Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-07-2025 | Corrigendum 2 | Date | 30-07-2025 |
| 2 | 15-07-2025 | Corr 1 and Reply to PBQ | Date | 22-07-2025 |
| Sl. No. | Item Description |
| 1 | PART 1 - PS-Supply |
| 2 | For Miscellaneous works of SCADA & Telecom the scope of work (not limited to) as Project Management, System Design, Detail Engineering, Supply of Materials, Inspection & Factory Acceptance Testing (Equipment & Integrated with subsystem), Packaging, forwarding, Insurance, Transit Insurance, Shipping, Port Handling, Custom Clearance, Inland Transportation to store, Supply of all related erection goods including Mandatory spares, Commissioning spares, power supply devices, surge protection device, Loading, Unloading & Handling, Storage & Safe custody, Transportation from store to site , Supply of all type of Erection Items, Erection, erection of foundation support channel on trench for panel erection, Pre‐commissioning activity, Integration with existing Telecom system, Integration with existing SCADA and APPS system, Testing, Trial Run, Commissioning, Training, Warranty, Extended warranty, Post Warranty Maintenance contract – comprehensive for 5 years for all supplied equipment, Including minor civil works, documentation of miscellaneous works related to Telecommunication System, SCADA & APPS system and Electrical works (mainly Solar system etc), Complete in all respect and shall be executed as Turnkey individual work contract basis as per Job Specification, technical specification and in compliance tovarious clauses as per tender requirement. Integration with existing Telecommunication System, SCADA and APPS System of IGGL as per requirements is also in bidder’s scope. Location details will be provided during detailed engineering. |
| 3 | Supply: Supply with all works defined above |
| 4 | OFC based Type-1 MPLS-TP (10 G) equipment, fully wired with Free-standing Rack as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement. Client / PMC reserve the right to order as per the requirement of project. |
| 5 | OFC based Type-2 MPLS-TP (10 G) equipment, necessary accessories etc as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement. (Including spare in Assam) |
| 6 | Type-2 MPLS-TP (10G) equipment Network Management System (NMS) Server (Rack Mounted) including all Hardware & Software, accessories for Telecommunication System as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 7 | All Hardware and accessories, as required, as per above |
| 8 | All Software (including MPLS- TP) as per above |
| 9 | Type-2 MPLS-TP (10G) equipment Network Management System (NMS) Client work station including all Hardware & Software, accessories for Telecommunication System as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 10 | All Hardwareand accessories, as required, as per above |
| 11 | All Software (including MPLS- TP) as per above |
| 12 | Type-1 Remote terminal units (RTU) with fully wired free standing Panel consisting all Hardware, necessary accessories, GPRS MODEM etc complete in all respect, as required and as defined complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement. Client / PMC reserve the right to order as per the requirement of project. |
| 13 | Type-2 Remote terminal units (RTU) consisting all Hardware, necessary accessories, GPRS MODEM, etc complete in all respect, as required and as defined complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement.(including spare in Assam) |
| 14 | Explosion Proof PoE powered IP telephones including power supply adaptor, Ethernet Cable & patch cord, mounting kit with required hardware, cabling / accessories, etc. as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement. |
| 15 | PTZ Camera with IR illuminator with housing accessories, Mounting Arrangements, Ethernet switches, Converter, Gateways and necessary accessories etc. as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 16 | SKID MOUNTED SPV POWER SOURCE System Design, Detailed Engineering, procurement of materials, Inspection/FAT (Factory acceptance test), Supply of materials, Transportation, loading/unloading, insurance, Storage at warehouse/store (hired by bidder) of complete Skid Mounted Solar PV based Power source with two days autonomy (72 Hrs Backup) for 150W DC load for twenty four hours operation per day operation as per tender specification, data sheet, scope of work and block diagram enclosed including commissioning spares as required at each SV station. The system shall include following-(i) ATEX / EX type Solar PV Panel (for use in hazardous area as per Class 1, Div 2/ Zone 2) with explosion proof junction boxes, Steel structure for skid and mounting of the solar panels and battery box. (ii) Dual redundant Solar charge controller-MPPT type (output suitable to charge the battery bank in CC & CV mode)(iii) SMF- VRLA battery cells (12V DC) in Ex (FLP) junction boxes(iv) Interconnecting cables among arrays, hybrid charge controller, battery bank, junction boxes etc including supply of all accessories like FLP cable glands, cable tray, tinned-cu lugs etc as required.(v) Earthing and lightning protection system as required to complete the system.(vi) Erection materials & Other miscellaneous work.Rating of SPV array, charge controller and battery bank shall be selected to meet the load requirement as specified above. However, each subsystem rating shall not be less than the value given below- |
