old MBC/New MBC/Cross carrier/ bagasse elevator. |
| 51 | Replacement of worn out/weak portion of Bottom trough & side plate of Old or New Main Bagasse carrier/ Bagasse Elevator/ cross carriers/ RBC/IRC by old/ new MS plates |
| 52 | Replacement of worn-out ducting dampers of I.D./ FD Fan, economizer/airheater inlet and outlet dempers with levers and bushes |
| 53 | Replacement of worn-out/weak portion of ducting of flue gas at diffirent places with new/old MS plate |
| 54 | Fabrication & fitting of bagasse/ash chute for new & old boilers with new/old MS plate |
| 55 | Reparing of wet scrubber shell demister of the 20, 30 & 40 Tons Boilerby new/old MS Plate/Flat |
| 56 | Fabrication & fitting of bagasse sliding gate for diffirent bagasse Carriers |
| 57 | Fabrication & Erection of the bagasse cillo impeller with satisfactory trial as per old sample or as directed |
| 58 | Dismantling ofboiler side wall/front wall sealing plate, economizer casingfor replacement of boiler tubes. Dismantled old plates to be fitted with minor repair/patching after replacement of boiler tubes. |
| 59 | Replacement/reversing of weak/wornout runners of new MBC /old MBC /bagasse Elevator /Cross Carriers & RBC etc. |
| 60 | Repairing of wearout drive/non drive end sprocket teeth by welding and grinding to make profile as per template of all bagasse carrier chains etc. |
| 61 | Repair of wornout/ weak boiler FD/ID Fan casing along with successful trial by old/new MS plate |
| 62 | Replacement of worn out blower casing of boiler D.M.Plant |
| 63 | Replacement of worn out bagasse blower casing at bagasse elevator as per sample or as directed |
| 64 | Complete hardfacing of ID Fan Impeller of 20/30/40 Ton boilers |
| 65 | Dis., Fab. & Erection of New Boiler I.D. Fan Expantion Joint |
| 66 | Dis. Cleaning , Repair & fitting of 20,30 & 40 Ton Boilers internal fitting, |
| 67 | Replacement of worn out hanging roof and arch structure of Beam/channel Size- 4”/5” of Boiler No.1 & 2 ofFarnace and detrick arch |
| 68 | Fabrication of Bagasse Feeding Jantra of Tractor |
| 69 | Fabrication & fitting of worn out / weak bagasse chute at belt conveyor |
| 70 | Reparing of Grade Bars of30/40 Ton Boilers |
| 71 | Replacement of worn out teeth of bagasse feeder rotating drum of boiler no-3,4 & 5 with satisfactory trial |
| 72 | Dismantling, fabrication & erection of ID. Fan blade with Base Plate, Ribs and suction cone.(A) 20 Ton Boiler (B) 30 Ton Boiler |
| 73 | Dismantling, fabrication & erection of ID. Fan blade with Back Plate, Ribs and suction cone.(C) 40 Ton Boiler |
| 74 | Fabrication & fitting of worn out chain supporting guide of new MBC /old MBC /bagasse Elevator /Cross Carrier & RBC etc. |
| 75 | Fitting of new 8mm thick MS plate ring on base plate of boiler ID fan impeller for strengthening |
| 76 | Dismantling,fabrication and fitting ofworn out portionof old feed tank ofBoiler No.1,2& 3 |
| 77 | Replacement of worn out MS Beam and Channel arrangement Size- 4”/5” of Boiler No.1 & 2arch. |
| 78 | Dismantling,fabrication and fitting of safty valve worn out discharge assembly with proper support |
| 79 | Dismantling of 63.50mm OD X 2000mm long old weak/leaky air heater tubes of M/S LIPPI, make 40 TPH, Boiler no.- 04, Cleaning of tube plates, cleaning & fitting of tube plates holes, cutting as actual length of old tubes, Cleaning of outer surface of old tubes, fitting and erection of provided new/old tube, expanding of both ends of tubes in tube plates and finally leak proof testing of air heater. |
| 80 | Replacement of worn out MS Beam and Channel arrangement Size- 8\"/9\" for supporting side wall and roof tubes of Boiler No.4 & 5. |
| 81 | Fabrication & erection of new racks for New MBC |
| 82 | Fabrication & erectionof new racks for old MBC |
