Construction Of Mini Community Sanitary Complex (Type-2) At Ambalavanapuram Near Kalaiyarangam In Avaraikulam Village Panchayat, Valliyoor Panchayat Union. , Earth Work Excavation And Depositing On Bank With In Initial Lead Of 10 M And Initial Lift Of 2M In Hard Stiff Clay, Stiff Black Cotton Soil, Hard Red Earth,Earth Mixed With Small Sized Boulders And Hard Gravelly Soil As Per Ss 20B , Cement Concrete 1:4:8 Mix Using 40Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing,Laying And Curing Etc Complete , Brick Work In Cement Mortar 1:5 Mix Using Country Bricks 83/4X4 1/4X2 3/4 And Conveyance Of All Materials To Site And All Labour Charges Etc Complete. Below Basement , Brick Work Cm 1:5 Mix Using Good Country Bricks Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc Complete. Above Basement , Supplying And Erecting Centeringshuttering Includingnecessary Supportsforplane Surface Infoundationandbasementandinallfloorsforr C Ccolumn Footing Column Plinth Beam, Beams, Roof Slabs, Staircase Steps, Bed Blocks, Criticalpier Etc Using Mild Steel Sheets Of Size 90 X 60 Cm And 10 Guagestiffened, Weldedwithmild Steel Angles Ofsize25mmx25mmx3mmforboardinglaidoversilver Oak(Country Wood) Scantlings Of Size 10Cm X 6.5Cm Spacedof About 90Cm Centretocentreand Supported By Casurina Props Of 10Cm To 13Cm Dia Spacedat 75Cmcentretocentre Complete Complying With Standardspecificationsandasdirectedbydepartmental Officers Including Conveyance Of All Materials To Site And Proper Centering Etc Complete. Below Basements , Supplying And Erecting Centeringshuttering Includingnecessary Supportsforplane Surface Infoundationandbasementandinallfloorsforr C Ccolumn Footing Column Plinth Beam, Beams, Roof Slabs, Staircase Steps, Bed Blocks, Criticalpier Etc Using Mild Steel Sheets Of Size 90 X 60 Cm And 10 Guagestiffened, Weldedwithmild Steel Angles Ofsize25mmx25mmx3mmforboardinglaidoversilver Oak(Country Wood) Scantlings Of Size 10Cm X 6.5Cm Spacedof About 90Cm Centretocentreand Supported By Casurina Props Of 10Cm To 13Cm Dia Spacedat 75Cmcentretocentre Complete Complying With Standardspecificationsandasdirectedbydepartmental Officers Including Conveyance Of All Materials To Site And Proper Centering Etc Complete. Above Basement , Supplying Fabricating And Placing In Position Of Ribbed Steel Rods For Reinforcement To All Rcc Works As Per Design Given Including Cost Of Steel And Binding Wire Also In All Floors Etc., Complete. , Providing And Laying In Position, Standardised Concrete Mix M-20 Grade In Accordance With Is 456 Using 20Mm And Down Graded Hard Broken Granite Stone Jelly For All Rcc Items Of Works With Minimum Cement Content Of 325 Kg/M3 And Maximum Water Cement Ratio Of 0.55, Including Admixture (Plasticiser / Super Plasticiser) In Recommended Proportions As Per Is:9103 To Accelerate, Retard Setting Of Concrete, Improve Workability Without Impairing Strength And Durability With About (5 Cu.M.) 7730 Kg. Of 20Mm Machine Crushed Stone Jelly And With About (3.3 Cu.M.) 5156 Kg. Of 10- 12Mm Machine Crushed Stone Jelly And With About (4.79 Cu.M) 7670 Kg. Of Crushed Stone Sand, But Excluding Cost Of Reinforcement Grill And Fabricating Charges, Centering And Shuttering And Also Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Rcc Floor/ Roof Slabs Wherever Necessary Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers. The Coarse And Fine Aggregates To Be Used Should Comply With The Requirements Of Is Standards. (No Separate Payment Will Be Made By The Department For The Excess Usage Of Materials). , Supplying And Applying Of Two Coats Of Putty Of 3Mm Thick Over The Exposed Rcc Surface Of Ceilingincluding Finishing The Joints Smoothy With Grinding Machine And The Surface Shall Be Thoroughly Cleaned Out Of Dust And Scrubbing. The Surface Shall Then Be Allowed To Dry For Atleast 48 Hours. It Shall Then Be Sand Papered (Waterproof Abrasive Sheet) To Give A Smooth And Even Surface. Any Unevenness Shall Be Made Good By Applying 1St Coat Of Putty Mixed With Water On The Entiresurface Including Filling Up The Undulations And Applying 2Nd Coat Of Putty After 6 Hours Of 1St Coatof Putty And Then Sand Papering (Waterproof Abrasive Sheet) The Same After It Is Dry And Finishing The Surface Smoothly, Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers. [The Rates Are Inclusive Of Hire Charges For Grinding Machine With Wheel, Cost Of Sand Paper (Waterproof Abrasive Sheet), Cost Of Putty Blade, Labour Charges For Grinding The Joints And Sand Papering, Two Coat Of Putty, Scrapping The Putty Area To Level The Surface Smooth, Etc., Complete]. The Putty Shoule Be Got Approved By The Executive Engineer Before Use On Work , Plastering With Cement Mortar 1:5 Mixto12mmthick Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc Complete , Finishing The Top Of Roof With One Course Of Pressed Tiles Of Size 23 Cm X 23 Cm X 2 Cm Laid In Cement Mortar 1:3 (One Cement And Three Sand) 12Mm Thick Mixed With Water Proofing Compound Conforming To I.S. At 2% By Weight. , Paving The Floor With Pre-Polished Concrete Anti-Skid Tiles (Required Shape And Design) Of 20Mm Thick Of Approved Quality And Colour Laid In Cement Mortar 1:3 (One Cement And Three Sand) 20Mm Thick And Pointed With White Cement Mixed With Colouring Pigment At The Rate Of 0.40 Kg. / Sq.M., Curing, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers. , Dadooing Of Walls With White Glazed Tiles Of Size 15Cmx15cmx6 Mmlaid In Cm 1:2, 10Mm Thick & Pointing With White Cement Using 0.4Kg/Cm2 , Distembering Two Coats With Best Approved Distemberincluding Cost And Conveyance Of All Materials To Site And All Labour Charges Etc Complete , Exterior Emulsion Painting Two Coats With Best Approved Quality And Colourpaint Over One Coat Of Base Coat Including Cost And Convyance Of All Materials To Work Site And Labour Charges Etc., Complete. , Cost And Supply Of Iwc , Cost And Supply Of Ewc , Supply And Fixing Of2000 Lit Pvc Tank