Work of 11 KV independent feeder for issuing 200 KVA new connection in village Santha of 33/11 KV S/s Kirawali Town under Jal Jeevan Mission on semi turnkey basis in Full deposit scheme under the area of Electricity Distribution Division, Kiraoli. - Part-A (Supply of Material)G.I. Pipe 6 Dia(Reputed Brand) 2 Barbed Wire 3 Aluminium Tape 4 F-Bracket 5 H.D.P.E. Pipe 6 Dia(Reputed Brand) 6 Earth Wire clamp with Nut & Bolt 7 Red oxide Paint (Reputed Brand) 8 Aluminium Paint(Reputed Brand) 9 Stone Pad 10 Bolt Nut & Washer 11 Part-B (Erection work)Cartiage of11 KV XLPE 3x185 sqmm & 11 KV XLPE 3x70sqmmfrom store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 12 Cartiage of 11 KV VCB BHEL MAKE 400/200/5A 800 Amp. O/D from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 13 Cartiage ofST Pole 11 Mtr from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 14 Cartiage ofST Pole 13 Mtr from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 15 Cartiage of11 KV CT-PT Pole Mounted Unit from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 16 Cartiage ofCable Jointing Kit 11 KV 3x185 sqmm O/D & cable Jointing Kit 3x70 sqmm I/D&O/D from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 17 Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Line material viz. Aerial bunch conductor/Weasal conductor/Dog/ Rabbit, G.I. wire, cross arm, angle, channel, insulators,11 KV Pilfer Proof Metering Cubicle, Dist. Box, clamps and other line material, if required in Estimate/Package. 18 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 11 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 19 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 11 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 20 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 13 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 21 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 13 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 22 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Four Pole 13 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 23 Laying sagging stringing and binding and jumperingofACSR Weasel Conductor at 11 KV/LT lineas per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 24 Laying sagging stringing and binding and jumperingofACSRDog Conductor at 11 KV/LT lineas per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 25 Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the costof arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 26 Fixing of earthing rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 27 Fixing ofP.G. Clamps as per RESPO norms 28 Fixing of Danger Boards With clmap with Nut & Bolt(shock Proof, Rust Proofs) on Poles as per RESPO norms. 29 Fixing of Number plates on Poles as per RESPO norms. 30 Filling of 11KV 3x185/3x70 sqmm Indoor/Outdoor Jointing Kit and making connection as per direction of supervising engineer. 31 Installation & Commissoning of 11 KV VCB BHEL MAKE 400/200/5A 800 Amp. O/Dproper alignment and direction and jointing of earthing strips with help of gas welding and making cable connection including shifting dragging with all other associated works. 32 Installation of 11 KV static TVM 3PH 4W as per respo norms and direction by supervising Engineer. 33 Chemical Earthing of 11 KV VCB as per RESPO Norms or Direction by supervising Engineer. 34 Fixing of Stone Pad as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 35 Fixing of Bolt Nut & Washer of various sizes as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 36 Laying of 11 KV 3x185 sqmm XLPE cable (Double Circuit i.e 800x2,150x2, 100x2, 100x2) Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level. 37 Rising of 11 KV 3x185 sqmm XLPE cable alongwith 6 Dia G.I. Pipe and overhead making loop includes unroling cutting / megaring & sealing both ends as per Norms. 38 Laying of 11 KV 3x70 sqmm XLPE cable overhead complete work as per RESPO Norms. 39 Road restoration (Pucca road) due to road surface erosion while Laying of 11 KV 3x185 sqmm XLPE cable including the cost of material and arrangment of labour, T&P as per site requirment. 40 Laying of 11 KV 3x185 sqmm XLPE cable (double circuit i.e. 60x2) in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. bricks in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESPO norms. 41 INSTALLATION OF 11 KV CT-PT Pole Mounted Unit as per respo norms and other sandries items as M-Seal, PVC Tap etc required for completion of work in all respect. 42 INSTALLATION OF 11 KV LIGHTENING ARRESTORS :-Assembling and installation / mounting of lightening arrestors on the L.A structure / Terminal Gentry complete with making earth connection (seprate) and line connection . The work includes providing & fabrication of 06 Nos. M.S Plates of size 300×450mm, 10 mm thick for placing lightening arrestors. 43 Guarding of HT/LT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. 44 Installation of 11 KV Pilfer Proof Metering Cubical & Making connection as per RESPO Norms or Direction by supervising Engineer.