| 83 | Fabrication & erectionof new racks for 3rd cross carrier chain |
| 84 | Repairing weak portion of racks of all bagasse carrier chains |
| 85 | Evaporator & Clarification House |
| 86 | Dismantling, cleaning ,repairing & refitting work of catcher internal elements of new Semikestner (2300 m2) with leak proof trial |
| 87 | Dismantling, fabrication & erection work of Evaporator body/ Semikestner/vapour shell complete with saveall of uttam quad set. |
| 88 | Major repair of save all of the evaporator body/Semikastner /vapour shell along with leak proof water and vacuum trail |
| 89 | Dismantling, fabrication & erection ofweak/ worn out partition plate of top and bottom header of juice heater and repairing of rubber strip holding grooves along with fitting of both cover , leak proof water and vacuum trial |
| 90 | Dismantling, fabrication & erection work of the sulphur furnace melter/melt receiver along with hydraulic tested steam coil with all connections and satisfactory trial |
| 91 | Dismantling, Fabrication & erection of sulphur furnace secondry cooler with its cooling coil and complete connection of water and associated pipe lines with satisfactory trial |
| 92 | Repairing of sulphur furnace secondry cooler by replacing bunch of cooling pipe by providing all its exhisting connection |
| 93 | Dismantling, fabrication & erection of Juice receiving bottle fitted at vacuum filter station by providing all its exhisting connection |
| 94 | Dismantling, fabrication & erection of weak / leak condenser at vacuum filter. |
| 95 | Dismantling, fabrication & erection of Muddy juice receiving tank complete with all connection & associated pipe lines along with leak proof trial |
| 96 | Dismantling, fabrication & erection of mud tray of vacuum filter 10’ X 20’ vacuum filter along with satisfactory trial |
| 97 | Dismantling, fabrication & erection weak mud agitator of 10’ X 20’ vacuum filter along with satisfactory trial |
| 98 | Dismantling, fabrication & erection of weak juice box of juice heater along with fitting of double beat valve and leak proof trial. |
| 99 | Dismantling Fabrication & fitting of weak/worn out portion of bagacillo pipe with MS/GI plate size 18\" |
| 100 | Dismantling , fabrication & erection of weak/ worn out portion ofclear juice Liquidation box along with leak proof trial |
| 101 | Dismantling, fabrication & erection of weak/ worn out clarifier mud boot along with leak proof trial |
| 102 | Disamantling,Fabrication & Erectionweak shell of compartment no. 1 & 2 of Juice clarifier (Big) Work of New DORR Dia 28\" ,Capacity 3750 HL Body shell including completion of all connections & leak proof trial. |
| 103 | Disamantling,Fabrication & Erectionweak shell of compartment no. 1of Juice clarifier (Small) Work of New DORR Dia 24\" ,Capacity 2550 HL Body shell including completion of all connections & leak proof trial. |
| 104 | Disamantling,Fabrication & Erection of weak shell of juice sulphiter 320 HL including complition of all connection & leak proof trial |
| 105 | Dismantling, fabrication & erection ofJuice catcher for Raw/vacuum/sugar melter /sulphitedJuice pumpswith suction/ delivery connection |
| 106 | Repairing of Juice Heater Condensate Bottle /Evaporator/Syrup receiving Bottle with leak proof testing partition plate with all connection. |
| 107 | RepairingofSO2 furnace sublimation pipe with its leaking Tower etc. with testing |
| 108 | Dismantling, fabrication & erection of vacuum filter mud mixer body & fitting of screw conveyor with proper alignment & satisfactory trial. |
| 109 | Fabrication & erection of screw conveyor as per old sample for mud mixture from 6mm thick plate with satisfactory trial. |