| 17 | Solar PV Modules- Ex type (for use in hazardous area as per Class 1, Div 2/ Zone 2) for SPV array along with junction boxes as per specification and scope of work (Total capacity Min 1920 Wp) |
| 18 | Dual redundant MPPT Solar Charger in PESO approved Ex-d enclosure (with Exd/Exe breather) with 230V AC to 24V DC SMPS. It shall have redundant inputs (one from solar panel and other from 230V AC to 24V DC SMPS) to charge the battery bank & supply external load. Necessary O-Ring MOSFET Module also to be provided. |
| 19 | SMF Battery Min @ 12 V, 200 Ah x 6 nos (2 in series) in FLP (Ex- d certified) junction boxes (one battery in each junction box with Exd/Exe breather) as per specification. |
| 20 | Balance of System (BOS) materials & equipment for solar system for 72 hrs back up system- 1) Interconnecting cables among arrays (solar grade), charge controller, battery pack, converter, junction boxes etc including supply of all accessories like FLP cable glands, cable tie, cable tray, tinned-cu lugs etc as required.2) Lightning protection system as required to complete the system.3) Supply of 2 year O&M spares as per list attached in scope of work4) Required material for Erection work, Civil & Other miscellaneous work |
| 21 | SKID MOUNTED SPV POWER SOURCE System Design, Detailed Engineering, procurement of materials, Inspection/FAT (Factory acceptance test), Supply of materials, Transportation, loading/unloading, insurance, Storage at warehouse/store (hired by bidder) of complete Skid Mounted Solar PV based Power source with two days autonomy (48 Hrs Backup) for 150W DC load for twenty four hours operation per day operation as per tender specification, data sheet, scope of work and block diagram enclosed including commissioning spares as required at each SV station. The system shall include following-(i) ATEX / EX type Solar PV Panel (for use in hazardous area as per Class 1, Div 2/ Zone 2)with explosion proof junction boxes, Steel structure for skid and mounting of the solar panels and battery box. (ii) Dual Redundant Solar charge controller-MPPT type (output suitable to charge the battery bank in CC & CV mode)(iii) SMF- VRLA battery cells (12V DC) in Ex (FLP) junction boxes(iv) Interconnecting cables among arrays, hybrid charge controller, battery bank, junction boxes etc including supply of all accessories like FLP cable glands, cable tray, tinned-cu lugs etc as required.(v) Earthing and lightning protection system as required to complete the system.(vi) Erection materials & Other miscellaneous work.Rating of SPV array, charge controller and battery bank shall be selected to meet the load requirement as specified above. However, each subsystem rating shall not be less than the value given below- |
| 22 | Solar PV Modules- Ex type (for use in hazardous area as per Class 1, Div 2/ Zone 2) for SPV array along with junction boxes as per specification and scope of work (Total capacity Min 1920 Wp) |
| 23 | Dual redundant MPPT Solar Charger in PESO approved Ex-d enclosure (with Exd/Exe breather) with 230V AC to 24V DC SMPS. It shall have redundant inputs (one from solar panel and other from 230V AC to 24V DC SMPS) to charge the battery bank & supply external load. Necessary O-Ring MOSFET Module also to be provided. |
| 24 | SMF Battery Min @ 12 V, 200 Ah x 4 nos in FLP (2 in series) (Ex- d certified) junction boxes (one battery in each junction box with Exd/Exe breather) as per specification. |
| 25 | Balance of System (BOS) materials & equipment for solar system for 48 hrs backup system- 1) Interconnecting cables among arrays (solar grade), charge controller, battery pack, converter, junction boxes etc including supply of all accessories like FLP cable glands, cable tie, cable tray, tinned-cu lugs etc as required.2) Lightning protection system as required to complete the system.3) Supply of 2 year O&M spares as per list attached in scope of work4) Required material for Erection work, Civil & Other miscellaneous work |
| 26 | 230V AC Lighting distribution board (IP-65, weather proof & Flame proof) with Cu bus-bar (1 no- 32A 2P AC RCBO 30mA I/C, 5 nos- 10A DP MCB & 4 nos 16A DP O/G with indicating lamp) as per specification for normal power distribution. |
| 27 | Supply of integral flame proof well glass fixture (CIMFR approved for Zone-1/2 gas group IIA & IIB) with 72 W LED luminaire with inbuilt flame proof control gear Model no. FLPW-1245 of Baliga make or equivalent) complete with mounting bracket, flame proof control gear box, lamps etc as per specifications. drawings |
| 28 | Supply of Street lighting pole 6mtr high GI octagonal pole (Type BOP-6030 of Bajaj make or equivalent) complete with bracket, GI clamps, FLP Cable glands, flame and weather proof (IP-65) junction boxes (4 way) as per standard drawing (MEC/SD/05/E9/77/04) & specification (MEC/TS/05/E9/077B). |
