| 1 | Pumping Machinary For Ex.Well,7.5 BHP, Discharge = 4780 LPH, Head = 83 m |
| 2 | Providing, erecting and giving tests of submersible pump set confirming to IS 8034 and motor confirming to IS 9283, with water proof winding and discharge with stainless steel shaft. Mortar suitable for working on 415 V = 10% 3 phase 50 Hz A.C. supply with cable guard, thrush carbon/fible bearing to withstand entire hydraulic thrust with suitable suction strainer. Pump should have suitable discharge outlet as per manufacture\"s design. Antithrust streamlined non return valve shall be provided with the pump. 3 m submersible copper conductor cable in single / double run and 2 pairs of suitable size erection clamp 10 mm thick shall be provided with each pump. |
| 3 | Supplyingand erecting Cupboard type panel board. |
| 4 | Supplying and erecting flat flexible 3 core 6 sq mm PVC sheathed submersible type copper cable suitably clamped at fixed intervals with column pipe assembly complete. |
| 5 | Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below. |
| 6 | Providing, supplying and fixing ISI mark CI D/F Reflux valve (non-return valves of following dia including all taxes (central and local), railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental store/site, unloading, stacking etc. complete. Reflux valves as per I.S. 5312 part I (1984) |
| 7 | Providing and fixing double flanged sluice valve confirming for IS-2096/14846 including worn gear arrangements as per test pressure stainles steel spindle, caps including all taxes transportation etc complete. |
| 8 | Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) |
| 9 | Providing and erecting pressure gauge of required capacity complete with syphon tube, isolating cock suitable for 12mm dia GI pipe. Pressure gauge shall be installed as directed, with tapping on rising main pressure gauge (100 mm dia) |
| 10 | Providing pipe type earthing with 40mm dia G.I Pipe or 20 mm dia G.I Rod complete with all materials as per specifications no EA-EP |
| 11 | Supplying and erecting \"b\" class GI bend in position withnecessary material. |
| 12 | Supplying and erecting \"b\" classGI Teein position withnecessary material. |
| 13 | Gravity Main GI-40mm 1500 mDismenteling dead pipe line of following dia. G.I.pipe medium class, including breaking joint,threading, cleaning,stacking in positionall labour work etc. comp. |
| 14 | Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below. |
| 15 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOt & GOM in all respect etc. complete |
| 16 | Providingandsupplying Air Valvesas per IS-10845and MJP’s standard specificationsdoubleorificetypecombinedwithscrewdownisolatingvalve,small orificeelasticballrestingonagunmetalorificenipple,largeorificevulcaniteball seatingon mouldedseatring,inletfaceanddrilled,includingall taxes(Centraland local), insurance, third party inspection charges, loading, unloding, transportatoin upto departmental stores / site, etc. complete. |
| 17 | Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge. |
| 18 | Hydraulic testing of G. I. pipe line to specified pressure including cost of all materials and labour and water for testing for the length upto 1km using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour operation charges etc. required for testing, The rates under this item shall also include cost of retesting if necessary and reinstating to original postion. |
| 19 | Lowering, laying, jointing in positionfollowing CI/DF Reflux, butterfly valves and sluice valves including cost of all labors jointing material including nutbolts and giving satisfactory hydraulic testing etc complete ( Rates for all class of valves ) |
| 20 | Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete, 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M-150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve tee, etc. complete as per type design and as directed by Engineer -in- charge for following diameters of pipe lines (type design attached.) |
| 21 | ProvidingandconstructingB.B.masonryvalvechamberwith15cmthick1:2:4 proportionPCCbedding,excludingexcavation,B.B. masonryin C.M. 1:5 Proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge. |
| 22 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) |
| 23 | Distribution System Total Length = 2204 m 75 ø to 90 ø HDPE PN6 and GI Pipe Length = 200 m Dia 65 ø Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GSTlevied by GI & GOM in all respect etc. complete. |
| 24 | 90 ø |
| 25 | Providing & Supply of Electro Fusion Fittingsin accordance with BS EN12201: Part-3 suitablefor drinking water with in black/ blue colourmanufactured from compounded PE80/ PE100virgin polymer and compatible with PE80/PE100pipes, in pressure rating SDR11 with min PN12.5rated for water application and shall be inclusive ofall cost such as testing, inspection charges,transportation up to store, transit insurance,loading, unloading, stacking excluding GST leviedby GOI & GOM in all respect, etc. complete. |
| 26 | Couplers 90 |
| 27 | Equal Tee 75 |
| 28 | Equal Tee 90 |
| 29 | Reducer 90x75 |
| 30 | Reducer 110x90 |
| 31 | LNPE 75 Spigot Long Neck Pipe End (Stub End) for Electro Fusion joint |
| 32 | LNPE 90 Spigot Long Neck Pipe End (Stub End) for Electro Fusion joint |
| 33 | Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below. |
| 34 | 80 ø |
| 35 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOt & GOM in all respect etc. complete.Without by pass arrangement - PN-1. |
| 36 | 80 ø |
| 37 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 38 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 39 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in_x0002_charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-4/259) |
| 40 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259) |
| 41 | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) from excavated stuff |
| 42 | Lowering, Laying and Jointing H. D. P. E./M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulicjack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II |
| 43 | 90 ø |
| 44 | Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position... |
| 45 | 90 ø |
| 46 | Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge. |
| 47 | 80 ø |
| 48 | Hydraulic testing of G. I. pipe line to specified pressure including cost of all materials and labour and water for testing for the length upto 1km using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour operation charges etc. required for testing, The rates under this item shall also include cost of retesting if necessary and reinstating to original postion. |
| 49 | 80 ø |
| 50 | Lowering, laying, jointing in positionfollowing CI/DF Reflux, butterfly valves and sluice valves including cost of all labors jointing material including nutbolts and giving satisfactory hydraulic testing etc complete ( Rates for all class of valves ) |
| 51 | 80 ø |
| 52 | Providing and fixing C.I. road box including loading, unloading and carting to site of work including all necessary excavation in all types of strata and fixing in murum packing, etc. complete |
| 53 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) |
| 54 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 55 | Making cross connection to existing distribution main of any type including excavation, breaking and removing existing pipes, lowering, laying of specials and pipes in their position, refilling, closing the water supply in that area, dewatering and restarting the water supply, etc. complete as directed by Engineer-in-charge for following diameters of existing pipeline, irrespective of diameter of branch line. (The number of joints involved will be paid separately depending upon the nature of joints and required pipes, valves and specials will be supplied free of cost at stores.) |
| 56 | 100 mm |
| 57 | Informatory Sign Boards and Trial RunCommisioning running and maintaining the scheme to quantities, rate capacity, including manning necessory personnel such as operator, valveman, etc, as pr requirements of the scheme and who should also administer chemical dose for a period of one month for individual scheme together with training of personnel spared by MJP/ Local Body and handling over the scheme to Local Body after completion of the above period as directed by Engineer - in charge. |
| 58 | enamel paint and supported on one no. mild steel angle iron post 75 mm x 75 mm x 6 mm, 3.5 mt long firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below |