| 1 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150 m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in-charge. [Rate provided is inclusive of the cost of stone boulders and sausage crate] |
| 2 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150 m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in-charge. [Re-use 60% boulder from old existing boulder sausage wall] |
| 3 | Supplying & Weaving wire mattress as directed with wire of 4 mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.) |
| 4 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge. II. In all sorts of soil excluding marshy soil & rocks (soft or hard) by mechanical means (using excavator of suitable capacity). a) upto 3 m depth (iv) Without pumping out water & shoring. |
| 5 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20mm. Nominal size) excluding shuttering & reinforcement, if any, in ground floor as per relevant IS codes. b) N.B. Variety |
| 6 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.(b) Where staging is not required. |
| 7 | Supplying empty Cement bags in good condition. Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. |
| 8 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (iv) For Construction of Sub Base by compacting river bed materials. |
| 9 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. I. Stone/Boulder |
| 10 | Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150m. |
| 11 | Add GST @ 18% on Rs. 20,21,252.78i.e. total amount over item no. 1 to 09 |
| 12 | Add Labour Welfare Cess @ 1% of Rs. 23,85,078.28 i.e. total amount Item No. 1 to 10 |