| 29 | Design, Detailed Engineering, procurement of material, Inspection/FAT (Factory acceptance test), Supply, Transportation, loading/unloading, insurance, Storage at warehouse/store (hired by bidder) of Solar Street lighting system complete with GI pole and GI mounting bracket, control gear box, internal cable from fitting to junction box, and min FLP WG LED fixture (PESO Approved),three days battery backup with VRLA battery with Ex-d FLP box (2x75 AH), Solar PV Module (2x100Wp) (for use in hazardous area as per Class 1, Div 2 / Zone-2),, earthing, electronics, charger, dusk-dawn operation, GI -pole (5 Mtr, with 80 Micron Galvanization) etc including pipe inserts for cables and connecting work, civil work and commissioning spares as required, with all material and labour as per specifications, drawings and instruction of Engineer-in-charge. Work to be completed in all respects. |
| 30 | MandatorySpares:Supply of loose Mandatory Spares Complete in all respect,as required and as per Particular job specification, technical specification and various clauses as per tender requirement (Bill of Material has to be provided along with offer, any fraction quantity should be round off to nearest number in higher side). |
| 31 | Fully wired Explosion Proof Junction Boxes with power supply converters (SMPS), Fibre Optic Patch Panel/ LIU,other accessories complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirement. The junction box shall be provided for housing of Type-2 MPLS-TP equipment and shall be provided with explosion proof breather valve. 2 nos. of junction box shall be provided which shall be connected internally. 1 no. of type-2 MPLS-TP equipment shall be installed in each junction box and all other equipment shall be distributed in both the junction boxes accordingly. |
| 32 | Fully wired Explosion Proof Junction Box for field area with power supply converter (SMPS),other accessories complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirement. The junction box shall be provided for housing of Type-2 RTU and shall be provided with explosion proof breather valve. |
| 33 | Fully Wired CRCA Console consisting all hardware, necessary accessories complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirement. |
| 34 | Extended Warranty per month (The extended warranty of the complete supplied system (including all type-1 MPLS-TP equipment, Type-2 MPLS-TP equipment, IP phones, CCTV cameras, Type-1 RTU, Type-2 RTU, Skid Mounted Solar PV based Power source, junction box, lights, all accessories etc.) (Refer Note 7 to MR) |
| 35 | Total price including all costs, freight, insurance till commissioning, GST etc. |
| 36 | PART 2 -Site work |
| 37 | Site work, Installation, Integration with existing systems, testing, commissioning, trial run, handover, including supply and erection of – (all installation materials, accessories, connectors, Distribution boxes, MDF, IDF,cables {FRLS Armoured Power cables, FRLS Armoured control cables, co-axial cable, multi-pair armoured telephone cables, FRPVC Armoured CAT-6 Ethernet Cables, Arnoured Optical fibre cable}, cable glands {ex-proof as per the area classification},civil foundation for all the supplied system, cable trays, SPD, double pole MCBs, power supply converters, OFC Splicing, OFC connectors, patch cords, pigtails, cable management, Cable tails), earthing, junction boxes, mounting arrangements for all supplied system and free issue system (MPLS-TP System, Telephones, CCTV Cameras, MDF Krone modules, NMS, Solar Power supply system, RTU etc) as required complete in all respect as per the site condition), trenching & backfilling, cabling, glanding, termination, seamless integration with existing telecom system (MPLS-TP, CCTV, EPABX System) and existing SCADA & APPS system of IGGL NEGG pipeline , etc for all the functions as specified under various clause of tender line, Training, Warranty, Post Warranty Comprehensive Maintenance Contract (after warranty), Mandatory & commissioning spares, Power testing of already laid 24 F OFC fiber, supply of OFC connectors, minor civil works & documentation of Telecommunication System and SCADA and APPS System and all other items / work not indicated here but required for completion of the scope of work., complete in all respect as specified in various documents attached with tender Particular job specification, technical specification and various clauses as per tender requirement and as per the site condition. |
| 38 | All site works as defined above at respective station including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of OFC based Type-1 MPLS-TP (10 G)equipment, fully wired with Free-standing Rack as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement. This is an optional item and shall be executed as per the requirement of IGGL/ MECON. |
| 39 | All site works as defined above at respective station including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of OFC based Type-2 MPLS-TP (10 G)equipment complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 40 | All Site work as definedabove at respective station including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of Type-2 MPLS-TP (10G) equipment Network Management System (NMS) Server (Rack Mounted) and client work station including all Hardware & Software, accessories for Telecommunication System as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 41 | All Hardwareand accessories, as required |
| 42 | All software (including MPLS-TP) as required |
| 43 | All Site work as definedabove at respective station including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of Type-1 Remote terminal units (RTU) with fully wired free standing Panel consisting all Hardware, necessary accessories, GPRS MODEM etc complete in all respect, as required and as defined complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement. This is an optional item and shall be executed as per the requirement of IGGL/ MECON. |
| 44 | All Hardwareand accessories, as required, as per above |
| 45 | All Software (including MPLS- TP) as per above |
| 46 | All Site work as definedabove at respective station including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of Type-1 Remote terminal units (RTU) with fully wired free standing Panel consisting all Hardware, necessary accessories, GPRS MODEM etc complete in all respect, as required and as defined complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement. This is an optional item and shall be executed as per the requirement of IGGL/ MECON. |
| 47 | All Site work as definedabove at respective station including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of Type-2 Remote terminal units (RTU) consisting all Hardware, necessary accessories, GPRS MODEM etc complete in all respect, as required and as defined complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 48 | All Site work as defined above at respective stations including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of Explosion proof PoE powered IP telephones including power supply adaptor, Ethernet Cable & patch cord, mounting kit with required hardware, accessories, etc. as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 49 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required for installation, testing and commissioning of Weather Proof IP PTZ cameras, complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 50 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required for SKID MOUNTED SPV POWER SOURCE FOR INSTRUMENTATION, SCADA & TELECOM LOAD including Installation, testing, commissioning and performance test at site of complete Solar PV based Power source with three days autonomy (72 Hrs Backup)for 150W DC load for twenty four hours operation per day operation as per tender specification, data sheet, scope of work and block diagram enclosed including commissioning spares as required at each station. The system shall include following-(i) ATEX / EX type Solar PV Panel(for use in hazardous area as per Class 1, Div 2/ Zone 2) with explosion proof junction boxes, Steel structure for skid and mounting of the solar panels and battery box. (ii) Dual Redundant Solar charge controller-MPPT type (output suitable to charge the battery bank in CC & CV mode) with BMS system.(iii) SMF- VRLA battery cells (12V DC) in Ex (FLP) junction boxes(iv) Interconnecting cables among arrays, hybrid charge controller, battery bank, junction boxes etc including installation of all accessories like FLP cable glands, cable tray, tinned-cu lugs etc as required.(vi) Earthing and lightning protection system as required to complete the system.(vii) Erection materials & Other miscellaneous workRating of SPV array, charge controller and battery bank shall be selected to meet the load requirement as specified above. However, each subsystem rating shall not be less than the value given below- |
| 51 | Solar PV Modules- Ex type (for use in hazardous area as per Class 1, Div 2/ Zone 2), for SPV array along with junction boxes as per specification and scope of work |
| 52 | Dual redundant MPPT Solar Charger in PESO approved Ex-d enclosure (with Exd/Exe breather) with 230V AC to 24V DC SMPS. It shall have redundant inputs (one from solar panel and other from 230V AC to 24V DC SMPS) to charge the battery bank & supply external load. Necessary O-Ring MOSFET Module also be provided. |
| 53 | SMF Battery Min @ 12 V, 200 Ah x 6 nos (2 in series) in FLP (Ex- d certified) junction boxes (one battery in each junction box with Exd/Exe breather) as per specification. |
| 54 | Balance of System materials & equipment for 72 hrs backup system- 1) Interconnecting cables among arrays (solar grade), charge controller, battery bank, Grid charger, DCDBs, junction boxes etc including erection of all accessories like FLP cable glands, cable tray, tinned-cu lugs etc as required.2) Earthing and lightning protection system as required to complete the system.3) Erection materials, Civil & Other miscellaneous work |
