Excavation of pit in soil (ordinary) to erect various supports and stay sets including stacking of excavated soil from the edgeof excavation (15% extra shall be payable for the designated desert area panchayat samities of Jodhpur Discom in pursuance to JdVVNL order No. 1240 dt. 18.07.13). , (A) Height of poles/R.S.Joist/M.S. Rail Size of pit , 8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep , (B) Lattice Tower /Size of pit , 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep , Excavation of pit in Hard soil (15% extra shall be payable for the designated desert area panchayat samities of Jodhpur Discom in pursuance to JdVVNL order No. 1240 dt. 18.07.13). , (B) Lattice Tower /Size of pit , 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep , Providing and laying cement concrete including compaction etc, complete using stone aggregate 40 mm nominal size (hand broken ) in foundation plinth excluding the cost of shuttering using 1 cement:5 sand:10 aggregate mix. , Note , The rates are all lead of cement,lime,ballast, sand,surkhi and grit etc.at site of work. , For all concrete work coarse sand shall be used no extrawill be paid . , Concrete mix prepared by power driven mechanical mixer shall be used . , Under exceptional coditions, where mechanical mixer and vibrator are not used(with the approval of Engineer Incharge reduced by 3% for mechanical mixer and 2% for Vibrator , Thickness of the cement concrete should not exceeed 100 mm. , Plaster on new surface on walls in cement ,sand mortar 1:6 including racking of joint etc. complete fine finsh 25 mm thick. , Note , The rates for complete work including racking of joints,curing,grinding,mixing and finishing T&P and scaffolding material and cost of material with all lead and lift. , The rates cover protection of all place and things,requiring protection and cleaing such places and thing of all droppings and splashes of mortar etc. , Cement concrete flooring grade 1:2:4 (1-cement :2- coarse sand :4-graded stone aggregate ) rounding off edges etc.but excluding cost of nosing of steps etc. complete. , 25 mm thick with 12.5 mm thick nominal size aggregate. , 75 mm thick with 20 mm thick nominal size aggregate. , Note , The rates for all items inculde all form of work, laying, curing and finishing etc. The rates are for complete work at site, inclusive of all leads. , The rates cover the preparation and cleaing of all places , Masonryfor foundation and plinth , Randon Rubble stone masonry for foundation and plinth in cement sand mortar 1:6(1 Cement : 6 Sand) including labour charges. , Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site , Within10 Kms. , Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.@4.61/Km , Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. , Within10 Kms. , Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.@5.57/Km , Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site. , Within10 Kms. , Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.@4.61/Km , Safe carriage of 11/.4 KV 3 Phase distribution transformer including loading/unloading from store to site (these Charges will be 1.5 times for both sides) , b)25 & 40 KVA , Within10 Kms. , Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.@6.78/Km , Safe Carriage of 33/11 KV Power Transformer , c)5.0 MVA , Within 10 Kms , Above 10 Kms & upto 30 Kms .Add for each Km or part thereof @50.81/Km , Safe carriage of breakers/kiosks etc. including loading/ unloading and stacking in Nigam stores , Within 10 KMs. , Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof@11.52/Km , Safe loading of steel fabricated / unfabricated conductor drum & other line material. , Safe unloading of steel fabricated/ unfabricated conductor drum & other line material. , Erection & fixing of steel struts in the excavated pit in position.The top end of the strut will be properly holed/welded with the main support muffed in cement concrete of ratio 1:3:6 as per item No.5.7.The nuts and bolts will be provided by the contractor as per Nigams specification for which payment will be made at the prevailing store issue rate.The cost of muffing and grouting will be paid extra. , R.S.Joists , Lattice Structure , Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. , (B)G.O. switch . without earthing blade. , 33kv G.O.switch , 11kv G.O.switch , Installation of lightening arrestors on erected structure /support (1 nos) including connection with earth by wire /strip as required and jumpering etc. The nuts & boltswill be supplied by the contractorfor which payment willbe madeas per prevailing Discom store issue rates, , (A)sub-station type , 33 KV L.A. each , Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractorforwhich payment will be made as perprevailing Discom store issue rates, , 25 and 40 KVA , Erection of LT Distribution / LT piller Boxes of 800/400/200/160/100 Amps. Capacity.Each 37"x24" base as per JVVNL standard including excavation,bricks,sand,cement masonary of size 4"x3"x10"and 3'' in ground and 1 1/2''above road level with muffing to support and mounting the piller .Themasonary will have 4" X 4" opening 2"below ground level two in the rear sideand one each in the remaining sidesto facilitate entry and exist ofincomingand outgoing PVC cable.Earthingof the