| 110 | Dismantling, fabrication & fitting of new down take of quad / Old or New semikestner, etc. |
| 111 | Dismantling, fabrication and erection of weak/ leaky recovery tower of juice sulphiter/ Syrup Sulphiter. |
| 112 | Repairing of Umbrella and Providing essential supports of Quad & Pan. |
| 113 | Dismantling, fabrication & erection of worn out Umbrella of Quad & Pan with Old/New Plates. |
| 114 | Dismantling, fabrication & erection ofsaveall ofQuad old bodies |
| 115 | Dismantling, fabrication & erection ofsaveall ofQuad Uttam set. |
| 116 | Replacement of worn-outtop conical portion ofQuad & Vapour Shell with save all proper strengthening with associated machinery |
| 117 | Dismantling of worn out arms and shell (outside & inside) of juice sulphiter drum, fabrication & erection with satisfactory trial. |
| 118 | Dismantlingof worn out central drum & bed of juice sulphiter, fabrication & erection with satisfactory trial. |
| 119 | To replace worn out clear juice box / mud discharge box with valve of new door followed by satisfactory trial |
| 120 | Dismantling ofworn outjuice heater cover, fitting of new 12 mm thick MS plate by welding & bolting including repair of lever & erection of cover followed by satisfactory water trial. |
| 121 | Replacement of wornout mud scrapper plate & fitting of mud scrapper at Vacuum Filter. |
| 122 | Disamantling,Fabrication & Erection of worn out juice baffel plate of Dorr compartment. |
| 123 | Fabrication & erection of new sulphur furnace having burning capacity of 140kg/hr & burning area 01Sqm.as per old sample & fitted with of all connections. Complete in all respect with water & Gas Trial. |
| 124 | Major repair of lime slaker with proper alignment & trial |
| 125 | Dismantling, fabrication & erection of Weak/Leaky After burner/Primary cooler vessel for So2 furnace.Complete in all respect with leak Proof Trial. |
| 126 | To replace worn out sulphur furnace header of size 8”/10” between after burner & Cooler. |
| 127 | Dismantling, fabrication & erection of ammonia pipe inside new/old Evaporator bodies. |
| 128 | Replacement of worn-out Stirrer arms of clarifier completed with all support and squeezers etc. |
| 129 | Replacement of partition plate of old door Compartment/Intermediate tray with 5/6 mm MS plate |
| 130 | Replacement of leaky cooling coil of C twin vertical crystalizer, B mono vertical cryst. with 3\" size ms pipe with proper hydraulic testing and trial. |
| 131 | Dismantling, fabrication & erection of weak Portion Calandria shell of 700 Sqm. 5th Quad body of uttam set with leak proof water vacuum trial. |
| 132 | Repairing of B & C massecuite mono Cryst. Leakage coil with Hydraulic testing & successful trial. |
| 133 | Dismantling of existing 560 Sqm H.S. Area of Quad body first (Jagat Set Clandria ) Providing the Support for Stay the Shell above Calandria,Unloading of New Clandria from Vehicle by their resources shifting of new Calandria at the site. Fitting and Erection of Calandria at the Place of Old Clandria with Shell fitting of bottom cone of Calandria inlet Vapour/Exhaust steam Connection, water line connection and making all other connection to run the body complete in all respect. |
| 134 | Dismantling the existing Vapour Pipe between Uttam Quad Set Body No 2 & 3 along with Right angle valve correcting the size of vapour inlet nipple of body no 3 as per right angle valve, fitting of right angle valve on nipple of vapour entry to 3rd body and making the new provision of vapour pipe from out going vapour line of FFE to right angle valve along with leak proof trial. |
| 135 | Fabrication of New tank and fitting of vertical stirrer along with drive for melting of Brown sugar .Fabrication & fixing of new bed and fitting of pump & motor for lifting of melt along with all connections as directed and satisfactory trial of system. |