| 55 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required for SKID MOUNTED SPV POWER SOURCE FOR INSTRUMENTATION, SCADA & TELECOM LOAD including Installation, testing, commissioning and performance test at site of complete Solar PV based Power source with two days autonomy (48 Hrs Backup) for 150W DC load for twenty four hours operation per day operation as per tender specification, data sheet, scope of work and block diagram enclosed including commissioning spares as required at each SV station. The system shall include following-(i) ATEX / EX type Solar PV Panel (for use in hazardous area as per Class 1, Div 2/ Zone 2) with explosion proof junction boxes, Anodized AL/ Hot dipped Galvanized M-Steel structure for skid and mounting of the solar panels and battery box. (ii) Dual redundant Solar charge controller-MPPT type (output suitable to charge the battery bank in CC & CV mode) with BMS system.(iii) SMF- VRLA battery cells (12V DC) in Ex (FLP) junction boxes(iv) Interconnecting cables among arrays, hybrid charge controller, battery bank, junction boxes etc including installation of all accessories like FLP cable glands, cable tray, tinned-cu lugs etc as required.(vi) Earthing and lightning protection system as required to complete the system.(vii) Erection materials & Other miscellaneous workRating of SPV array, charge controller and battery bank shall be selected to meet the load requirement as specified above. However, each subsystem rating shall not be less than the value given below- |
| 56 | Solar PV Modules- Ex type (for use in hazardous area as per Class 1, Div 2/ Zone 2), for SPV array along with junction boxes as per specification and scope of work. |
| 57 | Dual redundant MPPT Solar Charger in PESO approved Ex-d enclosure (with Exd/Exe breather) with 230V AC to 24V DC SMPS. It shall have redundant inputs (one from solar panel and other from 230V AC to 24V DC SMPS) to charge the battery bank & supply external load. Necessary O-Ring MOSFET Module also be provided. |
| 58 | SMF Battery @ 12 V, 150 Ah x 4 nos in FLP (Ex certified) junction boxes as per specification and scope of work for system-I with battery management system |
| 59 | Balance of System materials & equipment for 48 hr back up system- 1) Interconnecting cables among arrays (solar grade), charge controller, battery bank, Grid charger, DCDBs, junction boxes etc including erection of all accessories like FLP cable glands, cable tray, tinned-cu lugs etc as required.2) Earthing and lightning protection system as required to complete the system.3) Erection materials, Civil & Other miscellaneous work |
| 60 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required for installation, testing and commissioning of 230V AC Lighting distribution board (IP-55, weather proof) with Cu bus-bar in Guard Room (1 no- 32A 2P AC RCBO 30mA I/C, 5 nos- 10A DP MCB & 4 nos 16A DP O/G with indicating lamp) as per specification for normal power distribution. |
| 61 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of integral flame proof well glass fixture (CIMFR approved for Zone-1/2 gas group IIA & IIB) with 72 W LED luminaire with inbuilt flame proof control gear Model no. FLPW-1245 of Baliga make or equivalent) complete with mounting bracket, flame proof control gear box, lamps etc as per the tender. |
| 62 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of Street lighting pole 6mtr high GI octagonal pole (Type BOP-6030 of Bajaj make or equivalent) complete with bracket, GI clamps, FLP Cable glands, flame and weather proof (IP-65) junction boxes (4 way) as per standard drawing (MEC/SD/05/E9/77/04) & specification (MEC/TS/05/E9/077B). |
| 63 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of Solar Street lighting system complete with GI pole and GI mounting bracket, control gear box, internal cable from fitting to junction box, and min FLP WG LED fixture (PESO Approved),three days battery backup with VRLA battery with Ex-d FLP box (2x75 AH), Solar PV Module (2x100Wp) (for use in hazardous area as per Class 1, Div 2 / Zone-2), earthing, electronics, charger, dusk-dawn operation, GI -pole (5 Mtr, with 80 Micron Galvanization) etc including pipe inserts for cables and connecting work, civil work and commissioning spares as required, with all material and labour as per specifications, drawings and instruction of Engineer-in-charge. Work to be completed in all respects |
| 64 | All Site work as defined above including supply and installation of all required materials, cabling, glanding, termination, etc.as required for supply and installation of advance maintenance free earthing system with 3mtr earth electrode of low carbon steel with 250 micron copper coating with carbon based backfill compound (Resitivity of compound shall be less than 1 ohm-m) as per IS 3043/IEEE-80. (25 mm dia, 3M long steel rod with 250 micron CU bonding) with Civil Chamber. |
| 65 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required for supply and laying of 1.1kV grade XLPE insulated, PVC sheathed, FRLS power and control cables (conforming to IS:7098 and specification) for illumination/ street lights in underground trench /trays- |
