Drinking Water Supply and Sanitation Government Departments Closing in 20 days TDR #49892844

Providing Functional Household Tap Connection (Fhtc) And Rectification Work In Connection With Jal Jeevan Mission (Jjm) At Uttar Chandipur Zone-Ii Supply Scheme Under Manikchak Block Under Malda Division, Phe Dte. In The District Of Malda. (3Rd Call)

Issued by Government Departments · malda, West Bengal
Tender Value
98.75 Lakhs
Estimated cost
Bid Submission
17 Aug 2026
20 days left
EMD
1.97 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
malda → West Bengal
EMD Exemption
Available
Quantity
Not Available

Project Description

Providing Functional Household Tap Connection (Fhtc) And Rectification Work In Connection With Jal Jeevan Mission (Jjm) At Uttar Chandipur Zone-Ii Supply Scheme Under Manikchak Block Under Malda Division, Phe Dte. In The District Of Malda. (3Rd Call)

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 21-Jul-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Aug-2025
2 12-Aug-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Corrigendum_II Date 10-Sep-2025
3 11-Nov-2025 WBPHED/EE/MD/NIeT_22 (3rd Call ) of 2025-2026, Sl.No.02 Date 12-Dec-2025
4 10-Sep-2025 WBPHED/EE/MD/ NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Nov-2025
5 25-Feb-2026 WBPHED/EE/MD/NIeT _ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Mar-2026
6 15-Jan-2026 WBPHED/EE/MD/NIeT_ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Feb-2026
7 24-Mar-2026 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Corri_VIII_ Date 25-Apr-2026
8 11-Nov-2025 WBPHED/EE/MD/NIeT_22 (3rd Call ) of 2025-2026, Sl.No.02 Date 12-Dec-2025
9 10-Sep-2025 WBPHED/EE/MD/ NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Nov-2025
10 11-Dec-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025 -2026, Sl.No.02 Date 19-Jan-2026
11 21-Jul-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Aug-2025
12 12-Aug-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Corrigendum_II Date 10-Sep-2025
13 25-Feb-2026 WBPHED/EE/MD/NIeT _ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Mar-2026
14 15-Jan-2026 WBPHED/EE/MD/NIeT_ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Feb-2026
15 24-Apr-2026 WBPHED/EE/M D/NIeT_22 (3rd Call ) of 2025-2026, Sl.No.02 Date 25-May-2026
16 24-Mar-2026 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Corri_VIII_ Date 25-Apr-2026
17 15-Jan-2026 WBPHED/EE/MD/NIeT_ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Feb-2026
18 11-Dec-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025 -2026, Sl.No.02 Date 19-Jan-2026
19 25-Feb-2026 WBPHED/EE/MD/NIeT _ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Mar-2026
20 12-Aug-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Corrigendum_II Date 10-Sep-2025
21 21-Jul-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Aug-2025
22 11-Nov-2025 WBPHED/EE/MD/NIeT_22 (3rd Call ) of 2025-2026, Sl.No.02 Date 12-Dec-2025
23 10-Sep-2025 WBPHED/EE/MD/ NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Nov-2025
24 24-Apr-2026 WBPHED/EE/M D/NIeT_22 (3rd Call ) of 2025-2026, Sl.No.02 Date 25-May-2026
25 15-Jan-2026 WBPHED/EE/MD/NIeT_ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Feb-2026
26 10-Sep-2025 WBPHED/EE/MD/ NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Nov-2025
27 18-May-2026 W B PHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Jun-2026
28 24-Mar-2026 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Corri_VIII_ Date 25-Apr-2026
29 25-Feb-2026 WBPHED/EE/MD/NIeT _ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Mar-2026
30 11-Dec-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025 -2026, Sl.No.02 Date 19-Jan-2026
31 11-Nov-2025 WBPHED/EE/MD/NIeT_22 (3rd Call ) of 2025-2026, Sl.No.02 Date 12-Dec-2025
32 12-Aug-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Corrigendum_II Date 10-Sep-2025
33 21-Jul-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Aug-2025
34 23-Jun-2026 WBPHED/EE/MD/NIeT_22 (3rd Call) o f 2025-2026, Sl.No.02 Date 27-Jul-2026
35 18-May-2026 W B PHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Jun-2026
36 24-Apr-2026 WBPHED/EE/M D/NIeT_22 (3rd Call ) of 2025-2026, Sl.No.02 Date 25-May-2026
37 24-Mar-2026 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Corri_VIII_ Date 25-Apr-2026
38 11-Dec-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025 -2026, Sl.No.02 Date 19-Jan-2026
39 11-Nov-2025 WBPHED/EE/MD/NIeT_22 (3rd Call ) of 2025-2026, Sl.No.02 Date 12-Dec-2025
40 10-Sep-2025 WBPHED/EE/MD/ NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Nov-2025
41 12-Aug-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Corrigendum_II Date 10-Sep-2025
42 21-Jul-2025 WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 12-Aug-2025
43 25-Feb-2026 WBPHED/EE/MD/NIeT _ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Mar-2026
44 15-Jan-2026 WBPHED/EE/MD/NIeT_ 22 (3rd Call) of 2025-2026, Sl.No.02 Date 25-Feb-2026
45 23-Jun-2026 WBPHED/EE/MD/NIeT_22 (3rd Call) o f 2025-2026, Sl.No.02 Date 27-Jul-2026
46 24-Jul-2026 WBPHED/E E/MD/NIeT_22 (3rd Call) of 2025-2026, Sl.No.02 Date 17-Aug-2026

