| 1 | Mobilisation Charges of all tools & Plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different Bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of Engineer-in-Charge.Detailed Investigation. |
| 2 | Carriage of all Disturbed & Undisturbed Samples from site of work to the Divisional office or elsewhere including loading and unloading as per direction of Engineer-in-Charge. Detailed Investigation. |
| 3 | Labour for making Bore-Holes of 150mm to 250mm dia. by any standard method to any depth below ground level / bed level in all kinds of soil like clay, , silt, sand, stiff clay, mixed soils etc. except rocks (for the purpose of collecting Disturbed & Un disturbed soil samples, conducting Standard Penetration Test at suitable intervals etc.) including preparation and submission of bore-log as per IRC : 75 and 78 and Clause 2400 of Specifications for Road & Bridge Works (5th Revision), Published by IRC, and also including hire charges of tools and plants complete as per the direction of Engineer-in-Charge.When Casing pipe is used to prevent collapse of bore hole (casing pipe to be finally withdrawn).Depth 0m to 10m |
| 4 | Depth greater than 10m and upto 20m |
| 5 | Depth greater than 20m and upto 30m |
| 6 | Depth greater than 30m. and upto 40m |
| 7 | Field InvestigationCollection of Undisturbed soil sample from the bore hole to be made by the concerned Division / Party at their cost.0.0m - 10.0m. |
| 8 | Standard Penetration Tests (S.P.T.) by Split Spoon Sampler in the bore hole as per IS 2131.0.0m - 10.0m |
| 9 | 10.0m-20.0m |
| 10 | 20.0m-30.0m |
| 11 | Collection of Samples from the bore hole made as per B-a.Disturbed. |
| 12 | Laboratory InvestigationLiquid Limit as per IS 2720 (Part – V). |
| 13 | Plastic Limit as per IS 2720 (Part – V) |
| 14 | Grain size analysis by Sieving as per IS 2720(Part – IV). |
| 15 | Grain size analysis by Hydrometer Method asper IS 2720 (Part – IV). |
| 16 | Determination of Water Content as per IS2720 (Part – II). |
| 17 | Determination of Specific Gravity as per IS2720 (Part – III). |
| 18 | Direct Shear Test as per IS 2720 (Part – XIII). |
| 19 | Determination of Unconfined CompressionStrength as per IS 2720 (Part – X).Undisturbed. |
| 20 | Determination of Unconfined CompressionStrength as per IS 2720 (Part – X).Remoulded. |
| 21 | Determination of Shrinkage Factor as per IS2720 (Part – VI). |
| 22 | Determination of Consolidation Properties asper IS 2720 (Part – XIV). |
| 23 | Tri-Axial Shear TestDetermination of Shear strength Parameters of a specimen tested in Unconsolidated Undrained Tri-axial compression without measurement of pore water pressure as per IS 2720 (Part – XI). |
| 24 | Determination of Shear strength Parameters of a specimen tested in Consolidated Undrained Tri-axial compression Test with measurement of pore water pressure as per IS 2720 (Part – XII). |
| 25 | Determination of Shear strength Parameters of a soil from Consolidated Drained Test as per IS 2720 (Part – X). |
| 26 | Laboratory Determination of Permeability asper IS 2720 (Part– XVII). |
| 27 | Determination of pH Value as per IS 2720(Part– VIII). |
| 28 | Determination of Total Soluble Sulphate asper IS 2720 (Part– VIII). |
| 29 | Determination of Organic Matter as per IS2720 (Part– XXII). |
| 30 | Determination of Calcium Carbonate as per IS 2720 (Part– VIII). |
| 31 | Laboratory Vane Shear Test as per IS 2720(Part-XVIII). |
| 32 | SANDEstimation of Deleterious Materials as per IS:2386 (Part – II). |
| 33 | Estimation of Organic Impurities as per IS:2116 & 383. |
| 34 | Determination of Bulk Density as per IS:2386 (Part III). |
| 35 | Determination of Bulking of Sand |
| 36 | Preparation and submission of report in 6 (Six) copies, giving all relevant information data like site plan, Bore log and water table, test results,calculations, discussions, suggestions and recommendations in respect of suitable foundation etc. including determination of silt factor calculation of waterways and complete design of foundation including analysis of Bearing Capacities and settlements in bound and presentable form complete as per direction of Engineer-in-Charge.Detailed Investigation. |
| 37 | Add GST @ 18% |
| 38 | Add Labour Welfare Cess @ 1% |