| 66 | 3x 2.5 mm2 2XWY – Outdoor lighting & other loads |
| 67 | 3x 4 mm2 2XWY- from DB to Hybrid Charger |
| 68 | All Site work as defined above including supply and installation of erection accessories,etc.as required for Supply and installation of following Hot Dip Galvanized Perforated Type cable trays (as per IS 2629) including bends, tee, crosses, horizontal and vertical splices etc. as required including supply of all G.I hardware, as per approved drawings, specification- |
| 69 | 50 mm wide |
| 70 | 75 mm wide |
| 71 | All Site work as defined above including supply and installation of erection accessories,etc.as required for Supply and installation GI earth strip for earthing of electrical equipment, instrument panels, field instruments, process equipment and pipes/ flanges including all associated civil work with all material and labour as per specification and drawings approved by the company. |
| 72 | GI Strip (50X6) mm |
| 73 | GI Strip (25X3) mm |
| 74 | All Site work as defined above including supply and installation of erection accessories,etc.as required for Supply and installation of Miscellaneous earthing material -Supply of GI Wire rope (8mm- dia/ 25 Sqmm) , (50 mm x 2 mm thick/ 25 Sqmm PVC insulated flexible CU cable) for jumper for flanges/ pipe bonding, 2.5 sq mm insulated flexible Cu wires cable (Green) for field instruments etc for all the stations. 1 Lot comprises of all required work at 1 station. |
| 75 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required forinstallation, testing and commissioning of Type-2 MPLS-TP Fully wired Explosion Proof Junction Box with power supply converter, Fibre Optic Patch Panel/ LIU,other accessories complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirement. |
| 76 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required for installation, testing and commissioning of Type-2 RTU Fully wired Explosion Proof Junction Box for field area with power supply converter,other accessories complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirement. |
| 77 | All Site work as defined above including supply and installation of erection accessories, cabling, glanding, termination, etc.as required for installation, testing and commissioning of Fully Wired CRCA Console consisting all hardware, necessary accessories complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirement. |
| 78 | All Site work as defined above including supply and installation of IS grade Structural Steel supports of MS including channels, angles, Pipes, plates etc complete in all respect, as required for erection of all the supplied equipment as per the tender requirement. |
| 79 | All the works required for integration of the supplied Type-2 MPLS-TP equipment with the existing Telecom Network of IGGL NEGG pipeline including supply and installation of all required hardware and software at both ends, configuration in existing NMS of MPLS-TP system, configuration in existing MPLS-TP equipment, etc. as required, complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirements. |
| 80 | All the works required for integration of the supplied NMS of Type-2 MPLS-TP equipment with the existing Telecom Network of IGGL NEGG pipeline including supply and installation of all required hardware and software at both ends, configuration in existing NMS of MPLS-TP system, configuration in existing MPLS-TP equipment, etc. as required, complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirements. |
| 81 | All the works required for integration of the supplied CCTV Cameras with the existing CCTV Servers (Tentatively at MMS and BMS-1 location) of Telecom Network of IGGL NEGG pipeline including supply and installation of all required hardware and software at both ends, configuration in existing NMS of MPLS-TP system, configuration in existing MPLS-TP equipment, configuration in existing CCTV system etc. as required, complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirements. |
| 82 | All the works required for integration of the supplied explosion proof IP Phones with the existing IP EPABX (Tentatively at MMS, BMS-1 and BMS-2 locations) of Telecom Network of IGGL NEGG pipeline including supply and installation of all required hardware and software at both ends, configuration in existing NMS of MPLS-TP system, configuration in existing MPLS-TP equipment, configuration in existing EPABX system etc. as required, complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirements. |
| 83 | All the works required for integration of the supplied and free issued Type-1 MPLS-TP (10G) equipment with the existing NMS (tentatively at MMS, BMS-1 and BMS-2 locations) of Telecom Network of IGGL NEGG pipeline including supply and installation of all required hardware and software at both ends, configuration in existing NMS of MPLS-TP system, configuration in existing MPLS-TP equipment, etc. as required, complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirements. |
