Tender For Repair, Maintenance In Behror Town With Cc Pavement Work In Km. 166 On Alwar Behror Narnaul Road (Sh 14) - 1 PART-1 CC PAVEVEMENT WORK Dismantling of flexible pavements and disposal of dismantled materialsuptoaleadof1000metres,stackingserviceable and unserviceable materials separately as per MORTH By Mechanical Means :Bituminous courses 2 Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. Ordinary soil Upto 3 m depth 3 Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-I Material 4 For CC Work 5 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate. by manaul means 6 Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. 7 For CC Work 8 Construction ofun-reinforced , plain cement concrete pavement M-40 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cementas per Clause 602.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a in fullyautomatic Batching Plant andtransported to site intransit mixer for having continous agitated mixer, manufactured as per approved mix designincluding pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Slip Form Paver (laying and fixing of 125 micron thick polythene film) and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawingand MoRTH Specification Clause 602 should have minimum flexural strengthen of 4.5 MPa, including vaccum dewatering process with all required equipments. (Dowel Bars will be paid seprately). 9 Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. 10 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905.] 300 mm dia 11 Constructionofcementconcretekerbwithchannelwith top and bottomwidth 115 and 165 mmrespectively , 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M-20grade,slopedtowardsthekerb,kerbstonewith channel laid with kerb laying machine, foundation concrete laidmanually,allcompleteasperMORTHspecification Clause 408.Using Concrete Mixer