| 1 | Electrical Items : |
| 2 | Holding Clamp J-I hook for AB cable |
| 3 | STAY CLAMP FOR SP-23 WITH NUT & BOLT |
| 4 | STAY CLAMP FOR SP-10 WITH NUT & BOLT |
| 5 | EARTHWIRE CLAMPFOR SP-23 WITHN/B |
| 6 | DEAD END CLAMPS WITH I HOOK AND N/B INS |
| 7 | PP & CLAMP WITH N&B ST POLE SP-23 |
| 8 | Susp. Clamp With I Hook (Ins.),Clamp,N&B |
| 9 | BRACING CLAMP TOP FOR SP-23 WITHN/B |
| 10 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B |
| 11 | LT DistributionBox 3Phase 4Wire |
| 12 | Piercing Connector 35 Sq.mm-35Sq.mm |
| 13 | LT XLPE Cable 1x35 sqmm |
| 14 | LT AB Cable 3x35+1x25 sqmm |
| 15 | LT XLPEAB CABLE 1CX16+25 SQ.MM. |
| 16 | LT DISTRIBUTION BOX 1 PHASE |
| 17 | AL CRIMPING TYPE LUGS 25 SQ.mm |
| 18 | SERVICES (LABOUR) |
| 19 | ERECTION OF EARTHING ROD |
| 20 | FABRICATION OF STEEL |
| 21 | EXCAVATION OF PIT FOR STAY SET |
| 22 | ERECTION OF LT STAY SET |
| 23 | ERECTION OF 11 KV STAY SET |
| 24 | GROUTING OF STAY SET |
| 25 | EXCAVATION OF PIT FOR POLE |
| 26 | ERECTION OF SINGLE SP-10 POLE |
| 27 | ERECTION OF SINGLE SP-23 POLE |
| 28 | ERECTION OF SP-23 DOUBLE POLE |
| 29 | GROUTING OF POLE |
| 30 | MUFFING OF POLE |
| 31 | DISMANTLING OF 11 KV LINE(RABBIT) |
| 32 | DISMANTLING OF LT LINE 1 P 2 W(WEASEL) |
| 33 | DISMANTLING OF 16 KVA DTR |
| 34 | INST. OF 25 KVA DTR ON POLE STRUCTURE |
| 35 | LAYING OF RABBIT CONDUCTOR IN HT LINE |
| 36 | LOPPING & CHOPPINGOF TREE BRANCHES |
| 37 | CARTAGESP-10 POLE, 100-150KM |
| 38 | CARTAGESP-21/23 POLE, 100-150KM |
| 39 | CARTAGE OF PETTY MATERIAL,100-150KM |
| 40 | CARTAGE OF 16/25 KVA DTR, 100-150KM |
| 41 | CARTAGE OF 16/25 KVA DTR, 150-200KM |
| 42 | HEADLOAD CARTAGESP-10 POLE(0-1 KM) |
| 43 | HEADLOAD CARTAGESP-10 POLE(1-3 KM) |
| 44 | HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM) |
| 45 | HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM) |
| 46 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 47 | HEADLOAD CARTAGE OF MATERIAL(1-3 KM) |
| 48 | HEADLOAD CARTAGE OF 16 KVA DTR(0-1 KM) |
| 49 | HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM) |
| 50 | DISCONNECTION & RECONNECTIONOF CONsumer |
| 51 | LAYING OF LT AB CABLE 3X35+1X25 SQMM |
| 52 | Installation of LT DB 1 Ph for LT AB |
| 53 | Installation of LT DB 3 Ph for LT AB Cab |
| 54 | Laying of AB Cable 1x16+25 mm |
| 55 | BACK CARTAGE OF PETTY MATERIAL,150-200KM |
| 56 | Laying and fixing of 1x35sqmm XLPE Cable |
| 57 | BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM |
| 58 | BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM |
| 59 | DISMANTLING OF LT XLPE CABLE 1CX16+25 |