BOQ

Name of Work: Providing Functional Household Tap Connection (FHTC)& rectification work in connection with Jal Jeevan Mission (JJM) at UTTAR CHANDIPUR ZONE-II Supply Scheme under Manikchak Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Sl. No. Item Description
1Providing FHTC from the existing CI/DI/uPVC/HDPE/GI/AC distribution pipeline by Installing 10 mm NB Gun-metal Ferrule conforming to I5 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipeline, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16)/20mm OD PPR-C (Class-SDR7.4/PN16) pipes upto required length with all necessary specials 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer-in-charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of a 15mm dia.alloy iron Bib Cock (tested to 21 Kg/cm2) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm2) to be fitted in a position as directed by E.I.C. G.I pipe of TATA make (medium duly) of 2 metre length with all necessary specials to continue from the end of the PVC/HDPE/PPR-C pipe and upto 1.0 m above ground within the premises of household. Note:- 1. PVC pipe shall of Schedule 80 (medium duty) conforming to ASTMD -1785 and threaded to match with GI Pipes as per IS: 1239 (Part-1).2. PPR-C (Poly propylene Random copolymer) pipe shall be 3-layer confirming to IS:15801 UV stabilised & anti-microbial fusion welded, having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random/fittings. 3. Rate is exclusive of supply and delivery of 10mm NB gun-metal Ferrule.Supply & laying of 15 mm NB PVC (schedule 80/20mm OD HDPE (PE100, PN16)/20mm OD PPR-C (Class-SDR7.4/PN16) pipes.
2a) Upto 10m length.
3b) Above 10m upto 20m length
4Collection of house hold details at PRESCRIBED FORMAT THROUGH Mobile App and hard copy including Geo-reference as directed by E.I.C and submission of the same to P.H.E dte in soft copy.
5Provision for extra supply and laying of 15 mm NB PVC schedule 80)/20 mm OD HDPE (PE 100, PN 16) pipe with all necessary specials 1.00 meter bellow the ground level including cutting trenches in all sorts of soil and filling up trenches as per direction of the E.I.C., beyond 15 mtr length as consider in item No.43
6Making plain Cement concrete (Mix - 1:2:4) with graded stone chips (20mm niminal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS codes. (0.60 m bellow GL and 0.30 m above GL) for fixing 15 mm dia GI pipe for FHTC or as per direction of E.I.C . (Pakur Variety)
7Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.
8(a) upto 150 mm. thick
9Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
10(a) In ground floor including roof.
11Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety.
12Making Village Road (Avg. 3M width) crossing by Horizontal auger borng for accomodation of laying of avarage 3(three) nos. 15 mm dia pipes for FHTC or as per direction of Engineer-In-Charge.
13Emergency Horizontal road crossing by Augor-boring including boring charge, pipe laying and jointing, making baricates, lighting arrangement etc. all complete as per direction of E.I.C. For 80 mm dia. to 200 mm dia. pipes.
14Hire and labour charges for shuttering with centering and necessery staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and stricking out after completion of works (upto roof of ground floor) a) 25mm to 30mm thick wooden shutering as per deceision & direction of engineer-in-charge
15Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (a) 15 mm thick plaster with cm (1:4).
16Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
17Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)A) For Exposed Work
18(i) 15 mm dia. medium quality
19Rectification or repairing of existing FHTC connection from C.I./D.I./UPVC/HDPE/G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m) carefully without damaging the existing distribution pipe line, (in case of damaged if any pipe line during eexecution, necessary damaged should be repairing by the agency in his own cost) removing carefully old damage / good condition saddle piece, brass/gunmetal and refitting saddle pice and ferrul and all accessories, after connection work filling the trenches by earth all labour work are complete (Excluding all necessary Materials) as per direction of EIC.
20Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C.
21N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line.ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list.iii)No part payment at any stage on account of supply of materials shall be entertained.iv)Payment will be made on actual consumption of materials.v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list.vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so.vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item.viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill.
22(A) Pressure Rating : Class - III(ii) Laying of pipe line including cost of pipe & fittings /specials but excluding cost of valves.
23a) 90 mm (OD)
24Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source).
25a) 90 mm (OD)
26Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source).
27a) 90 mm (OD)
28Add GST 18.00 %
29Add Labour Welfair Cess 1%

