Repair And Maintenance To Shifting Of Statue Near Main Gate Power House, Ukhep, Bariniput And Signage Of “Upper Kolab Power House”, Ukhep, Bariniput
Tender Value
5.29 Lakhs
Estimated cost
Bid Submission
30 Jun 2025
0 days left
EMD
5294
Bank guarantee accepted
Document Fee
4720
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
bariniput → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
repair and maintenance to shifting of Statue near Main Gate Power House, UKHEP, Bariniput and Signage of “UPPER KOLAB POWER HOUSE”, UKHEP, Bariniput
BOQ
| Sl. No. | Item Description |
| 1 | PART_I: R/M to shifting of Statue near Main Gate Power House, UKHEP, Bariniput. |
| 2 | Earth work instoneyearthandgravelmixedwithstoneandbouldernotexceeding 0.014cuminvolumewithin50m intial lead & 1.50 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost ofall labour, T & P, sundries and labour cess etc complete and as per direction of Engineer-in-Charge. |
| 3 | Dismantling brick or stone masonry in lime or cement mortar under 3mtr. height including stacking the usefulmaterials for reuse and removing the debries within 50mtr lead includingall labour,T & P, sundries,lead, lift, delift and labour cess etccomplete and as per direction of Engineer-in-Charge. |
| 4 | Fillingfoundation& plinthwith sand, well watered & rammed including cost,conveyance, royalty, T&P, sundries, lead, lift, delift and labour cessetccomplete and as per direction of Engineer-in-Charge. |
| 5 | Cement concrete (1:3:6) with 40mmsize HGCB metal including cost, conveyance, royalty,lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 6 | Randomrubblehardgranitestonemasonryincementmortar(1:4)infoundationandplinthincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess andwateringetc complete and as per direction of Engineer-in-Charge. |
| 7 | Cement concrete (1:2:4)for R.C.Cworks with 12mm size HGCB chipsincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 8 | Supplying, fitting and placing uncoated HYSD bar TATA Tiscon Fe-500D/ SAILISI bar Reinforcement complete as per drawing and technical specification including cost, conveyance ,all labour, T&P , sundries, labour cessetc completeand as per direction of Engineer-in-Charge. |
| 9 | Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost ofallmaterials complete including all labour, T&P, sundries, lead,lift,delift andlabourcess etc completeand as per direction of Engineer-in-Charge.RCC Foundation, plinth band and footing bases of columns, mass concrete and precast RCC slabs, etc. |
| 10 | Cement concrete (1:2:4)for P.C.Cworks with 12mm size HGCB chipsincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 11 | Shiftingchargesof statuewithin15.00mtrdistance fromitsoriginalposition by any mechanical meansandreinstallingthesameinpositionwithoutanydamagetothestatue including allmaterials, labour, T & P, sundries, lead, lift, delift, carriage, installing charges, machineries &labourcess etccomplete and as per direction of Engineer-in-Charge. |
| 12 | 12mm thick cement plaster (1:4) over brick masonryetc including cost, conveyance, royalty, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 13 | Providing and fixinggranitetilesindadosskirtingandrisersofstepson12 mmthickcementplaster (1:3)jointedwithneatcementslurrymixedwithpigmentstomatchthe shadeofthetiles includingrubbingandpolishingcompleteincluding cost ofall material , labour T&P, sundries,lead,liftdelift& labour cess &curing etc complete and as per direction of Engineer-in-Charge. |
| 14 | Priming one coat to walls with wall cementprimer (ISI)including cost of primer water boundofAsian / Berger / Shalimarmake including all labour, T&P, sundries, brush, scaffolding,putty andlabour cess etc complete and as per direction of Engineer-in-Charge. |
| 15 | Paintingtwo coats to outside wallssurfacewith exteriorweathercoat paint(ISI)ofapprovedshadeofAsian/Berger/Shalimar / Nerolac / Duluxoranyequivalent make on old work to give an even shade atallheightincluding cost ofweathercoatpaint,T&P,sundries, alllabour,brush, puttyandlabourcess&scaffoldingetccomplete and as per direction of Engineer-in-Charge. |
| 16 | Disposalofbuildingrubbish / malba / similarunserviceable,dismantledorwastematerialsorexcavatedearthetcbymechanicalmeans,includingloading,transporting, unloadingtoapprovedmunicipaldumpinggroundor asapprovedbyEngineer-in-chargewithin5.00 Kmawayfromtheworksiteincludingcostofalllabour, conveyance , T&P,sundries, lead, lift, delift,labour cessetc complete. |
| 17 | Providing,fitting and fixingconcretechequered tilesin floorsofsize 30cm x 30cm x 2.5cm oflocalmake laidon20mmthickcementmortar(1:4)andfillingthejoints withneatcement slurry including costofallmaterials, labour,T & P,sundries, lead,lift,delift,carriageandlabourcess etc complete and as per direction of Engineer-in-Charge. |
| 18 | PART_II:Signage of “UPPER KOLAB POWER HOUSE”, UKHEP, Bariniput |
| 19 | Earth work instoneyearthandgravelmixedwithstoneandbouldernotexceeding 0.014cuminvolumewithin50m intial lead & 1.50 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost ofall labour, T & P, sundries and labour cess etc complete and as per direction of Engineer-in-Charge. |
| 20 | Fillingfoundation& plinthwith sand, well watered & rammed including cost,conveyance, royalty, T&P, sundries, lead, lift, delift and labour cessetccomplete and as per direction of Engineer-in-Charge. |
| 21 | Cement concrete (1:3:6) with 40mmsize HGCB metal including cost, conveyance, royalty,lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 22 | Randomrubblehardgranitestonemasonryincementmortar1:4)infoundationandplinthincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess andwateringetc complete and as per direction of Engineer-in-Charge. |
| 23 | Cement concrete (1:2:4)for R.C.Cworks with 12mm size HGCB chipsincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 24 | Supplying, fitting and placing uncoated HYSD bar TATA Tiscon Fe-500D/ SAILISI bar Reinforcement complete as per drawing and technical specification including cost, conveyance ,all labour, T&P , sundries, labour cessetc complete and as per direction of Engineer-in-Charge. |
| 25 | Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost ofallmaterials complete including all labour, T&P, sundries, lead,lift,delift andlabourcess etc complete and as per direction of Engineer-in-Charge. |
| 26 | RCC foundation, plinth bandand footing bases of cloumns , mass concrete and precast RCC slab etc |
| 27 | Cement concrete (1:2:4)for P.C.Cworks with 12mm size HGCB chipsincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 28 | Brick work with fly ash brick23cmx11cm x8cm size having crushing strengthnot less than 75kg/sqcm with dimensional tolerance ±8 % in cement mortar (1:4)in foundation & plinth and superstructureincludingcost,conveyance, royalties, all labour,T & P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 29 | 12mm thick cement plaster (1:4) overbrickmasonry etc including cost, conveyance, royalty, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 30 | Providing and fixinggranitetilesindadosskirtingandrisersofstepson12 mmthickcementplaster (1:3)jointedwithneatcementslurrymixedwithpigmentstomatchthe shadeofthetiles includingrubbingandpolishingcompleteincluding cost ofall material , labour T&P, sundries,lead,liftdelift& labour cess &curing etc complete and as per direction of Engineer-in-Charge. |
| 31 | Providing&fixingstain lesssteellettersbothin\"ODIA\" and\"ENGLISH\"onthepreparedverticalmasonrystructurehavinggranitetilebase including alllabour, T & P, sundries, lead, lift, delift, carriage,fixingchargesetccomplete and as per direction of Engineer-in-Charge. |
AI Tender Summary
Tender Timeline
Jun 23, 2025
11:30 IST
Tender Published
Tender notice published.
CompletedJun 30, 2025
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 01, 2025
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender