| 1 | PART_I: R/M to shifting of Statue near Main Gate Power House, UKHEP, Bariniput. |
| 2 | Earth work instoneyearthandgravelmixedwithstoneandbouldernotexceeding 0.014cuminvolumewithin50m intial lead & 1.50 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost ofall labour, T & P, sundries and labour cess etc complete and as per direction of Engineer-in-Charge. |
| 3 | Dismantling brick or stone masonry in lime or cement mortar under 3mtr. height including stacking the usefulmaterials for reuse and removing the debries within 50mtr lead includingall labour,T & P, sundries,lead, lift, delift and labour cess etccomplete and as per direction of Engineer-in-Charge. |
| 4 | Fillingfoundation& plinthwith sand, well watered & rammed including cost,conveyance, royalty, T&P, sundries, lead, lift, delift and labour cessetccomplete and as per direction of Engineer-in-Charge. |
| 5 | Cement concrete (1:3:6) with 40mmsize HGCB metal including cost, conveyance, royalty,lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 6 | Randomrubblehardgranitestonemasonryincementmortar(1:4)infoundationandplinthincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess andwateringetc complete and as per direction of Engineer-in-Charge. |
| 7 | Cement concrete (1:2:4)for R.C.Cworks with 12mm size HGCB chipsincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 8 | Supplying, fitting and placing uncoated HYSD bar TATA Tiscon Fe-500D/ SAILISI bar Reinforcement complete as per drawing and technical specification including cost, conveyance ,all labour, T&P , sundries, labour cessetc completeand as per direction of Engineer-in-Charge. |
| 9 | Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost ofallmaterials complete including all labour, T&P, sundries, lead,lift,delift andlabourcess etc completeand as per direction of Engineer-in-Charge.RCC Foundation, plinth band and footing bases of columns, mass concrete and precast RCC slabs, etc. |
| 10 | Cement concrete (1:2:4)for P.C.Cworks with 12mm size HGCB chipsincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 11 | Shiftingchargesof statuewithin15.00mtrdistance fromitsoriginalposition by any mechanical meansandreinstallingthesameinpositionwithoutanydamagetothestatue including allmaterials, labour, T & P, sundries, lead, lift, delift, carriage, installing charges, machineries &labourcess etccomplete and as per direction of Engineer-in-Charge. |
| 12 | 12mm thick cement plaster (1:4) over brick masonryetc including cost, conveyance, royalty, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 13 | Providing and fixinggranitetilesindadosskirtingandrisersofstepson12 mmthickcementplaster (1:3)jointedwithneatcementslurrymixedwithpigmentstomatchthe shadeofthetiles includingrubbingandpolishingcompleteincluding cost ofall material , labour T&P, sundries,lead,liftdelift& labour cess &curing etc complete and as per direction of Engineer-in-Charge. |
| 14 | Priming one coat to walls with wall cementprimer (ISI)including cost of primer water boundofAsian / Berger / Shalimarmake including all labour, T&P, sundries, brush, scaffolding,putty andlabour cess etc complete and as per direction of Engineer-in-Charge. |
| 15 | Paintingtwo coats to outside wallssurfacewith exteriorweathercoat paint(ISI)ofapprovedshadeofAsian/Berger/Shalimar / Nerolac / Duluxoranyequivalent make on old work to give an even shade atallheightincluding cost ofweathercoatpaint,T&P,sundries, alllabour,brush, puttyandlabourcess&scaffoldingetccomplete and as per direction of Engineer-in-Charge. |
| 16 | Disposalofbuildingrubbish / malba / similarunserviceable,dismantledorwastematerialsorexcavatedearthetcbymechanicalmeans,includingloading,transporting, unloadingtoapprovedmunicipaldumpinggroundor asapprovedbyEngineer-in-chargewithin5.00 Kmawayfromtheworksiteincludingcostofalllabour, conveyance , T&P,sundries, lead, lift, delift,labour cessetc complete. |
| 17 | Providing,fitting and fixingconcretechequered tilesin floorsofsize 30cm x 30cm x 2.5cm oflocalmake laidon20mmthickcementmortar(1:4)andfillingthejoints withneatcement slurry including costofallmaterials, labour,T & P,sundries, lead,lift,delift,carriageandlabourcess etc complete and as per direction of Engineer-in-Charge. |
| 18 | PART_II:Signage of “UPPER KOLAB POWER HOUSE”, UKHEP, Bariniput |
| 19 | Earth work instoneyearthandgravelmixedwithstoneandbouldernotexceeding 0.014cuminvolumewithin50m intial lead & 1.50 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost ofall labour, T & P, sundries and labour cess etc complete and as per direction of Engineer-in-Charge. |
| 20 | Fillingfoundation& plinthwith sand, well watered & rammed including cost,conveyance, royalty, T&P, sundries, lead, lift, delift and labour cessetccomplete and as per direction of Engineer-in-Charge. |
| 21 | Cement concrete (1:3:6) with 40mmsize HGCB metal including cost, conveyance, royalty,lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 22 | Randomrubblehardgranitestonemasonryincementmortar1:4)infoundationandplinthincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess andwateringetc complete and as per direction of Engineer-in-Charge. |
| 23 | Cement concrete (1:2:4)for R.C.Cworks with 12mm size HGCB chipsincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 24 | Supplying, fitting and placing uncoated HYSD bar TATA Tiscon Fe-500D/ SAILISI bar Reinforcement complete as per drawing and technical specification including cost, conveyance ,all labour, T&P , sundries, labour cessetc complete and as per direction of Engineer-in-Charge. |
| 25 | Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost ofallmaterials complete including all labour, T&P, sundries, lead,lift,delift andlabourcess etc complete and as per direction of Engineer-in-Charge. |
| 26 | RCC foundation, plinth bandand footing bases of cloumns , mass concrete and precast RCC slab etc |
| 27 | Cement concrete (1:2:4)for P.C.Cworks with 12mm size HGCB chipsincluding cost, conveyance , royalty, all labour, T&P,sundries, lead, lift, delift,labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 28 | Brick work with fly ash brick23cmx11cm x8cm size having crushing strengthnot less than 75kg/sqcm with dimensional tolerance ±8 % in cement mortar (1:4)in foundation & plinth and superstructureincludingcost,conveyance, royalties, all labour,T & P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 29 | 12mm thick cement plaster (1:4) overbrickmasonry etc including cost, conveyance, royalty, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 30 | Providing and fixinggranitetilesindadosskirtingandrisersofstepson12 mmthickcementplaster (1:3)jointedwithneatcementslurrymixedwithpigmentstomatchthe shadeofthetiles includingrubbingandpolishingcompleteincluding cost ofall material , labour T&P, sundries,lead,liftdelift& labour cess &curing etc complete and as per direction of Engineer-in-Charge. |
| 31 | Providing&fixingstain lesssteellettersbothin\"ODIA\" and\"ENGLISH\"onthepreparedverticalmasonrystructurehavinggranitetilebase including alllabour, T & P, sundries, lead, lift, delift, carriage,fixingchargesetccomplete and as per direction of Engineer-in-Charge. |