| 136 | Fabrication and fitting of M.S. structure and laying out & fixing of G.I. sheet for over head covering of moulding hearth complete in all respect. |
| 137 | Pan House |
| 138 | Repairing of down-take of Pan for 40/50 Ton Pan |
| 139 | Repairing of down-take of Pan for 60/80 Ton Pan |
| 140 | Replacement of worn out/broken angle arms of crystallizer & replacing of paddel type arms with ribbon type of air cooled/vaccume cryst. |
| 141 | Dismantling of Gutter of Molasses Magma & massecuite. |
| 142 | Fabrication & fitting of Gutter of Molasses, Magma & massecuite. |
| 143 | Repairing of hinge type cover of Gutter |
| 144 | Replacement of worn-out condensate box of pans, quad & juice heaters |
| 145 | Dismantling Fabrication & fitting of new umbrella in pans with supports & J pipes 40/50 Ton pan |
| 146 | Dismantling Fabrication & fitting of new umbrella in pans with supports & J pipes 60/80 Ton pan |
| 147 | Repairing of umbrella of Pans with supports & J pipes 40/50 Ton pan |
| 148 | Repairing of umbrella of Pans with supports & J pipes 60/80 Ton pan |
| 149 | Replacement of worn out distributor by new for 40/50 Ton Pan |
| 150 | Replacement of worn out distributor by new for 60/80 Ton Pan |
| 151 | Repair of wornout/ broken Arm/ Ribbon of air cooled, vacuum & seed crystallizer |
| 152 | Replacement of weak sight glass\"s flanges of Pan & Evaoparated Body along with leak proof water and vaccuum trial. |
| 153 | Dismantling , fabrication & erection of 40 Ton pan complete body shell along with save all, umbrella, feed header, top taper cone , distributor,man hole ,sight glass\"s flanges,all pipeline connections with 12/10mm MS plate with leak proof water and vaccuum trial. |
| 154 | Replacement of complete worn-out/ weaktop cone of 40/50 TonPan by new withsupports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial. |
| 155 | Replacement of complete worn-out/ weaktop cone of 60/80 TonPan by new withsupports and strengthening of associated machinery parts proper along with leak proof water and vacuum trial. |
| 156 | Strengthening of 40/60 Ton Pan body &Taper Portion with channel etc. |
| 157 | Replacement of worn out bushes of air cooled crystallizer of both side after dismantling all drive arrangement (worm wheel, reduction gear) and there after fitting ,alignment after replacement of bush (bush will be provided by factory) |
| 158 | Dismantling Fabrication & Erection of Box type feed header for each Pan with all related connections including valves, nipples,flanges etc. |
| 159 | Dismantling Fabrication & Erection of weak portion of pan shell with 12mm MS plate along with leak proof water & vacuum trial. Welding must be double coated from outside & inside. |
| 160 | Replacement of weak/wornoutside & bottom plate of cold/hot water over head tank, syrup tank & Molasses storage tanks at pan station by providing proper strengthening |
| 161 | Fabrication & erection of complete new down take of 40/50 ton pan along with leak proof water and vacuum trial |
| 162 | Fabrication & erection of complete new down take of 60/80 ton pan along with leak proof water and vacuum trial |
| 163 | Repairing of weak/worn out save-all of 40/50 Ton pan along with leak proof water and vacuum trial |
| 164 | Dismantling, fabrication and erection of pan save all with proper trial 40/50 Ton along with leak proof water and vacuum trial |
| 165 | Dismantling , fabrication & erection of 80 Ton pan complete body shell along with save all, umbrella, feed header, top taper cone , distributor,man hole ,sight glass\"s flanges,all pipeline connections with 16mm MS plate with leak proof water and vaccuum trial. |
| 166 | Dismantling, fabrication and erection of 60/80 Ton pan save all along with leak proof water and vacuum trial |
