| 1 | Cutting heavy under growth and bushes up to 7.5 cm diameter including removal of roots with collection and removal as directed by Engineer-in-charge. |
| 2 | Dismantling old dameged stone lining work in canal & stacking of stone as per direction of engineer in charge. |
| 3 | Dismantling old dameged khanda stone work in canal & stacking of stone as per direction of engineer in charge. |
| 4 | Dismantling old damaged weathered cement concrete including disposal of refuse as per direction of engineer in charge. |
| 5 | Earth work in MKR soil for making canal section & key drains for canal liningin all type of strata with all lead & lift including allmaterial, labour, T&P etc required for proper completion of work as directed by Engineer-in-charge. |
| 6 | Providing and laying cement concrete in 1:4:8 CM (1 Cement : 4 coarse sand : 8 graded stone aggregate 20 - 40 mm nominal size) in base Including all cost of material, labour, T&P, curing etc complete in all for proper completation of work. |
| 7 | P/L TMT Steel Reinrocment in safety ladders including cutting, bending placing in position & binding with G.I. wire with its cost. |
| 8 | Providing and fixing centering & shuttering for RCC work including cost of all material, labour, T&P etc required for proper completion of work with it’s removal. |
| 9 | Providing & laying reinforcement cement concrete 1:2:4 with graded metarial of size 20 mm in safety ladder works including cost of all material, labour, T&P etc required for proper completion of work but excluding cost of centering & shuttering and reinforcement. |
| 10 | Prepration of Subgrade. |
| 11 | Laying old flag stone lining using old stone upto 50 mm thick in cement mortar excluding pointing but including base cement plaster not less then 12 mm thick below flagstone in 1:3 CM. |
| 12 | P/Laying flag stone lining upto 50 mm thick in cement mortar excluding pointing but including base cement plaster not less then 50 mm thick below flagstone in 1:3 CM. |
| 13 | P/L 50 mm thick sand in Berm including cost of all material, labour, T&P etc required for proper completion of work. |
| 14 | Laying CC 1:2:4 CM (M-15) with graded metarial of size 20 mm include mixing & curing, all type of labour, T&P etc complete in all as directed by Engineer-in-charge (as per IS 3873:1993 Clause 5.5.1.7) |
| 15 | Ruled or flush pointing on flag stone lining with 1:03 CMincluding all cost of labour, T&P etc required for proper completion of work. |
| 16 | Note- Rate to be quote exclusive of G.S.T. |