| 1 | E/W in excavation in ordinary soil in foundation including all complete.(SOR-251) |
| 2 | P/L base conrete 1:4:8 with cement, c/sand & stone aggregate complete.(SOR-281) |
| 3 | Class-150 brick work in 1:4cement & coarse sand mortar in foundation and plinth including supply of all materials, labours,tools & plants etc. required for proper completion of work (S.I No.304) |
| 4 | Class-150 brick work in 1:4 cement & coarse sand mortar in super structure including supply of all materials, labours,tools & plants etc. required for proper completion of work (S.I No.305 a+309) |
| 5 | Class-150 brick work in 1:4 cement & coarse sand mortar in super structure including supply of all materials, labours,tools & plants etc. required for proper completion of work. (Half brick Wall) |
| 6 | Supply / fixing MS Door/Window frame with MS sheet shutter,grill,handle,L-drop,tower bolt etc including all material,labour t&p etc complete. |
| 7 | P/L of R.C.C. with cement approved coarse sand & stone aggregate in proportion of 1:1.5:3 in lighter beams ie; having span upto 6 mincluding supply of all materials, labours,tools & plants etc. required for proper completion of work. (SOR-285) |
| 8 | P/L of R.C.C. with cement approved coarse sand & stone aggregate in proportion of 1:2:4 in slabs including supply of all materials, labours,tools & plants etc. required for proper completion of work. (SOR-284) |
| 9 | M/S iron work for R.C.C. including all complete |
| 10 | 20 mm thick plaster in 1:2 cement & c/sand mortar with floating coat of neat cement finish including all material, labour, t&p complete. |
| 11 | 12 mm thick plaster in 1:4 cement & c/sand mortar including all material, labour, t&p complete. |
| 12 | Supply & filling of sand in plinth including all complete. |
| 13 | Supply & fixing 6 mm thick china white tiles laid over a layer ofcement mortar 1:4 cement & c/sand complete. |
| 14 | P/L Vitrified floor tiles 600x600 mm size & thickness to be specified laid over 20 mm thick layer ofcement mortar 1:4 cement & c/sand complete. |
| 15 | Providing and applying white cement based putty of average thickness of 1 mm approved brand and manufacturer over the plastered wall surface to prepare an even surface complete. |
| 16 | Finishing walls with Two coats of acrylic smooth paint of approved quality on treated surface to give an even shade including all complete. |
| 17 | Painting two coats over and including one coat of ready mixed priming coat including all materials, labour, T&P complete. |
| 18 | Providing & fixingP.V.C. Rain water pipe 110 mm dia including all complete. |
| 19 | Filling of brick bat ballast in soak pit |
| 20 | Sanitary and water supply work ( As per detail) |
| 21 | Boring work & Installation of Submersible pump |
| 22 | Electrical Work |
| 23 | S/F Informatory Board including all complete. |