| 167 | Repairing of weak save-all of60/80 Ton pan along with leak proof water and vacuum trial |
| 168 | Repairing/patching of weak portion of roof of molasses tank no 1 & 2 |
| 169 | Dismantling,Fabrication & Erection of Wornout Portion of the Chute for Pan Discharge Valve with Satisfactory trial. |
| 170 | Repairing / patching of weak body shell of molasses conditioner along with alignment of reduction gear box and motor. |
| 171 | Disamntling,fabrication & fitting work of 80Ton Pan save all internals |
| 172 | Dismantling , fabrication & erection of 80 Ton pan partial weak body shell and complete top taper cone along with save all, umbrella, feed header , distributor,man hole ,sight glass\"s flanges,all pipeline connections with 16mm MS plate providing supports to associate machinary along with successful water & vaccuum trial. |
| 173 | Centrifugal House |
| 174 | To replace worn-out molasses Jacket of B & C Continuous Centrifugal Machine with proper Trial. |
| 175 | To Replace worn-out Molasses Casing of “A” Centrifugal Machine followed by satisfactory trial. |
| 176 | Replacement of worn out portion of horizontal sugar melter shell with steam & juice connection followed by leak proof trial. |
| 177 | Dismantling ofexisting stirrer shaft of magma mixture of B/C Continuous machine Straightening of worn out shaft, replacement of Bushes, re-fitting of shaft, arms and alignmrnt of drive system with satisfactory trial. |
| 178 | Replacement of weak/worn out portion of sugar hopper. |
| 179 | Broken Shaft of Cryst. to be made correct or replaced by new one.Alignment is to be done afterproper ftting of arms and ribbon . |
| 180 | Replacement ofworn-outbushes & Arms of Sugar Melter with satisfactoty trial. |
| 181 | Replacement of weak/leaky suction pipe of MF- 50X50/ 40X40 injection & spray pump as per old sample.Making and fitting of stone catcher.Fitting of Pipe with Pump. |
| 182 | Dis.,fab. & Erection of weak body shell of pugmill, melter & Magma Mixer of A, B & C FW/AF C/f Machines. |
| 183 | Dis. & Fitting work of bushes of melter, Magma mixer & sugar elevator. |
| 184 | Replacement ofworn- out/weak molasses ring along with Fingure of WK-1500 C/F machine complete in all respect. |
| 185 | Dis.,fab. & Erection of New. Fan ofE.T.P. aerator |
| 186 | Disamntling,fabrication & fitting work of structure including rubber scrapper drum of ETP clarification Pit. |
| 187 | Fabrication,Erection and Fitting work of Spray Pond mesh type inlet channel stainer Size-2.5mtx2.5mt |
| 188 | Disamantling,Reapiring & Re-fitting with leak proof trial of Collapsed SS Venturi of Pan no.10 Condensor. |
| 189 | Dismantling ,Fabrication & Erection of weak/wornout delivery Pipe of injection pump having one end reducer. |
| 190 | Disamantling,fabrication & fitting work of injection header Suction Pipe Mesh type Stainer. |
| 191 | Replacement of existing C.I. Sluice type Cutover Valve by Rubber seated right angle type valve. |
| 192 | Replacement of worn out channel after De-grouting & Re-fitting of A4/A5 side hopper no. 04new Channel,Clit insize 4\" X4\" fitting of wooden strip. |
| 193 | Replacement ofworn out/broken padestal arms of magma mixture & pug mill. |
| 194 | Replacement ofweak/wornout Perforated Sheet of hopper & fitting with frame |
| 195 | Dismantling Fabrication and erection of air diffuser for ETP from old boiler tubes |
| 196 | Replacement of worn-out bed/base plate of sugar exiter with proper strengthening of old grader. |
| 197 | Replacement of damaged /worn-out arms of mono crystillizer |
| 198 | Dis.,fab. & Erection of MS Coil of 1\" dia for WK-1500 & SC1350-KT C/F Machine with 3mm perforation. |