AI Tender Summary

OUR REF NO 49892844
AUTHORITY Government Departments
TENDER VALUE 98.75 Lakhs
LAST DATE 17-08-2026
Authority
Authority Name Public Health Engineering Department
Work Description Providing Functional Household Tap Connection (Fhtc) And Rectification Work In Connection With Jal Jeevan Mission (Jjm) At Uttar Chandipur Zone-Ii Supply Scheme Under Manikchak Block Under Malda Division, Phe Dte. In The District Of Malda. (3Rd Call)
Basic Detail
Tender No WBPHED/EE/MD/NIeT_22 (3rd Call) of 2025-2026
Bidding Type Tender
Location
City malda
State West Bengal
Key Dates
Publish Date 24 Jul 2026
Submission Date 17 Aug 2026
Open Date 19 Aug 2026
Finance
Tender Value 98.75 Lakhs
Tender Fee Ref. Documents
EMD 1.97 Lakhs
Exemption Available
Document List
896d93a1-63e1-4f93-875c-5332d1f011f4.html
BOQ_1951152.xls
Tendernotice_1.pdf
Tendernotice_4.pdf
Tendernotice_2.pdf
Tendernotice_3.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 24, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 12, 2025
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 10, 2025
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 12, 2025
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 12, 2025
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2026
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 25, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 12, 2025
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 12, 2025
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 19, 2026
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 12, 2025
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 10, 2025
18:00 IST

Corrigendum-12 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-13 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2026
18:00 IST

Corrigendum-14 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 25, 2026
18:00 IST

Corrigendum-15 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 25, 2026
18:00 IST

Corrigendum-16 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2026
18:00 IST

Corrigendum-17 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 19, 2026
18:00 IST

Corrigendum-18 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-19 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 10, 2025
18:00 IST

Corrigendum-20 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 12, 2025
18:00 IST

Corrigendum-21 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 12, 2025
18:00 IST

Corrigendum-22 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 12, 2025
18:00 IST

Corrigendum-23 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 25, 2026
18:00 IST

Corrigendum-24 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2026
18:00 IST

Corrigendum-25 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 12, 2025
18:00 IST

Corrigendum-26 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 25, 2026
18:00 IST

Corrigendum-27 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 25, 2026
18:00 IST

Corrigendum-28 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-29 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 19, 2026
18:00 IST

Corrigendum-30 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 12, 2025
18:00 IST

Corrigendum-31 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 10, 2025
18:00 IST

Corrigendum-32 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 12, 2025
18:00 IST

Corrigendum-33 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 27, 2026
18:00 IST

Corrigendum-34 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 25, 2026
18:00 IST

Corrigendum-35 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 25, 2026
18:00 IST

Corrigendum-36 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 25, 2026
18:00 IST

Corrigendum-37 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 19, 2026
18:00 IST

Corrigendum-38 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 12, 2025
18:00 IST

Corrigendum-39 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 12, 2025
18:00 IST

Corrigendum-40 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 10, 2025
18:00 IST

Corrigendum-41 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 12, 2025
18:00 IST

Corrigendum-42 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-43 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 25, 2026
18:00 IST

Corrigendum-44 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 27, 2026
18:00 IST

Corrigendum-45 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 17, 2026
18:00 IST

Corrigendum-46 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 20 days
Aug 17, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Aug 19, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 22 days

Tender Documents

Download All (ZIP) ↓
html

896d93a1-63e1-4f93-875c-5332d1f011f4.html

xls

BOQ_1951152.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_4.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders