| 1 | Capping Existing Hazardous Waste Stockpile |
| 2 | Supply and installation of 2mm HDPE double-side textured Geo-membrane |
| 3 | Supply and placement of soil cover over Geo-membrane |
| 4 | Vegetative cover over soil layer |
| 5 | Moving hazardous waste stockpile 6m inward |
| 6 | Capping New Stockpile Area |
| 7 | Demolition of concrete and iron structures |
| 8 | Segregation and recycling of demolished material |
| 9 | Supply and installation of 2mm HDPE double-side textured geo-membrane |
| 10 | Supply and placement of soil cover over geo-membrane |
| 11 | Vegetative cover over soil layer |
| 12 | Construction of drainage network |
| 13 | Excavation for storm water drainage |
| 14 | Construction of storm water drain with specified slope |
| 15 | Lining of drainage channels as per design |
| 16 | Construction of Collection Pond for Rainwater |
| 17 | Grading of Area 3 to native soil |
| 18 | Excavation of collection pond (100m x 50m x 3m) |
| 19 | Placement and compaction of 30cm thick soil layer |
| 20 | Installation of 2mm HDPE geo-membrane liner |
| 21 | Construction of overflow outlet |
| 22 | Construction of New Boundary Wall and Cut-off Trench |
| 23 | Construction of 8ft high boundary wall |
| 24 | Installation of 15ft-wide gate |
| 25 | Installation of 6ft-wide gate |
| 26 | Installation of metal spikes on top of the wall |
| 27 | Excavation and construction of 3m deep cut-off trench |
| 28 | Routing cut-off trench with storm water drainage |
| 29 | Installation of piezometric monitoring wells (4 wells) |
| 30 | Construction of a 2-meter wide paver block pathway from the south entrance to Area 1, with 1-meter width around Area 1 |