| 199 | Dis.,fab. & Erection of New Molasses storage tank(1.5mtr dia X 1.5mtr height) with 08mm MS Platefor A Centrifugal Machine and Providing with all connection,nipples etc. |
| 200 | Dismantling of existing Gate type masscuite taking valve 1250 Batch type machine & fitting of Pneumatic type Butterfly valve inplace of above & make in all necessary provision with satisfactory trial. |
| 201 | Dis.,fab. & Erection of wornout/weak Conical Discharge Chute for Contniuous machine with 06mm New/Old Plate (as per sample). |
| 202 | Dismantling of M/S Backawwolfmake SC-1350 KT continuous C/F Machine along with Motor,Panel,Base Plate & Other accessories & keeping the all dismantled equipment/accessories as directed. |
| 203 | Disamntling of M/S Balchand Nagar make WK-1500 \"C\" Fore Worker Machine No.1 including Machine,Motor,Panel & Other accessories.Shifting this machine at place of dismantled \"C\" after work Machine No.2 making the provision in structure to suite for fitting of this Machine.Fitting & Erection of this machine along with all related works like modification in structure,raising the height of Pug Mill if requird,Providing all connection along with satisfactory trial of the machine. |
| 204 | Unloading the New 1500 mm Basket Dia M/S Balchand Nagar/Thyssen Krupp make Continuous centrifugal Machine along with accessories from Vehicle and shifting of Machine all accessories at the site of installation making necessary alternation in existing structure as per suitabilty of new machine.Erection & Commissioning of new machine and accessories like Motor,Panel,Lubrication System etc.Making all Connection as per drawing or machine manual & satisfactory load trial of machine. |
| 205 | Dismantling Fabrication & fitting of man hole of vertical crystallizer |
| 206 | Dismantling of existing WIL make 1250Kg/charge capacity machine no 2 & 3 along with all accessories and motors & panel shifting and keeping of these machines and motors at directed place. Shifting and re-fitting of existing pug mill after shortening its length and suitable for one no 1250 Kg/charge machine. |
| 207 | Unloading of New 1750 Kg/charge machine along with all accessoriesie . motor , panel etc from vehicle. Strengthening the existing column 2 base structure of dismantled 1250 Kg/charge machine making essential modification in existing structure to suit the foundation of new machine ,Erection of new 1750 Kg/charge machine in all respect , fitting & commissioning of new/old pug mill as suitability to new machine, shifting & fixing of new drive control panel ,providing the all connection to new M/C as per drawing / manual and satisfactory commissioning of new machine in all respect. |
| 208 | Schedule Work Dismantling , fabrication & erection of MS pipe/ blind/flange/nipple/reducer/elbow/bend/tee etc upto 12\" dia |
| 209 | Dismantling of M.S. Pipe Line including bend/flange etc Upto 12” dia |
| 210 | Fabrication & Erection of M.S. Pipe Line upto 12” dia |
| 211 | Dismantling ,fabrication & Erection of Bend upto 12” dia (MS) |
| 212 | Dismantling ,fabrication & Erection of Nipple upto 12” dia (MS) |
| 213 | Dismantling ,fabrication & Erection of Cross upto 12” dia (MS) |
| 214 | Dismantling ,fabrication & Erection of Tee upto 12” dia (MS) |
| 215 | Dismantling ,fabrication & Erection of Flange upto 12” dia (MS) |
| 216 | Dismantling ,fabrication & Erection of Blind upto 12” dia (MS) |
| 217 | Dismantling ,fabrication & Erection of Reducer upto 12” dia (MS) |
| 218 | Dismantling ,fabrication & Erection of Elbow upto 12” dia (MS) |
| 219 | Dismantling , fabrication & erection of SS pipe/ blind/flange/nipple/reducer/elbow/bend/tee etc upto 12\" dia |
| 220 | Dismantling ,fabrication & Erection of Bend up to 12” dia (SS) |
| 221 | Dismantling ,fabrication & Erection of Nipple up to 12” dia (SS) |
| 222 | Dismantling ,fabrication & Erection of Cross up to 12” dia (SS) |
| 223 | Dismantling ,fabrication & Erection of Tee up to 12” dia (SS) |
| 224 | Dismantling ,fabrication & Erection of Flange up to 12” dia (SS) |
| 225 | Dismantling ,fabrication & Erection of Blind up to 12” dia (SS) |
| 226 | Dismantling ,fabrication & Erection of Reducer up to 12” dia (SS) |
| 227 | Dismantling ,fabrication & Erection of Elbow up to 12” dia (SS) |
| 228 | Dismantling & fitting of valve upto 12\" dia |
| 229 | Dismantling of valve up to 12” dia |
| 230 | Fitting of valve up to 12” dia |
| 231 | Dismantling fitting of valve above 12\" dia |
| 232 | Dismantling of valve above 12” dia |
| 233 | Fitting of valve above12” dia |
| 234 | Dismantling Fabrication & fitting of man hole |
| 235 | Dismantling , fabrication & erection of MS pipe/ blind/flange/nipple/reducer/elbow/bend/tee etc above 12\" dia |
| 236 | Dismantling ,fabrication & Erection of Bend above 12” dia |
| 237 | Dismantling ,fabrication & Erection of Nipple above 12” dia |
| 238 | Dismantling ,fabrication & Erection of Tee above 12” dia |
| 239 | Dismantling ,fabrication & Erection of Flange above 12” dia |
| 240 | Dismantling ,fabrication & Erection of Blind above 12” dia |
| 241 | Dismantling ,fabrication & Erection of Reducer above 12” dia |
| 242 | Dismantling ,fabrication & Erection of Elbow above 12” dia |
| 243 | Dismantling of M.S. Pipeabove 12 “ dia |
| 244 | Fabrication of M.S. Pipe above 12” dia |
| 245 | Erection of M.S. Pipe above 12” dia including bend flange & nipple etc. |
| 246 | Dismantling of old worn-out Platform |
| 247 | Fabrication & erection of platform by using old plate |
| 248 | Fabrication & erection of Cat/monkey Ladder |
| 249 | Fabrication & erection stair case |
| 250 | Fabrication & erection of railing from old Material |
| 251 | Fabrication & erection of railing from old Material |
| 252 | Fabrication & erection of T ring for strengthening of evaporator /Pan vapour Pipe |
| 253 | Dismantling ofS.S. Pipe Linewith bend & flange upto 12\" dia |
| 254 | Fitting of S.S. Pipe Line with bend & flange upto 12\" dia |
| 255 | Dismantling of MS heavy structure / Tank |
| 256 | Dismantling of MS Light structure |
| 257 | Fabrication & Erection Light structure |
| 258 | Fabrication & Erection heavy structure |
| 259 | Fabrication of Pump bed with Pump, Reduction gear & motor alignment up to 30 H.P. |
| 260 | Fabrication of pump bed with pump, reduction gear box & motor alignment above 30 HP |
| 261 | SS Plate lining in different size for various equipments. |
| 262 | Dismantling & cleaning of MS Pipe Line with bend, flange , nipple etc. |
| 263 | Fitting of MS pipe line with bend, flange ,nipple etc after cleaning |
| 264 | Fabrication & Erection ofcomplete Square / Rectangular /Round Tank with conical Bottom |
| 265 | Fabrication & fitting ofMS Coil (coils are to be duly bend and not offset pipe welding .Offset welds shall not be treated as coils but as pipes ) |
| 266 | Fabrication & fitting ofSS Coil |
| 267 | Welding work for various equipments in B/H |
| 268 | Dismantling , Fabrication & fitting ofnew Coneand umbrella anywhere in the factory. Cone up to 01 Mtr. Dia |
| 269 | Dismantling, Fabrication & fitting of new Coneand umbrella any where in the factory.Cone above 01 Mtr. Dia upto 2.5mtr dia. |
| 270 | Dismantling , Fabrication & fitting of new Coneand umbrella any where in the factory, Cone above 2.5 Mtr. Dia |
| 271 | Fabrication and Patchwork of equipmentsusing old/ NewMS plateby 6/8 mm thick plate overround vessels/any vessels |
| 272 | Dismantling ,Fabrication & erection of Carbon steel seamless steam Pipe A-106 Grade \"B\"Line including bend/flange etc size -219.1mm OD (8\" NB) |