Tender For Balance Work Of Providing Balance Metal Spreading In Transformer Bay , Supplying And Fixing Of Air Conditioner,Water Line Arrangement And Jungle Clearnce For Thekalivelam Patty 230 / 110 Kv Ss.; 1 Clearing Scrub Jungle clearing away from the siteas per the instruction of engineer at site 2 Earth work excavation in all soilsfor trench initial lead of 10mand lift of 2 m including all labour charges initial lead, lift, etc. complete. 3 Re filling with excavated earth includingmaterial cost , filling charges as per standard specification with all leads andliftsetc., complete. 4 Supplying and filling in gravel for foundation and basement includingmaterial cost , filling charges as per standard specification (watering & consolidation) with all leads andlifts as per standard specification, etc., complete. 5 Supplying and spreading 100 mm tk of 20 mm metal over crusher dustof 100 mm thick, including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification 6 Supplying and fixing of split Air Conditioner (3 phase -2 Ton capacity) 3 star rated of approved make (Dikin or equivalent) with all accessories including stabilizer( V guard)withreputed makeincluding cost of all materials, leads, lift, fixing charges,etc., complete as per standared specification complete. 7 Supplying and fixing 5/8copper tube for connecting AC panel to AC out door unitincludingcost of all materials, lead, lift, labour charge, etc., complete. 8 Providing opening forcable,AC duct / water pipe line etcin brick work in building including cost of machinaries labour etc completeas directed by dept engineer at site. 9 Supply and fixing of 25 Amps DP plug and socket in sheet enclosure with 25 A DP MCB in flush with wall with earth connection (For AC plug) [Legrand (MDS) / Hager (L&T) make]. 10 Supplying &Inserting 40mm dia HDPE hose pipe of make FLOWTEC or equivalent ISI make for suction inside the borewell with supporting clamp including cost of all materials, labour, lead & lift etc., complete as driected by the department engineer at site. 11 Supplying &Inserting 20mm dia HDPE hose pipe of make FLOWTEC or equivalent ISI make for suction inside the borewell with supporting clamp including cost of all materials, labour, lead & lift etc., complete as driected by the department engineer at site. 12 Supplying providing and fixing of 15 mm Dia GI pipe B class of a including cost of all materials, labour, lead & lift etc., complete as driected by the department engineer at site. 13 Supplying and erection of 7.50 HP air compresser 3 phase electrical motor of approved brand with all related accessories as per IsI in all respect includingcost ofall materilas lead and lift etc, complete as driected by the department engineer at site. 14 SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only 15 CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only 16 Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as 0 only