Fixing Of Rate Contract For Handling Of Various Material In Divisional Store Under The Jurisdiction Of Electric Division Vijaypur, Jpdcl, Jammu-1 Unloading of PCC Poles 11 Mtr Long 2 Unloading of PCC Poles 9 Mtr Long 3 Unloading of PCC Poles 8 Mtr Long 4 Unloading of ST Poles 13 Mtr Long 5 Unloading of ST Poles 11Mtr Long 6 Unloading of ST Poles 9 Mtr Long 7 Unloading of ST Poles 8 Mtr Long 8 Loading of PCC Poles 11 Mtr Long 9 Loading of PCC Poles 9 Mtr Long 10 Loading of PCC Poles 8 Mtr Long 11 Loading of ST Poles 13 Mtr Long 12 Loading of ST Poles 11Mtr Long 13 Loading of ST Poles 9 Mtr Long 14 Loading of ST Poles 8 Mtr Long 15 Dragging of ST Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking 16 Dragging of PCC Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking 17 Unloading of /New ACSR Conductor 18 Loading of Old/New ACSR Conductor 19 Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking 20 Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking 21 Unloading of 25 KVA Transformer(New/Write BackTransformer) 22 Unloading of 63 KVA Transformer(New/Write BackTransformer) 23 Unloading of 100 KVA Transformer(New/Write BackTransformer) 24 Unloading of 250 KVA Transformer(New/Write BackTransformer) 25 Unloading of 400 KVA Transformer(New/Write BackTransformer) 26 Unloading of 630 KVA Transformer(New/Write BackTransformer) 27 Loading of 25 KVA Transformer 28 Loading of 63 KVA Transformer 29 Loading of 100 KVA Transformer 30 Loading of 250 KVA Transformer 31 Loading of 400 KVA Transformer 32 Loading of 630 KVA Transformer 33 Dragging/Shifting of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 34 Dragging/Shifting of existing /New /Damaged 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 35 Dragging/Shifting of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly 36 Dragging/Shifting of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly 37 Dragging/Shifting of existing /New /Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 38 Dragging/Shifting of existing /New /Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 39 Unloading of Channel/Angle/Flat Iron 40 Loading of Channel/Angle/Flat Iron 41 Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 42 Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking 43 Unloading of Link/Knife/HG/DO/LA Set 44 Loading of Link/Knife/HG/DO/LA/GO Set 45 Unloading of CT/PT Unit 46 Loading of CT/PT Unit 47 Unloading of DPC Cu/Al. Wire 48 Unloading of Bush Rods and other allied workshop material 49 Unloading of allied material for HT/LT Line/Substations/workshop material (i.e. Disc/Disc fitting/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods Clamps, Nuts & Bolts, IPC etc) 50 Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Disc fitting/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods Clamps, Nuts & Bolts, IPC etc) 51 Shifting of allied material for HT/LT Line/Substations/workshop material (i.e. Disc/Disc fitting/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods Clamps, Nuts & Bolts, IPC etc)from unloading site to stacking site and stacking properly 52 Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Disc fitting/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods Clamps, Nuts & Bolts, IPC etc for making space for other store material 53 Unloading/Loading of Bamboo/Al. Ladder 54 Unloading/Loading of Single/Three Phase Meters 55 Unloading/loading of Twin Cable 1.1KV LT 4/10/16mmsq 56 Unloading /Loading of LED Bulbs 5/10/15/65Watts 57 Loading /Unloading of Flood Lights 50/100/120/150Watts 58 Unloading of PVC Cable single core 25/35/50/95/120/185mmsq 59 Unloading of PVC Cable single core /240/300/400/630mmsq 60 Loading of PVC Cable single core 25/35/50/95/120/185mmsq 61 Loading of PVC Cable single core 240/300/400/630mmsq 62 Unloading of PVC Cable 3.5 core 25/35/50/95/120/185mmsq 63 Unloading of PVC Cable 3.5 core /240/300/400/630mmsq 64 Loading of PVC Cable 3.5 core 25/35/50/95/120/185mmsq 65 Loading of PVC Cable 3.5 core 240/300/400/630mmsq 66 Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines 67 Unloading of AB/XLPE 120/150/185/240/300mmsq Cable for HT/LT Lines 68 Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines 69 Loading of AB/XLPE 120/150/185/240/300mmsq Cable for HT/LT Lines 70 Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly 71 Shifting of AB/XLPE120/150/185/240/300mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly 72 Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6 73 Loading of Aluminium and Copper wire 74 Loading of Bush Rods and other allied Workshop material 75 Unloading/Loading of Single phase/three phase meters 76 Stacking of Single/Three phase meters/Prodigy Meter/Meggers 77 Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes 78 Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6 79 Fabrication of fi ties ,fi clamps from MS flat (suitable for 9mtr,11 mtr and 13 mtr poles) 80 Fabrication of Earthing Plates , Cable duct cover from MS plate as per REC Standards 81 Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards 82 Fabrication of ST poles by way of drilling of extra holes 83 Fabrication of foundation bolts from MS tor steel including threading as per REC Standards 84 Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards 85 Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines 86 Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc 87 Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc 88 Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc 89 Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc. 90 Loading/Unloading of Chain Pulley Block 1/2/3/5MT 91 Loading /Unloading of PP/Manila Rope 92 Loading /Unloading of LT Spacers 93 Loading /Unloading of Earthing Plates 300x300x6.3mm 94 Loading /Unloading of Earthing material like Charcoal/Common Salt 95 Unloading of Cement Bags 96 Carriage of Cement Bags from unloading site to stacking site(Upto 50 Mtr) 97 Stacking of Cement bags 98 Loading of Cement Bags 99 Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents 100 Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store 101 Straightening of tilted fencing posts in the store premises for repair of fecning 102 Insertion of new fencing Posts in the store for repair of fencing 103 Dismantling of existing mesh fencing 104 Fixing of mesh Fencing 105 Fixiing of CGI Sheets 106 Dismantling of CGI sheets 107 Erection of PCC Fencing Posts /Angle Iron posts including Cement Bottoming 108 Fixing of barbed wire 109 Loading /Unloading of fault detector of underground cable 110 Unloading /Loading of Red Oxide/Al Paint 111 Unloading /loading of RCC Protection Cover of Size 300x300x60mm for under ground cabling 112 Unloading /Loading of 150mm dia GI pipe for road crossing 113 Unloading/Loading of Capacitor Bank of 30/75/100KVAR 114 Unloading /Loading of Safety Material (Safety Hamlets/Safety Belts/Gum Boots/Rain Coats etc) 115 Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA 116 Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA 117 Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking 118 Painting(Red oxide/Aluminium Paint) of Fabricated Material. 119 Unloading of old loose conductor and making bundles 120 Checking & maggering of 11KV, LA set , HG set , GO set & CT/PT unit 121 Loading of Transformer Oil 122 Unloading of Transformer Oil 123 Dragging of Transformer Oil Barrel from unloading site to Stacking site average distance upto 50 mtr.