piller shall be connected toDPearth with 7/10 SWG StayWire & lugs. , 100 AMP. , (C)Fixing of PG clamp of Panther Conductor , Erection of 11 KV RMU complete with accessorieson existing foundation including use of special tools & conducting all pre-commissioning test before energization,connecting the cables etc. complete in all respect with erection & grouting of structure (excluding civil works for which payment shall be made extra as per clause No. 2.6 of CLRC). The relays will be tested by Discom. , Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with onepcs.of M.S.rod 20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom) , Mesh earthing for 33/11 kv sub-station as per approved map &design usingMS flat 50X6mm/MS road 20mm dia includinglaying of flat/rod at the depth of 0.65 Mtrs.,welding & jointing at joints , structures & equipments etc.asunder: , Excavation of trench of 0.65 Mtrs.depth and 0.5 Mtr.width , Normal soil , Laying of MS flat /MS rod in 0.65Mtr.deep excavated trench and welding of MS flat/rod continuosly with 100 mm overlaping for straight joint including coating of MS flat joints with molten bitumen and covering joint with bitumen impregnated tape to protect from rust. , Shaping of MS flat for connecting the equipments with earthmesh .The work includes the welding of MS flat with equipments/structure and also with earth mesh.The work also includescoating of MS flat joint with molten bitumen and covering jointwith bitumen impregnated tape to protect from rust. , Preparation of spikes made of M.S Rod of 20 mm dia and 3 Mtr.length as per design and requirment to be driven in earth by mechanical means and Providing & .fastening of suitable clampswith the M.S. Rod, connection of earth wire/stay wire/MS flat in clamp depending on type of soil: , Where drilling is not required , Where drilling isrequired , Painting of exposed portion of MS flat/rod with two coats of red-oxide primer and two coats of green enamel paint.including material. , Pipe Earthing for Power Transformer at 33 / 11 KV S/S:-Supply & erection of earthing electrode shall consist of G.I. Pipe 100 mm,of 3 Mtr Length. The electrode shall be buried as far as practicable3 meters below ground level. Wherever possible, earth electrodes shall be located as near the water tap, water drain or near down take pipe. Earth electrodes shall not be installed in proximity to a metal fence. It shall be kept clear of the buildings foundations and in no case it shall be nearer than 2 meters from the outer face of the wall. The electrode shall be surrounded withlayer of charcoal dust and salt mixture through out the length. The 100 mm GI pipe shall be provided with holes of 12 mm dia. drilled at 75 mm interval upto 2.5 meters length from bottom. The top of the pipe shall be provided with a G.I. threaded cap for watering the earth through a pipe. AClamp with Pati of 12" of M.S. Flat of size 50X6 mm shall be fixed (Bolted) on the top edge of the pipewhich in turn shall be connected to Neutral / Body of the Power Transformer through M.S. Flat size 50X6 mm. The G.I. cap over the GI pipe shall be housed in a masonry chamber, approximately 300 mm x 300 mm x 300 mm deep. The masonry chamber shall be provided with a RCC inspection cover resting over a RCC frame, embedded in masonry. , Supply & Erection of Maintenance free Gel Earthing with Pipe in pipe / Pipe in strip technology filled with anti corrosive conductive compound ( CPRI Tested ) below the ground in 150 - 200 mm dia. earth pit & surrounding filled with required mineral filling compound ( MFC should have hygroscopic property to retain the moisture for long time to create low resistance zone ) and C.C. finished chamber covered withhinged type with locking arrangement C.I. Cover, C.I. Frame of size 300mm x 300mm complete testing of earth resistance as required. The value of Earth resistance shall be obtained 0.5 Ohm in individual earthing. G.I Pipe (IS: 1239 marks) GI pipe 3000 mm long, 80 I 40 mm, Terminal 12 mm GI Strip. Earthing as per 18:3043-1987 , Laying / stringing of bus bar with ACSR Dog & jumper connection using tie rod ,33KV /11KV insulator strings,required hardware,P.G.clamps/T clamps etc.as per requirement including Y-connections at bus bar jumpering point as per the direction of engineer in-charge. , ACSR DOG/RABBIT , Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization,filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom. , 33 KV VCB/SF-6 Breaker , 11 KV VCB (Indoor ) , Erection & commissioning of battery set and battery charger including all required connection/wiring from battery set to battery charger and A.C.mains complete in all respect. , 110 Volts D.C. , Laying, testing termination of control cable 1100 volts PVC insulated including supply and installation of ferrules to designate various cores of control cables by terminal Nos. of identification including utilization of cable gland. The control cable should be clearly arranged in trenches avoiding crossings including clamping of control cable at regular interval and providing identify tags. , 2x2.5 Sq.mm. , 12x2.5 Sq.mm. , Laying, connecting, testing and commissioning of 1100 Volt PVC cable at 33/11 KV Sub-Station including connections of leads cutting stripping of cable insulation providing compression type terminals fixing of cable glands crimping of lugs clamping of cable cores etc. complete in all respect as per requirement of Engineer Incharge. PVC cable size. , 3.5 Core 50 Sq.mm.to 95 Sq.mm. , Providing and fixing of G.I. Pipe B-Class (IS:1239 marks) at the starting and finishing point of 33& 11 KV under ground cables and to lay & clamp vertically with the existing support including labour charges. , Providing and fixing of G.I. Pipe of 150 mm diameter. B-Class (IS:1239 mark),at the starting and finishing point of 33 KV under ground cables and to lay & clamp vertically with the existing support including labour charges. , Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide) , On new surface , Painting with aluminium paint of approved brand and manufacturer to give an even surface.(includingcost aluminium paint) , On new works with two coats. , Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling and continunous welding joint as per design and drawing. , Other steel items , To Supply & Replace the damaged / defective parts of 33 KV G.O. switch(Proper shut down will be provided by Nigam). Rates are inclusive of material. , 33 KV G.O (800 Amps) , PG Clamp , Installation of cable termination / straight through joints on 11KV Aluminium conductor XLPE /PILCA Cable with outdoor/ indoor termination end and /or straight through joint including required excavation / remoral/ fixing / refixing/ testing etc. as required , A) (I) Outdoor end terminal3x35 Sq mm to 3x185 Sq mm , If the Cable Jointing Kits of HT , LT are not available with Nigam, then the unit officr will obtain NAC from ACOS & the contractor will supply the same as per latest SIR plus 10% (profit) of approved vendors (Amount With 10%) (3X185sqmm O/D Joint) Rate - 1032.68 Rs , (ii) 3x240 Sq mm to 3x400 Sq mm , If the Cable Jointing Kits of HT , LT are not available with Nigam, then the unit officr will obtain NAC from ACOS & the contractor will supply the same as per latest SIR plus 10% (profit) of approved vendors (Amount With 10%) (3X300sqmm O/D Joint) Rate - 1133.10 Rs , (I) Indoor end terminal 3x35 Sq mm to 3x185 Sq mm , If the Cable Jointing Kits of HT , LT are not available with Nigam, then the unit officr will obtain NAC from ACOS & the contractor will supply the same as per latest SIR plus 10% (profit) of approved vendors (Amount With 10%) (3X185sqmm I/D Joint) Rate - 910.55 Rs , (ii) 3x240 Sq mm to 3x400 Sq mm , If the Cable Jointing Kits of HT , LT are not available with Nigam, then the unit officr will obtain NAC from ACOS & the contractor will supply the same as per latest SIR plus 10% (profit) of approved vendors (Amount With 10%) (3X300sqmm I/D Joint) Rate - 1009.90 Rs , (I) Straight through joint 3x35 to 3x185 Sq mm , If the Cable Jointing Kits of HT , LT are not available with Nigam, then the unit officr will obtain NAC from ACOS & the contractor will supply the same as per latest SIR plus 10% (profit) of approved vendors (Amount With 10%) (3X185sqmm S/TJoint) Rate - 3108.89 Rs , Installation of 33 KV Cable (XLPE) termination / straight through joints ( Heat shrinkable type) as per manufacturer''s kit guidance and direction including preparation of cable and testing refilling etc as required.(Including crimping of lugs) , (I) Outdoor end terminal , (ii) 3x240 Sqmm to 3x400 Sq mm , If the Cable Jointing Kits of HT , LT are not available with Nigam, then the unit officr will obtain NAC from ACOS & the contractor will supply the same as per latest SIR plus 10% (profit) of approved vendors (Amount With 10%) (3X300sqmm O/D Joint) Rate - 3632.69 Rs , (I) Indoor end termination , (ii) 3x240 Sq mm to 3x400 Sq mm , If the Cable Jointing Kits of HT , LT are not available with Nigam, then the unit officr will obtain NAC from ACOS & the contractor will supply the same as per latest SIR plus 10% (profit) of approved vendors (Amount With 10%) (3X185sqmm I/D Joint) Rate - 3526.48 Rs , (i) Straight through joint 3x50 Sq mm to 3x185 Sq mm , (ii) 3x240 Sq mm to 3x400 Sq mm , If the Cable Jointing Kits of HT , LT are not available with Nigam, then the unit officr will obtain NAC from ACOS & the contractor will supply the same as per latest SIR plus 10% (profit) of approved vendors (Amount With 10%) (3X185sqmm S/T Joint) Rate - 10787.76 Rs , Laying of 33 KV & 11KV XLPE cable without Road cutting i.e. through burrowing machine "VERMIER".(120 cm deep).Use of this technology must be restricted to the situation like:- , (i) When the passages available for laying the proposed cable is totally a metal or cement concrete road. , (ii) When the road cutting is not permitted by the local administration. , A) 33/ 11 KV 3C x 300 Sq.mm cable , When cable laying through manual trench less (Bogie) , A) When the passages available for laying the proposed cable is totally a metal or cement concrete road. , B)When the road cutting is not permitted by the local administration. , (ii)33/11 KV below 3CX300 Sqmm. , For Extra loop (Ghera) to be provided near the pole on termination point and the length of cable along the pole for mounting of cable jointing kit , 11 KV Cable:- , 3x35 Sq mm to 3x185 Sq mm , 3x240 Sq mm to 3x400 Sq mm , 33 KV Cable:- , 3x240 Sq mm to 3x400 Sq mm , Craine with driver and P.O.L , 18 T , 12 T