| 84 | All Site work as defined above for Integration and Augmentation of all the signals of the supplied Type-2 RTU with the existing SCADA and APPS system of IGGL NEGG pipeline, including supply of all hardware, software, licenses, development of graphics, reports, tags , mapping, simulation etc. as required, complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirements. |
| 85 | All Site work as defined above for Integration and Augmentation of all the signals of the supplied and free issued Type-1 RTU with the existing SCADA and APPS system of IGGL NEGG pipeline, including supply of all hardware, software, licenses, development of graphics, reports, tags , mapping, simulation etc. as required, complete in all respect, as required and as per Particular job specification, technical specification and various clauses as per tender requirements. |
| 86 | Shifting of Existing spare equipment(Type-1 MPLS-TP equipment with fully wired panel, CCTV cameras, IP phones etc) of existing telecommunication system from existing store location of Assam , Tripura and Meghalaya states to respective stations including transportation, insurance, loading, unloading at site, of all equipment of existing telecommunication system, complete in all respect as per the tender. The details of existing store location in Assam state, Tripura state and Meghalaya is mentioned in the tender. If any fault or damage is observed in the system during transportation, the same shall be rectified or replaced by the bidder without any cost implication to IGGL/ MECON. All the required documents shall be provided by IGGL and payment of all required taxes shall be carried out by IGGL. The shifting shall be carried out as per the following details – i. From existing store location in Assam to Injection Point station of ONGC, SUAB WHISource, near Jorhat/ Golaghat, Assamii. From existing store location in Assam to Injection Point station of ONGC, Koraghat Source, near Jorhat/ Golaghat, Assamiii. From existing store location in Tripura to Injection Point station of ONGC, Barbejia WHI Source, near Jorhat/ Golaghat, Assamiv. From existing store location in Meghalaya to CGD station of NEGDCL near Tejpur in Assam |
| 87 | Shifting of Existing spare equipment(Type-1 RTUequipment with fully wired panel etc) of existing SCADA and APPS system from existing store location of Assam to respective stations including transportation, insurance, loading, unloading at site, of all equipment of existing SCADA and APPS system, complete in all respect as per the tender. The details of existing store location in Assam state is mentioned in the tender. If any fault or damage is observed in the system during transportation, the same shall be rectified or replaced by the bidder without any cost implication to IGGL/ MECON. All the required documents shall be provided by IGGL and payment of all required taxes shall be carried out by IGGL. The shifting shall be carried out as per the following details – i. From existing store location in Assam to Injection Point station of ONGC, Barbejia WHI Source, near Jorhat/ Golaghat, Assamii. From existing store location in Assam to Injection Point station of ONGC, CGD station of NEGDCL, near Tejpur, Assam |
| 88 | Training for MPLS-TP System at site and at OEM works / integration centre,as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 89 | Training for RTU System at site and at OEM works / integration centre,as required complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement |
| 90 | All inclusive per month rates for maintaining store at site (State wise / regions wise for the complete supplied material). Any land, area or building of any type will not be provided by IGGL/ MECON for storage of materials. All the required area/ land/ building for storage of all supplied items shall be arranged by the bidder and is included in scope of the bidder.(Refer Note 8 of MR) |
| 91 | Total price including all costs including GST for SiteWorks |
| 92 | PART 3 - Post Warranty Period |
| 93 | Comprehensive Post warranty maintenance contract (PWMC) as defined in the bid document for complete suppliedsystem for 5 years after completion of main warranty, as required, complete in all respect as per Particular job specification, technical specification and various clauses as per tender requirement. |
| 94 | Comprehensive Post Warranty Maintenance for First year after completion of warranty. |
| 95 | Comprehensive Post Warranty Maintenance for Second year after completion of warranty. |
| 96 | Comprehensive Post Warranty Maintenance for Third year after completion of warranty. |
| 97 | Comprehensive Post Warranty Maintenance for Fourth year after completion of warranty. |
| 98 | Comprehensive Post Warranty Maintenance for Fifth year after completion of warranty. |
| 99 | Total price including all costs including GST forPost Warranty Period |
| 100 | NOTE:1. The offer shall be evaluated on package wise basis ( Supply + Site Works +Post warranty maintenance contract ).2.The above shall be read in conjunction with notes of MR and technical volume |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail